Laserfiche WebLink
I <br /> I 1 5-05.4 Measurement <br /> 2 Item number 3 of the second paragraph is revised to read: <br /> 3 <br /> 4 3. The depth shall be determined in accordance with Section 5-05.5(1). The depth <br /> I <br /> 5 utilized to calculate the volume shall not exceed the Plan depth plus 0.04 feet. <br /> 6 <br /> 7 The third paragraph is revised to read: <br /> I 8 <br /> 9 The volume of cement concrete pavement in each thickness lot shall equal the measured <br /> 10 length x width x thickness measurement. <br /> I 11 <br /> 12 The last paragraph is revised to read: <br /> 13 <br /> 14 The calculation for cement concrete compliance adjustment is the volume of concrete <br /> 15 represented by the CPF and the Thickness deficiency adjustment. <br /> 16 <br /> 17 5-05.5 Payment <br /> I 18 The paragraph following the Bid item "Cement Conc. Pavement", per cubic yard is <br /> 19 supplemented with the following: <br /> 20 <br /> I <br /> 21 <br /> 22 All costs associated with performing the magnetic pulse induction thickness testing shall <br /> be included in the unit Contract price per cubic yard for "Cement Conc. Pavement". <br /> 23 <br /> 24 The Bid item "Ride Smoothness Compliance Adjustment", by calculation, and the paragraph <br /> I 25 following this bid item are revised to read: <br /> 26 <br /> 27 "Ride Smoothness Compliance Adjustment", by calculation. <br /> I 28 <br /> 29 Smoothness Compliance Adjustments will be based on the requirements in Section 5- <br /> 30 05.3(12) and the following calculations: <br /> I 31 <br /> 32 1. Final MRI acceptance and incentive/disincentive payments for pavement <br /> 33 smoothness will be calculated as the average of the ten 52.8-foot sections in <br /> 34 each 528 feet in accordance with the price adjustment schedule. <br /> I35 <br /> 36 a. For sections of a lane that are a minimum of 52.8 feet and less than 528 <br /> 37 feet, the price adjustment will be calculated using the average of the 52.8 <br /> I <br /> 38 foot MRI values and the price adjustment prorated for the length of the <br /> 39 section. <br /> 40 <br /> I <br /> 41 <br /> 42 b. MRI values per 52.8-feet that were measured prior to corrective work will be <br /> included in the 528 foot price adjustment for sections with corrective work. <br /> 43 <br /> 44 2. In addition to the price adjustment for MRI a smoothness compliance adjustment <br /> I45 will be calculated in the sum of minus $1000.00 for each and every section of <br /> 46 single traffic lane 52.8 feet in length in that does not meet the 10-foot straight <br /> 47 edge requirements in Section 5-05.3(12) after corrective Work. <br /> I 48 <br /> Price Adjustment Schedule <br /> MRI for each 528 ft. Pay Adjustment <br /> I section Schedule <br /> in. / mi. $ / 0.10 mi. J <br /> 1 CITY OF EVERETT AMENDMENTS <br /> PACIFIC AVENUE TO INTERURBAN TRAIL BICYCLE SAFETY PROJECT 8/12/2019 <br /> I <br /> STATE FUND#HLP PB17(014); COE#PW3688 Page AM-27 <br />