Laserfiche WebLink
I <br /> 1 The finishing machine shall meet the requirements of Section 6-02.3(10) and the following <br /> 2 requirements: <br /> 3 <br /> 4 The finishing machine shall be equipped with augers, followed by an oscillating, <br /> 5 vibrating screed, vibrating roller tamper, or a vibrating pan, followed by a rotating <br /> 6 cylindrical double drum screed. The vibrating screed, roller tamper or pan shall be of <br /> 7 sufficient length and width to properly consolidate the mixture. The vibrating <br /> 8 frequency of the vibrating screed, roller tamper or pan shall be variable with positive <br /> 9 control. <br /> 10 <br /> 11 6-09.3(2) Submittals <br /> 12 Item number 1 and 2 are revised to read: <br /> 13 <br /> 14 1. AType 1 Working Drawing consisting of catalog cuts and operating parameters of the <br /> 15 hydro-demolition machine selected by the Contractor for use in this project to scarify <br /> 16 concrete surfaces. <br /> 17 <br /> 18 2. A Type 1 Working Drawing consisting of catalog cuts, operating parameters, axle <br /> 19 loads, and axle spacing of the rotary milling machine (if used to remove an upper <br /> 20 layer of existing concrete overlay when present). <br /> 21 <br /> 22 The first sentence of item number 3 is revised to read: <br /> 23 <br /> 24 A Type 2 Working Drawing of the Runoff Water Disposal Plan. <br /> 25 <br /> 26 6-09.3(5)A General <br /> 27 The first sentence of the fourth paragraph is revised to read: <br /> 28111 29 All areas of the deck that are inaccessible to the selected scarifying machine shall be <br /> 30 scarified to remove the concrete surface matrix to a maximum nominal scarification depth <br /> 31 shown in the Plans by a method acceptable to the Engineer. <br /> 32 <br /> 33 This section is supplemented with the following: <br /> 34 <br /> 35 Concrete process water generated by scarifying concrete surface and removing existing <br /> 36 concrete overlay operations shall be contained, collected, and disposed of in accordance <br /> 37 with Section 5-01.3(11) and Section 6-09.3(5)C, and the Section 6-09.3(2) Runoff Water <br /> 38 Disposal Plan. <br /> 39 <br /> 40 6-09.3(5)B Testing of Hydro-Demolition and Shot Blasting Machines <br /> 41 This section's title is revised to read: <br /> 42 <br /> 43 Testing of Hydro-Demolition Machines <br /> 44 <br /> 45 The second paragraph is revised to read: <br /> 46 <br /> 47 In the "sound" area of concrete, the equipment shall be programmed to remove concrete <br /> 48 to the nominal scarification depth shown in the Plans with a single pass of the machine. <br /> 49 <br /> 50 6-09.3(5)D Shot Blasting <br /> 51 This section, including title, is revised to read: <br /> 52 <br /> CITY OF EVERETT AMENDMENTS <br /> PACIFIC AVENUE TO INTERURBAN TRAIL BICYCLE SAFETY PROJECT 8/12/2019 <br /> STATE FUND#HLP PB17(014); COE#PW3688 Page AM-60 <br />