My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Snyder Roofing of Washington LLC South Precinct Roof Replacement
>
Contracts
>
Capital Contract
>
Snyder Roofing of Washington LLC South Precinct Roof Replacement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2019 11:51:54 AM
Creation date
10/21/2019 11:45:05 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Snyder Roofing of Washington LLC
Approval Date
9/30/2019
Council Approval Date
8/21/2019
Department
Facilities
Department Project Manager
Chris Lark
Subject / Project Title
South Precinct Roof Replacement
Total Compensation
$408,660.23
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
282
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> City of Everett 01 1100 - 3 <br /> ' South Precinct Roof Replacement <br /> B. All construction shall be in accordance with the Uniform Mechanical Code, and the <br /> Uniform Plumbing Code, latest editions. <br /> C. All construction shall be in conformance with the WSDOT/APWA Standard <br /> Specifications and Standard Plans, latest edition. <br /> jD. All construction shall be in conformance with the City of Everett Design and Construction <br /> Standards and Specifications, latest edition. <br /> E. All work shall comply with applicable requirements of Snohomish County. <br /> F. Any material specified by reference to the number, symbol, or title of a specified <br /> standards, such as Commercial Standard Federal Specifications, a trade association <br /> standard, or other similar standard, shall comply with the requirements of the latest <br /> revision thereof, and any amendment or supplement thereto in effect on the date of <br /> Invitation for Bids, except as limited to type, class or grade, or modified in such <br /> references. All work shall conform to the standard referred to, except as modified in <br /> these specifications and the drawings. <br /> 1 <br /> 1.7 CONTRACTOR'S USE OF PREMISES <br /> A. The Contractor shall assume full responsibility for protection and safekeeping of products <br /> under this Contract. <br /> B. The Contractor shall obtain and pay for use of additional storage for work areas needed <br /> for operations. <br /> 1.8 CHECKING PLANS AND SPECIFICATIONS <br /> A. PRIOR SUBMISSION OF BIDS: The Contractor shall report any discrepancies or <br /> omissions in the plans and/or specifications to the Architect for a decision prior to the <br /> Submission of Bids. <br /> B. RESOLUTION OF CONFLICTS: Where there is conflict between the plans and the <br /> specifications in regard to materials, equipment, sizes, numbers or locations, the Owner <br /> shall be the sole judge in resolving the conflict. <br /> PART 2 - PRODUCTS (Not Used) <br /> I <br /> PART 3 - EXECUTION (Not Used) <br /> END OF SECTION 01 1100 <br /> 1 <br /> i <br /> 01 1100 - 3 SUMMARY OF WORK <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.