Kamins Construction Inc Pacific Ave to Interurban Trail Bicycle Safety
>
Contracts
>
JOC
>
Kamins Construction Inc Pacific Ave to Interurban Trail Bicycle Safety
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2019 10:36:28 AM
Creation date
10/21/2019 10:23:58 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Kamins Construction Inc
Approval Date
9/20/2019
Council Approval Date
9/4/2019
Department
Public Works
Department Project Manager
Christina Curtis
Subject / Project Title
Pacific Avenue to Interurban Trail Bicycle
Public Works WO Number
PW3688
Total Compensation
$520,116.00
Contract Type
JOC
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
527
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 The minimum drying time between coats shall be as shown in the product data sheets, <br /> 2 but not less than 12 hours. The Contractor shall determine whether the paint has cured <br /> 3 sufficiently for proper application of succeeding coats. <br /> 4 <br /> 5 The maximum time between intermediate and top coats shall be in accordance with the <br /> 6 manufacturer's written recommendations. If the maximum time between coats is <br /> 7 exceeded, all newly coated surfaces shall be prepared to SSPC-SP 7, Brush-off Blast <br /> 8 Cleaning, and shall be repainted with the same paint that was cleaned, at no additional <br /> 9 cost to the Contracting Agency. <br /> 10 <br /> 11 Each coat shall be applied in a uniform layer, completely covering the preceding coat. The <br /> 12 Contractor shall correct runs, sags, skips. or other deficiencies before application of <br /> 13 succeeding coats. Such corrective work may require re-cleaning, application of additional <br /> 14 paint, or other means as determined by the Engineer, at no additional cost to the <br /> 15 Contracting Agency. <br /> 16 <br /> 17 Dry film thickness measurements will be made in accordance with Section 6-07.3(9)D. <br /> 18 <br /> 111 <br /> 19 All paint damage that occurs shall be repaired in accordance with the manufacturer's <br /> 20 written recommendations. On bare areas or areas of insufficient primer thickness, the <br /> 21 repair shall include field-applied zinc-rich primer and the final coats of paint selected from <br /> 22 the approved component or performance based paint system in accordance with Section <br /> 23 6-07.3(10)H. On areas where the primer is at least equal to the minimum required dry film <br /> 24 thickness, the repair shall include the application of the final two coats of the paint system. <br /> 25 All paint repair operations shall be performed by the Contractor at no additional cost or <br /> 26 time to the Contracting Agency. <br /> 27 <br /> 28 6-07.3(10)A Containment <br /> 29 The first sentence of the third paragraph is revised to read: <br /> 30 <br /> 31 Emissions shall be assessed by Visible Emission Observations (Method A) in SSPC <br /> 32 Technology Update No. 7, Conducting Ambient Air, Soil, and Water Sampling of Surface <br /> 33 Preparation and Paint Disturbance Activities, Section 6.2 and shall be limited to the Level <br /> 34 A Acceptance Criteria Option Level 0 Emissions standard. <br /> 35 <br /> 36 6-07.3(10)D Surface Preparation Prior to Overcoat Painting <br /> 37 The first paragraph is revised to read: <br /> 38 <br /> 39 The Contractor shall remove any visible oil, grease, and road tar in accordance with <br /> 40 SSPC-SP 1, Solvent Cleaning. <br /> 41 <br /> 42 The second paragraph is revised to read: <br /> 43 <br /> 44 Following any preparation by SSPC-SP1, all steel surfaces to be painted shall be prepared <br /> 45 in accordance with SSPC-SP 7, Brush-off Blast Cleaning. Surfaces inaccessible to brush- <br /> 46 off blast shall be prepared in accordance with SSPC-SP 3, Power Tool Cleaning, as <br /> 47 allowed by the Engineer. <br /> 48 <br /> 49 The first sentence of the third paragraph is revised to read: <br /> 50 <br /> 51 Following brush-off blast cleaning, the Contractor shall perform spot abrasive blast <br /> 52 cleaning in accordance with SSPC-SP 6, Commercial Blast Cleaning. <br /> CITY OF EVERETT AMENDMENTS <br /> PACIFIC AVENUE TO INTERURBAN TRAIL BICYCLE SAFETY PROJECT 8/12/2019 <br /> STATE FUND#HLP PB17(014);COE#PW3688 Page AM-50 <br />