Laserfiche WebLink
I <br /> 1 1 <br /> 2 The price reduction shall be computed by multiplying the percent price reduction in Table <br /> 3 2 by the unit Contract price by the volume of pavement represented by the thickness test <br /> 4 lot. <br /> I 5 <br /> 6 Additional cores may be taken by the Contractor to determine the limits of an area that <br /> 7 has a thickness deficiency greater than 0.04 feet. Cores shall be taken at the approximate <br /> I 8 center of the panel. Only the panels within the limits of the deficiency area as determined <br /> 9 by the cores will be subject to a price reduction or corrective action. The cores shall be <br /> 10 taken in the presence of the Engineer and delivered to the Engineer for measurement. All <br /> 11 costs for the additional cores including filling the core holes with patching material meeting <br /> 12 the requirements of Section 9-20 will be the responsibility of the Contractor. <br /> 13 <br /> 14 5-05.5(1)A Thickness Deficiency of 0.05 Foot or Less <br /> I <br /> 15 This section, including title, is revised to read: <br /> 16 <br /> 17 5-05.5(1)A Vacant <br /> I 18 <br /> 19 5-05.5(1)B Thickness Deficiency of More Than 0.05 Foot <br /> 20 This section, including title, is revised to read: <br /> I 21 <br /> 22 5-05.5(1)B Vacant <br /> 23 <br /> I 24 6-01.AP6 <br /> 25 Section 6-01, General Requirements for Structures <br /> 26 January 7, 2019 <br /> I 27 This section is supplemented with the following new subsections: <br /> 28 <br /> 29 6-01.16 Repair of Defective Work <br /> I 30 6-01.16(1) General <br /> 31 When using repair procedures that are described elsewhere in the Contract <br /> 32 Documents, the Working Drawing submittal requirements of this Section shall not <br /> I 33 apply to those repairs unless noted otherwise. <br /> 34 <br /> 35 Repair procedures for defective Work shall be submitted as Type 2 Working <br /> 36 T 2E Working <br /> shall <br /> Drawings. Type Drawings be submitted when required by the <br /> I37 Engineer. As an alternative to submitting Type 2 or 2E Working Drawings.. defective <br /> 38 Work within the limits of applicability of a pre-approved repair procedure may be <br /> 39 repaired using that procedure. Repairs using a pre-approved repair procedure shall <br /> I <br /> 40 be submitted as a Type 1 Working Drawing. <br /> 41 <br /> 42 Pre-approved repair procedures shall consist of the following: <br /> I 43 <br /> 44 • The procedures listed in Section 6-01.16(2) <br /> 45 <br /> 46 • For precast concrete, repair procedures in the annual plant approval <br /> I47 process documents that have been approved for use by the Contracting <br /> 48 Agency. <br /> 49 <br /> I <br /> 50 All Working Drawings for repair procedures shall include: <br /> 51 <br /> ICITY OF EVERETT AMENDMENTS <br /> PACIFIC AVENUE TO INTERURBAN TRAIL BICYCLE SAFETY PROJECT 8/12/2019 <br /> STATE FUND#HLP PBI7(014); COE#PW3688 Page AM-31 <br />