My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Kamins Construction Inc Pacific Ave to Interurban Trail Bicycle Safety
>
Contracts
>
JOC
>
Kamins Construction Inc Pacific Ave to Interurban Trail Bicycle Safety
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2019 10:36:28 AM
Creation date
10/21/2019 10:23:58 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Kamins Construction Inc
Approval Date
9/20/2019
Council Approval Date
9/4/2019
Department
Public Works
Department Project Manager
Christina Curtis
Subject / Project Title
Pacific Avenue to Interurban Trail Bicycle
Public Works WO Number
PW3688
Total Compensation
$520,116.00
Contract Type
JOC
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
527
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 9. Place and consolidate the patching material in accordance with the <br /> 2 manufacturer's recommendations. Work the material firmly into all <br /> 3 surfaces of the repair area with sufficient pressure to achieve proper <br /> 4 bond to the concrete. <br /> 5 <br /> 6 10. The patching material shall be textured, cured and finished in <br /> 7 accordance with the patching material manufacturer's <br /> 8 recommendations and/or the requirements for the repaired component. <br /> 9 Protect the newly placed patch from vibration in accordance with <br /> 10 Section 6-02.3(6)D. <br /> 11 <br /> 12 11. When the completed repair does not match the existing concrete color <br /> 13 and will be visible to the public, a sand and cement mixture that is color <br /> 14 matched to the existing concrete shall be rubbed, brushed, or applied <br /> 15 to the surface of the patching material and the concrete. <br /> 16 <br /> 17 6-01.10 Utilities Supported by or Attached to Bridges <br /> 18 In the third paragraph, "Federal Standard 595" is revised to read "SAE AMS Standard 595". <br /> 19 <br /> 20 6-01.12 Final Cleanup <br /> 21 The second sentence of the first paragraph is revised to read: <br /> 22 <br /> 23 Structure decks shall be clean. <br /> 24 <br /> 25 The second paragraph is deleted. <br /> 26 <br /> 27 6-02.AP6 <br /> 28 Section 6-02, Concrete Structures I <br /> 29 April 1, 2019 <br /> 30 6-02.1 Description <br /> 31 The first sentence is revised to read: <br /> 32 <br /> 33 This Work consists of the construction of all Structures (and their parts) made of portland <br /> 34 cement or blended hydraulic cement concrete with or without reinforcement, including <br /> 35 bridge approach slabs. <br /> o <br /> 37 6-02.2 Materials 1 <br /> 38 In the first paragraph, the references to "Portland Cement" and "Aggregates for Portland <br /> 39Cement Concrete" are revised to read: <br /> 40 1 41 Cement 9-01 <br /> 42 Aggregates for Concrete 9-03.1 <br /> 43 <br /> 44 The reference to metakaolin is deleted. <br /> 45 <br /> 46 6-02.3(2) Proportioning Materials <br /> 47 The second paragraph is revised to read: <br /> 48 <br /> 49 Unless otherwise specified, the Contractor shall use Type I or II portland cement or <br /> 50 blended hydraulic cement in all concrete as defined in Section 9-01.2(1). <br /> 51 <br /> CITY OF EVERETT AMENDMENTS <br /> PACIFIC AVENUE TO INTERURBAN TRAIL BICYCLE SAFETY PROJECT 8/12/2019 <br /> STATE FUND#HLP PB17(014); COE#PW3688 Page AM-34 <br />
The URL can be used to link to this page
Your browser does not support the video tag.