My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Kamins Construction Inc Pacific Ave to Interurban Trail Bicycle Safety
>
Contracts
>
JOC
>
Kamins Construction Inc Pacific Ave to Interurban Trail Bicycle Safety
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2019 10:36:28 AM
Creation date
10/21/2019 10:23:58 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Kamins Construction Inc
Approval Date
9/20/2019
Council Approval Date
9/4/2019
Department
Public Works
Department Project Manager
Christina Curtis
Subject / Project Title
Pacific Avenue to Interurban Trail Bicycle
Public Works WO Number
PW3688
Total Compensation
$520,116.00
Contract Type
JOC
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
527
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 Structural shoring and cofferdams shall be designed for conditions stated in this Section <br /> 2 using methods shown in Division I Section 5 of the AASHTO Standard Specifications for <br /> 3 Highway Bridges Seventeenth Edition—2002 for allowable stress design, or the AASHTO <br /> 4 LRFD Bridge Design Specifications for load and resistance factor design. <br /> 5 <br /> 6 3-01.AP3 <br /> 7 Section 3-01, Production from Quarry and Pit Sites <br /> 8 April 2, 2018 <br /> 9 3-01.1 Description <br /> 10 The first paragraph is revised to read: <br /> 11 <br /> 12 This Work shall consist of manufacturing and producing crushed and screened <br /> 13 aggregates including pit run aggregates of the kind, quality, and grading specified for use <br /> 14 in the construction of concrete, hot mix asphalt, crushed surfacing, maintenance rock, <br /> 15 ballast, gravel base, gravel backfill. gravel borrow, riprap, and bituminous surface <br /> 16 treatments of all descriptions. <br /> 17 <br /> 18 4-04.AP4 <br /> 19 Section 4-04, Ballast and Crushed Surfacing <br /> 20 April 2, 2018 <br /> 21 4-04.3(5) Shaping and Compaction <br /> 22 This section is supplemented with the following new paragraph: <br /> 23 <br /> 24 When using 100% Recycled Concrete Aggregate, the Contractor may submit a written <br /> 25 request to use a test point evaluation for compaction acceptance testing in lieu of <br /> 26 compacting to 95% of the standard density as determined by the requirements of Section <br /> 27 2-03.3(14)D. The test point evaluation shall be performed in accordance with SOP 738. <br /> 28 <br /> 29 5-01.AP5 <br /> 30 Section 5-01, Cement Concrete Pavement Rehabilitation <br /> 31 January 7, 2019 <br /> 32 5-01.2 Materials <br /> 33 The reference for Concrete Patching Material is revised to read: <br /> 34 <br /> 35 Concrete Patching Material, Grout, and Mortar 9-20.1 <br /> 36 <br /> 37 5-01.3(1)A1 Concrete Patching Materials <br /> 38 In this section. each reference to "9-20" is revised to read "9-20.1". <br /> 39 <br /> 40 5-01.3(4) Replace Cement Concrete Panel <br /> 41 This section's content is deleted and replaced with the following new subsections: <br /> 42 <br /> 43 5-01.3(4)A General <br /> 44 <br /> 45 Curing, cold weather work, concrete pavement construction in adjacent lines, and <br /> protection of pavement shall meet the requirements of Section 5-05.3(13) through Section <br /> 46 5-05.3(15). The Contractor, at no cost to the Contracting Agency, shall repair any damage <br /> ' 47 to existing pavement caused by the Contractor's operations. <br /> 48 <br /> CITY OF EVERETT AMENDMENTS <br /> PACIFIC AVENUE TO INTERURBAN TRAIL BICYCLE SAFETY PROJECT 8/12/2019 <br /> STATE FUND#HLP PB17(014); COE#PW3688 Page AM-13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.