My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Kamins Construction Inc Pacific Ave to Interurban Trail Bicycle Safety
>
Contracts
>
JOC
>
Kamins Construction Inc Pacific Ave to Interurban Trail Bicycle Safety
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2019 10:36:28 AM
Creation date
10/21/2019 10:23:58 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Kamins Construction Inc
Approval Date
9/20/2019
Council Approval Date
9/4/2019
Department
Public Works
Department Project Manager
Christina Curtis
Subject / Project Title
Pacific Avenue to Interurban Trail Bicycle
Public Works WO Number
PW3688
Total Compensation
$520,116.00
Contract Type
JOC
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
527
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 5-01.3(4)B Sawing and Dimensional Requirements I 2 Concrete slabs to be replaced as shown in the Plans or staked by the Engineer shall be <br /> 3 at least 6.0 feet long and full width of an existing pavement panel. The portion of the panel <br /> 4 to remain in place shall have a minimum dimension of 6 feet in length and full panel width; <br /> I <br /> 5 otherwise the entire panel shall be removed and replaced. There shall be no new joints <br /> 6 closer than 3.0 feet to an existing transverse joint or crack. A vertical full depth saw cut is <br /> 7 required along all longitudinal joints and at transverse locations and, unless the Engineer <br /> 8 allows otherwise, an additional vertical full depth relief saw cut located 12 to 18 inches <br /> I <br /> 9 from and parallel to the initial longitudinal and transverse saw cut locations is also <br /> 10 required. Removal of existing cement concrete pavement shall not cause damage to <br /> 11 adjacent slabs that are to remain in place. In areas that will be ground, slab replacements I 12 shall be performed prior to pavement grinding. <br /> 13 <br /> 14 Side forms shall meet the requirements of Section 5-05.3(7)B whenever a sawed full depth <br /> I <br /> 15 vertical face cannot be maintained. <br /> 16 <br /> 17 5-01.3(4)C Dowel Bars and Tie Bars <br /> 18 For the half of a dowel bar or tie bar placed in fresh concrete, comply with the requirements <br /> I <br /> 19 of Section 5-05. <br /> 20 <br /> 21 For the half of a dowel bar or tie bar placed in hardened concrete, comply with the I 22 Standard Plans and the following. <br /> 23 <br /> 24 After drilling, secure dowel bars and tie bars into the existing pavement with either an <br /> I <br /> 25 epoxy bonding agent Type I or IV as specified in Section 9-26.1, or a grout Type 2 for non- <br /> 26 shrink applications as specified in Section 9-20.3. <br /> 27 <br /> 28 Dowel bars shall be placed at the mid depth of the concrete slab, centered over the <br /> I <br /> 29 transverse joint, and parallel to the centerline and to the roadway surface, within the <br /> 30 tolerances in the table below. Dowel bars may be adjusted to avoid contact with existing <br /> 31 dowel bars in the transverse joint at bridge approach slabs or existing panels provided the <br /> 32 adjusted dowel bars meet the tolerances below. <br /> 33 <br /> 34 Tie bars shall be placed at the mid depth of the concrete slab, centered over the joint, <br /> I <br /> 35 perpendicular to centerline, and parallel to the roadway surface, within the tolerances in <br /> 36 the table below. The horizontal position of tie bars may be adjusted to avoid contact with <br /> 37 existing tie bars in the longitudinal joint where panel replacement takes place. provided <br /> 38 the adjusted tie bars meet the tolerances below. I 39 <br /> Placement Tolerances j <br /> Dowel Bars Tie Bars 1 <br /> I <br /> Vertical: Center of Bar to Center of Slab ' ± 1.00 inch max ± 1.00 inch max <br /> Depth <br /> Dowel Bar Centered Over the ± 1.00 inch max N/A IIITransverse Joint <br /> Tie Bar Centered Over the Longitudinal N/A I ± 1.00 inch max <br /> Joint <br /> I <br /> Parallel to Centerline Over the Length ± 0.50 inch max N/A <br /> of the Dowel Bar <br /> Perpendicular to Longitudinal Joint Over N/A ± 1.00 inch max <br /> the Length of the Tie Bar I 1 <br /> I <br /> CITY OF EVERETT AMENDMENTS I <br /> PACIFIC AVENUE TO INTERURBAN TRAIL BICYCLE SAFETY PROJECT 8/12!2019 <br /> STATE FUND#HLP PB17(014); COE#PW3688 Page AM-14 <br /> I <br />