My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Kamins Construction Inc Pacific Ave to Interurban Trail Bicycle Safety
>
Contracts
>
JOC
>
Kamins Construction Inc Pacific Ave to Interurban Trail Bicycle Safety
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2019 10:36:28 AM
Creation date
10/21/2019 10:23:58 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Kamins Construction Inc
Approval Date
9/20/2019
Council Approval Date
9/4/2019
Department
Public Works
Department Project Manager
Christina Curtis
Subject / Project Title
Pacific Avenue to Interurban Trail Bicycle
Public Works WO Number
PW3688
Total Compensation
$520,116.00
Contract Type
JOC
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
527
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 of each 52.8-foot section with an MRI greater than 125 inches per mile with a 10-foot <br /> 2 straightedge within 14 calendar days or as allowed by the Engineer. The Contractor shall <br /> 3 identify all locations that require corrective work and provide the straight edge <br /> 4 measurements at each location that exceeds the allowable limit to the Engineer. If all <br /> I <br /> 5 measurements in a 52.8-foot section comply with smoothness requirements, the <br /> 6 Contractor shall provide the maximum measurement to the Engineer and a statement that <br /> 7 corrective work is not required. Unless allowed by the Engineer, corrective work shall be <br /> 8 taken by the Contractor for pavement identified by the Contractor or Engineer that does <br /> I <br /> 9 not meet the following requirements: <br /> 10 <br /> 11 1. The completed surface shall be of uniform texture, smooth, uniform as to crown I 12 and grade, and free from defects of all kinds. <br /> 13 <br /> 14 2. The completed surface shall not vary more than 1/ inch from the lower edge of a <br /> 15 10-foot straightedge placed on the surface parallel to the centerline. <br /> 16 <br /> 17 3. The completed surface shall vary not more than 1/4 inch in 10 feet from the rate <br /> 18 of transverse slope shown in the Plans. I 19 <br /> 20 All corrective work shall be completed at no additional expense, including traffic control, <br /> 21 to the Contracting Agency. Corrective work shall not begin until the concrete has reached <br /> 22 its design strength unless allowed by the Engineer. Pavement shall be repaired by one or <br /> 23 more of the following methods: <br /> 24 <br /> 25 1. Diamond grinding; repairs shall not reduce pavement thickness by more than 1/4 <br /> 26 inch less than the thickness shown in the Plans. When required by the Engineer, <br /> 27 the Contractor shall verify the thickness of the concrete pavement by coring. <br /> 28 Thickness reduction due to corrective work will not be included in thickness I 29 measurements for calculating the Thickness Deficiency in Section 5-05.5(1)A. <br /> 30 <br /> 31 2. Removal and replacement of the cement concrete pavement. I 32 <br /> 33 3. By other method allowed by the Engineer. <br /> 34 <br /> I <br /> 35 For repairs following MRI testing the repaired area shall be checked by the Contractor <br /> 36 with a 10-foot straightedge to ensure it no longer requires corrective work. With <br /> 37 concurrence of the Engineer an inertial profiler may be used in place of the 10-foot straight <br /> 38 edge. I 39 <br /> 40 If correction of the roadway as listed above either will not or does not produce satisfactory <br /> 41 results as to smoothness or serviceability the Engineer may accept the completed I 42 pavement and a credit will be calculated in accordance with Section 5-05.5. The credit will <br /> 43 be in addition to the price adjustment for MRI. Under these circumstances, the decision <br /> 44 whether to accept the completed pavement or to require corrective work as described <br /> 45 above shall be vested entirely in the Engineer. <br /> 46 <br /> 47 5-05.3(22) Repair of Defective Pavement Slabs <br /> 48 The last sentence of the fourth paragraph is revised to read: I <br /> 49 <br /> 50 All sandblasting residue shall be removed. <br /> 51 <br /> I <br /> CITY OF EVERETT AMENDMENTS I <br /> PACIFIC AVENUE TO INTERURBAN TRAIL BICYCLE SAFETY PROJECT 8/12/2019 <br /> STATE FUND#HLP PB17(014);COE#PW3688 Page AM-26 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.