My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Kamins Construction Inc Pacific Ave to Interurban Trail Bicycle Safety
>
Contracts
>
JOC
>
Kamins Construction Inc Pacific Ave to Interurban Trail Bicycle Safety
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2019 10:36:28 AM
Creation date
10/21/2019 10:23:58 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Kamins Construction Inc
Approval Date
9/20/2019
Council Approval Date
9/4/2019
Department
Public Works
Department Project Manager
Christina Curtis
Subject / Project Title
Pacific Avenue to Interurban Trail Bicycle
Public Works WO Number
PW3688
Total Compensation
$520,116.00
Contract Type
JOC
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
527
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> Travel lanes where cement <br /> Iconcrete grinding is shown in Control profile <br /> the plans <br /> Additional locations Control profile <br /> I <br /> designated by the Engineer <br /> i Travel lanes with completed <br /> cement concrete pavement Acceptance profile <br /> I grinding <br /> Bridges, approach panels <br /> and 0.02 miles before and <br /> I after bridges and approach Control and acceptance <br /> panels and other excluded profile <br /> areas within lanes requiring <br /> testing <br /> I <br /> Tapers Ramps. Shoulders and Do not test <br /> 1 <br /> I 2 Within 30 calendar days after the Contractor's testing, the Engineer may perform <br /> 3 verification testing. If the verification testing shows a difference in MRI greater than the <br /> 4 10 percent, the following resolution process will be followed: <br /> I 5 <br /> 6 1. The profiles, equipment and procedures will be evaluated to determine the cause <br /> 7 of the difference. <br /> I 8 <br /> 9 2. If the cause of the discrepancy cannot be resolved the pavement shall be <br /> 10 retested with both profilers at a mutually agreed time. The two profilers will test <br /> 11 the section within 30 minutes of each other. If the retest shows a difference in <br /> I 12 MRI equal or greater than the percentages shown in Table 2 of AASHTO R 54 <br /> 13 the Engineer's test results will be used for pavement smoothness acceptance. <br /> 14 <br /> 15 The Contractor shall evaluate profiles for acceptance or corrective action using the current <br /> 16 version of ProVAL and provide the results including the profile data in unfiltered electronic <br /> 17 Engineering Research Division (ERD) file format to the Engineer within 3 calendar days <br /> 18 of completing each days profile testing. If the profile data files are created using an export <br /> I19 option in the manufacturer's software where filter settings can be specified, use the filter <br /> 20 settings that were used to create data files for certification. <br /> 21 <br /> I 22 Analyze the entire profile. Exclude areas listed in Table 3. <br /> 23 <br /> Table 3 <br /> I Areas Excluded from MRI Acceptance Requirements <br /> Location Exclude <br /> Beginning and end of Pavement within 0.02 mile <br /> I grinding <br /> The bridge and approach <br /> Bridges and approach slabs slab and 0.02 mile from the <br /> ends of the bridge or <br /> I <br /> approach slab <br /> Defects in the existing 0.01-mile section containing <br /> roadway identified by the the defect and the 0.01-mile <br /> I Contractor that adversely section following the section <br /> affect the MRI such as dips, with the defect. <br /> 1 CITY OF EVERETT AMENDMENTS <br /> PACIFIC AVENUE TO INTERURBAN TRAIL BICYCLE SAFETY PROJECT 8/12/2019 <br /> I <br /> STATE FUND#HLP PBI7(014); COE#PW3688 Page AM-17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.