Laserfiche WebLink
City of Everett <br /> 01 1100 - 2 <br /> South Precinct Roof Replacement <br /> F. ADDITIONS TO, OR DEDUCTIONS FROM, THE CONTRACT: The authorization of all <br /> Additions to, or Deductions from, labor and materials, as called for in the Contract, shall <br /> be given only upon the Owner's printed form bearing the signatures of the Owner, the <br /> Contractor, and the Architect/Engineer. The form shall list the Work and materials <br /> involved, and shall state the amount to be added to, or deducted from, the Contract Price, <br /> giving the cost of labor and materials, and the percentage added for Overhead and Profit. <br /> This form shall be completed prior to starting the Work involved. <br /> 1.2 CHANGES IN THE WORK <br /> A. OVERHEAD AND PROFIT: Change orders will be calculated based on the provisions <br /> in Section 00710. No additional Overhead and Profit shall be applied to Deductive <br /> Change Orders. <br /> B. COSTS SHALL BE LIMITED TO: Cost of materials, cost of delivery, cost of labor, <br /> including Social Security, Old Age and Unemployment Insurance, fringe benefits under <br /> collective bargaining agreements, and Workmen's Compensation Insurance; bond <br /> premiums; and rental value of power tools and equipment, supervision; superintendence; <br /> wages of timekeepers, watchmen and clerks; and the cost of hand tools. <br /> 1.3 WORK BY OTHERS I <br /> A. OTHER CONTRACTS: The Owner shall have the right to let other Contracts in <br /> connection with the Work, and the Contractor shall cooperate with any such Contractors. I <br /> B. "N.I.C." Items indicated "NIC" shall be furnished and installed by the Owner, or by other <br /> Contracts. 1 <br /> 1.4 WORK BY THE OWNER <br /> A. The Owner shall have the right to access the site and execute work not included in the <br /> Contract concurrent with this contract period. Contractor shall cooperate with such <br /> Owner sponsored efforts. I <br /> 1.5 PERMITS I <br /> A. The Owner will pay the cost of the general plan review and building permit. The <br /> Contractor shall be responsible to obtain and pay the cost of various other permits and <br /> connection fees required such as mechanical, plumbing and electrical permits or <br /> connection fees and such shall be included in the Bid. <br /> 1.6 <br /> CODES AND STANDARD SPECIFICATIONS <br /> A. All construction shall be in accordance with the International Building Code, Current <br /> Adopted Edition. 111 <br /> 01 1 100 - 2 SUMMARY OF WORK <br /> I <br />