My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Kamins Construction Inc Pacific Ave to Interurban Trail Bicycle Safety
>
Contracts
>
JOC
>
Kamins Construction Inc Pacific Ave to Interurban Trail Bicycle Safety
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2019 10:36:28 AM
Creation date
10/21/2019 10:23:58 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Kamins Construction Inc
Approval Date
9/20/2019
Council Approval Date
9/4/2019
Department
Public Works
Department Project Manager
Christina Curtis
Subject / Project Title
Pacific Avenue to Interurban Trail Bicycle
Public Works WO Number
PW3688
Total Compensation
$520,116.00
Contract Type
JOC
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
527
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 6-07.3(2)B Contractor's Quality Control Program Submittal Component <br /> 2 The numbered list in the first paragraph is revised to read: <br /> 3 <br /> 4 1. Description of the inspection procedures, tools, techniques and the acceptance <br /> 5 criteria for all phases of work. <br /> 6 <br /> 7 2. Procedure for implementation of corrective action for non-conformance work. <br /> 8 <br /> 9 3. The paint system manufacturer's recommended methods of preventing defects. <br /> 10 <br /> 11 4. The Contractor's frequency of quality control inspection for each phase of work. <br /> 12 <br /> 13 5. Example of each completed form(s) of the daily quality control report used to <br /> 14 document the inspection work and tests performed by the Contractor's quality control <br /> 15 personnel. <br /> 16 <br /> 17 6-07.3(2)C Paint System Manufacturer and Paint System Information Submittal <br /> 18 Component ' <br /> 19 Item number 1 is revised to read: <br /> 20 <br /> 21 1. Product data sheets and Safety Data Sheets (SDS) on the paint materials, paint <br /> 22 preparation, and paint application, as specified by the paint manufacturer, including: <br /> 23 <br /> 24 a. All application instructions, including the mixing and thinning directions. <br /> 25 <br /> 26 b. Recommended spray nozzles and pressures. <br /> 27 <br /> 28 c. Minimum and maximum drying time between coats. <br /> 29 <br /> 30 d. Restrictions on temperature and humidity. <br /> 31 <br /> 32 e. Repair procedures for shop and field applied coatings. <br /> 33 <br /> 34 f. Maximum dry film thickness for each coat. <br /> 35 <br /> 36 g. Minimum wet film thickness for each coat to achieve the specified minimum dry <br /> �7 film thirknacc <br /> 38 <br /> 39 6-07.3(2)D Hazardous Waste Containment, Collection, Testing, and Disposal <br /> 40 Submittal Component <br /> 41 The first paragraph (up until the colon) is revised to read: <br /> 42 <br /> 43 The hazardous waste containment, collection, testing. and disposal shall meet all Federal <br /> 44 and State requirements, and the submittal component of the painting plan shall include <br /> 45 the following: <br /> 46 <br /> 47 6-07.3(2)E Cleaning and Surface Preparation Submittal Component <br /> 48 Item 1(b) of the first paragraph is revised to read:: <br /> 49 <br /> 50 b. Type, manufacturer, and brand of abrasive blast material and all associated additives, <br /> 51 including Safety Data Sheets (SDS). <br /> 52 <br /> CITY OF EVERETT AMENDMENTS <br /> PACIFIC AVENUE TO INTERURBAN TRAIL BICYCLE SAFETY PROJECT 8/12/2019 <br /> STATE FUND#HLP PB17(014); COE#PW3688 Page AM-44 <br />
The URL can be used to link to this page
Your browser does not support the video tag.