Laserfiche WebLink
I <br /> City of Everett 01 60 00 - 3 <br /> South Precinct Roof Replacement <br /> PART 2 - PRODUCTS <br /> I <br /> 2.1 PRODUCT OPTIONS <br /> A. General Product Requirements: Provide products that comply with the Contract <br /> Documents, that are undamaged, and unless otherwise indicated, that are new at time <br /> of installation. <br /> 1. Provide products complete with accessories, trim, finish, fasteners, and other <br /> items needed for a complete installation and indicated use and effect. <br /> 2. Standard Products: If available, and unless custom products or nonstandard <br /> options are specified, provide standard products of types that have been <br /> produced and used successfully in similar situations on other projects. <br /> 3. Owner reserves the right to limit selection to products with warranties not in <br /> conflict with requirements of the Contract Documents. <br /> 4. Where products are accompanied by the term "as selected," Architect will make <br /> selection. <br /> 5. Where products are accompanied by the term "match sample," sample to be <br /> matched is Architect's. <br /> 6. Or Equal: Where products are specified by name and accompanied by the term <br /> "or equal" or"or approved equal" or "or approved," comply with provisions in <br /> "Comparable Products" Article to obtain approval for use of an unnamed product. <br /> ' B. Product Selection Procedures: Procedures for product selection include the following: <br /> 1. Product: Where Specification paragraphs or subparagraphs titled "Product" <br /> 1 name a single product and manufacturer, provide the product named. <br /> a. Substitutions may be considered. <br /> 2. Manufacturer/Source: Where Specification paragraphs or subparagraphs titled <br /> "Manufacturer" or "Source" name single manufacturers or sources, provide a <br /> product by the manufacturer or from the source named that complies with <br /> requirements. <br /> a. Substitutions may be considered. <br /> 111 <br /> 2.2 PRODUCT SUBSTITUTIONS <br /> A. Conditions: Architect will consider Contractor's request for substitution only after <br /> bidding has occurred and the General Contractor is selected. If the following <br /> conditions are not satisfied, Architect will return requests without action, except to <br /> record noncompliance with these requirements: <br /> I1. Requested substitution offers Owner a substantial advantage in cost, time, <br /> energy conservation, or other considerations, after deducting additional <br /> responsibilities Owner must assume. Owner's additional responsibilities may <br /> include compensation to Architect for redesign and evaluation services, <br /> increased cost of other construction by Owner, and similar considerations. <br /> 01 60 00 - 3 PRODUCTS <br />