My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Snyder Roofing of Washington LLC South Precinct Roof Replacement
>
Contracts
>
Capital Contract
>
Snyder Roofing of Washington LLC South Precinct Roof Replacement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2019 11:51:54 AM
Creation date
10/21/2019 11:45:05 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Snyder Roofing of Washington LLC
Approval Date
9/30/2019
Council Approval Date
8/21/2019
Department
Facilities
Department Project Manager
Chris Lark
Subject / Project Title
South Precinct Roof Replacement
Total Compensation
$408,660.23
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
282
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> City of Everett 01 60 00 - 4 <br /> South Precinct Roof Replacement <br /> 2. Requested substitution does not require extensive revisions to the Contract <br /> Documents. <br /> 3. Requested substitution is consistent with the Contract Documents and will <br /> produce indicated results. <br /> 4. Substitution request is fully documented and properly submitted. <br /> 5. Requested substitution will not adversely affect Contractor's Construction <br /> Schedule. <br /> 6. Requested substitution has received necessary approvals of authorities having <br /> jurisdiction. <br /> 7. Requested substitution is compatible with other portions of the Work. <br /> 8. Requested substitution has been coordinated with other portions of the Work. <br /> 9. Requested substitution provides specified warranty. <br /> 10. If requested substitution involves more than one contractor, requested <br /> substitution has been coordinated with other portions of the Work, is uniform and <br /> consistent, is compatible with other products, and is acceptable to all contractors <br /> involved. <br /> 2.3 COMPARABLE PRODUCTS I <br /> A. Where products or manufacturers are specified by name, submit the following, in <br /> addition to other required submittals, to obtain approval of an unnamed product: <br /> 1. Evidence that the proposed product does not require extensive revisions to the <br /> Contract Documents, that it is consistent with the Contract Documents and will , <br /> produce the indicated results, and that it is compatible with other portions of the <br /> Work. <br /> 2. Detailed comparison of significant qualities of proposed product with those <br /> named in the Specifications. Significant qualities include attributes such as <br /> performance, weight, size, durability, visual effect, and specific features and <br /> requirements indicated. <br /> 3. Evidence that proposed product provides specified warranty. <br /> 4. List of similar installations for completed projects with project names and <br /> addresses and names and addresses of architects and owners, if requested. <br /> 5. Samples, if requested. <br /> PART 3 - EXECUTION (Not Used) I <br /> END OF SECTION 01 60 00 <br /> I <br /> I <br /> 01 60 00 - 4 PRODUCTS <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.