Laserfiche WebLink
1 For prestressed concrete piles, the allowable driving stress in kips per square inch shall <br /> 2 be 0.095 •Vic plus prestress in tension, and 0.85f, minus prestress in compression, <br /> 3 where f'c is the concrete compressive strength in kips per square inch. <br /> ' 5 <br /> 5 6-07.AP6 <br /> 6 Section 6-07, Painting <br /> 7 January 7, 2019 <br /> ' 8 6-07.1 Description <br /> 9 The first sentence is revised to read: <br /> ' 10 <br /> 11 This work consists of containment, surface preparation, shielding adjacent areas from <br /> 12 work, testing and disposing of debris, furnishing and applying paint, and cleaning up after <br /> ' 13 painting is completed. <br /> 14 <br /> 15 6-07.2 Materials <br /> ' 16 The material reference for Paint is revised to read: <br /> 17 <br /> 18 Paint and Related Materials 9-08 <br /> 19 <br /> ' 20 6-07.3(1)A Work Force Qualifications for Shop Application of Paint <br /> 21 This section is supplemented with the following new sentence: <br /> 22 <br /> 23 The work force may be accepted based on the approved facility. <br /> 24 <br /> 25 6-07.3(1)B Work Force Qualifications for Field Application of Paint <br /> 26 The first two paragraphs are revised to read: <br /> 27 <br /> 28 The Contractor preparing the surface and applying the paint shall be certified under <br /> 29 SSPC-QP 1 or NACE International Institute Contractor Accreditation Program (NIICAP) <br /> 30 <br /> 31 AS 1. <br /> 32 The Contractor removing and otherwise disturbing existing paint containing lead and other <br /> 33 hazardous materials shall be certified under SSPC-QP 2, Category A or NIICAP AS 2. <br /> 34 <br /> 35 The third paragraph (up until the colon) is revised to read: <br /> 36 <br /> 37 In lieu of the above SSPC or NIICAP certifications, the Contractor performing the specified <br /> 38 work shall complete both of the following actions: <br /> 39 <br /> 40 Item number 2 of the third paragraph is revised to read: <br /> 41 <br /> 42 2. The Contractor's quality control inspector(s) for the project shall be NACE-certified <br /> 43 CIP Level 3 or SSPC Protective Coating Inspector (PCI) Level 3. <br /> 44 <br /> 45 6-07.3(2) Submittals <br /> 46 The first paragraph is supplemented with the following: <br /> 47 <br /> 48 Each component of the plan shall identify the specification section it represents. <br /> 49 <br /> CITY OF EVERETT AMENDMENTS <br /> PACIFIC AVENUE TO INTERURBAN TRAIL BICYCLE SAFETY PROJECT 8/12/2019 <br /> STATE FUND#HLP PB17(014); COE#PW3688 Page AM-43 <br />