My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Kamins Construction Inc Pacific Ave to Interurban Trail Bicycle Safety
>
Contracts
>
JOC
>
Kamins Construction Inc Pacific Ave to Interurban Trail Bicycle Safety
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2019 10:36:28 AM
Creation date
10/21/2019 10:23:58 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Kamins Construction Inc
Approval Date
9/20/2019
Council Approval Date
9/4/2019
Department
Public Works
Department Project Manager
Christina Curtis
Subject / Project Title
Pacific Avenue to Interurban Trail Bicycle
Public Works WO Number
PW3688
Total Compensation
$520,116.00
Contract Type
JOC
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
527
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 3/8 inch 0.25 feet 0.30 feet <br /> I 1 <br /> 2 5-04.3(8) Aggregate Acceptance Prior to Incorporation in HMA <br /> 3 The following new paragraph is inserted after the first paragraph: <br /> I 4 <br /> 5 The Contracting Agency's combined aggregate bulk specific gravity(Gsb) blend as shown <br /> 6 on the HMA Mix Design will be used for VMA calculations until the Contractor submits a <br /> I <br /> 7 <br /> 8 written request for a Gsb test. The new Gsb will be used in the VMA calculations for HMA <br /> from the date the Engineer receives the written request for a Gsb retest. The Contractor <br /> 9 may request aggregate specific gravity (Gsb) testing be performed by the Contracting <br /> I <br /> 10 <br /> 11 Agency twice per project. The Gsb blend of the combined stockpiles will be used to <br /> calculate voids in mineral aggregate (VMA) of any HMA produced after the new Gsb is <br /> 12 determined. <br /> 13 <br /> I14 5-04.3(9)A1 Test Section — When Required, When to Stop <br /> 15 The following new row is inserted after the second row in Table 9: <br /> 16 <br /> IVMA Minimum PF; of 0.95 Nonebased on the criteria in <br /> Section 5-04.3(9)B42 <br /> I 17 <br /> 18 5-04.3(9)A2 Test Section — Evaluating the HMA Mixture in a Test Section <br /> 19 In Table 9a, the test property"Gradation,Asphalt Binder, and Va" is revised to read "Gradation, <br /> I 20 Asphalt Binder, VMA, and Va" <br /> 21 <br /> 22 In Table 9a, the first column of the third row is revised to read: <br /> 23 <br /> I Aggregates: <br /> Sand Equivalent <br /> Uncompacted Void <br /> I Content <br /> Fracture <br /> 24 <br /> I 25 5-04.3(9)B3 Mixture Statistical Evaluation — Acceptance Testing <br /> 26 In Table 11, "Va" is revised to read "VMA and Va" <br /> 27 <br /> I 28 5-04.3(9)B5 Mixture Statistical Evaluation — Composite Pay Factors (CPF) <br /> 29 The following new row is inserted above the last row in Table 12: <br /> 30 <br /> Voids in Mineral Aggregate 2 1 <br /> I (VMA) . <br /> 31 <br /> 32 5-04.3(9)B7 Mixture Statistical Evaluation — Retests <br /> I 33 The second to last sentence is revised to read: <br /> 34 <br /> 35 The sample will be tested for a complete gradation analysis, asphalt binder content, VMA <br /> I <br /> 36 and Va, and the results of the retest will be used for the acceptance of the HMA mixture in <br /> 37 place of the original mixture sublot sample test results. <br /> 38 <br /> I <br /> 39 5-04.3(10)A HMA Compaction — General Compaction Requirements <br /> 40 The last paragraph is revised to read: <br /> ICITY OF EVERETT AMENDMENTS <br /> PACIFIC AVENUE TO INTERURBAN TRAIL BICYCLE SAFETY PROJECT 8/12/2019 <br /> I <br /> STATE FUND#HLP PB17(014); COE#PW3688 Page AM-21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.