My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Professional Services Agreement Otak Inc
>
Contracts
>
6 Years Then Destroy
>
2023
>
Professional Services Agreement Otak Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/22/2019 11:12:33 AM
Creation date
10/22/2019 11:11:57 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Otak Inc
Approval Date
10/18/2019
Council Approval Date
10/2/2019
End Date
12/31/2023
Department
Public Works
Department Project Manager
Erik Emerson
Subject / Project Title
On Call Stormwater Review Support
Public Works WO Number
UT9719-7- 2
Total Compensation
$250,000.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A <br /> Everett Stormwater Plan Review Support <br /> Scope of Work <br /> Otak Project 33174 <br /> Stormwater Plan Review Support <br /> The Scope of Work for the Stormwater Plan Review Support services may include, but is not necessarily <br /> limited to, the following tasks: <br /> Project Management and Contract Administration <br /> The Consultant shall organize, manage and coordinate the disciplines required to accomplish the contract <br /> and shall perform multiple work orders concurrently. The Consultant shall coordinate its work with efforts <br /> performed by City staff and other consultants or contractors. The Consultant shall provide project <br /> management and contract administration services to facilitate efficient progress on each work order, <br /> including: <br /> • Project team management and coordination, including managing sub-consultants; <br /> • Meeting organization, facilitation and documentation <br /> • Manage, monitor and prepare progress reports, schedules, scope and scope changes, of all work <br /> performed under this contract <br /> Review of Development Applications <br /> Perform plan review for development applications in the City of Everett including, but not limited to, <br /> preliminary subdivisions, SEPA, shoreline applications, and public works permits. The consultant will focus <br /> primarily on the stormwater elements, while other City review staff will be responsible for review of non- <br /> stormwater elements of the applications such as grading, erosion control, transportation, water, and <br /> sewer. <br /> Each development project with permit applications that is sent to the Consultant for review will be tracked <br /> separately but a separate scope and fee estimate will not be prepared prior to performing the work unless <br /> requested by the City. Each month a single invoice will be submitted for payment which includes a <br /> summary of costs incurred for each project reviewed and overall project monthly charges. <br /> The Consultant shall provide a variety of development review services, which may include, but not be <br /> limited to the following: <br /> • Review construction plans and supporting documents submitted to the City of Everett in <br /> conjunction with development applications for compliance with the City of Everett standards, codes, <br /> and specific requirements for development applications. Examples of the City of Everett standards <br /> and codes include Everett Municipal Code, City of Everett Design and Construction Standards & <br /> Specs, Standard Drawings, and current Ecology Stormwater Management Manual for Western <br /> Washington, and ordinances. <br /> • Provide geotechnical and hydrogeologic review of development plans and reports. <br /> City of Everett —Stormwater Plan Review Support 1 <br /> otak <br />
The URL can be used to link to this page
Your browser does not support the video tag.