Laserfiche WebLink
City of Everett 00 25 13 - 2 <br /> South Precinct Roof Replacement <br /> 111 <br /> A. All addenda released are required to be signed and attached to the bid proposal. <br /> B. Bids proposals with addenda that are not signed shall be considered non-responsive and <br /> the bid will be rejected. <br /> C. Questions received during the walk thru shall be noted and answered as addenda. <br /> D. All other questions or interpretations must be in writing and received by the city no later <br /> than 7 calendar days prior to the bid opening date. <br /> PART 2 - PRODUCTS (Not Used) <br /> I <br /> PART 3 - EXECUTION (Not Used) <br /> I <br /> END OF SECTION 00 25 13 <br /> I <br /> I <br /> 1 <br /> I <br /> I <br /> I <br /> I <br /> 1 <br /> 1 <br /> I <br /> i <br /> 00 25 13 - 2 PRE-BID MEETING <br /> I <br />