7.1:-.1:1 -,:7-2.17:7 _ <br /> ABOSSEIN <br /> ENGINEERING <br /> L.L.0 <br /> 3.33 VALVES: NIBCO BALL VALVES OR EQUAL. <br /> HVAC SPECIFICATIONS - DIVISION #23 3.08 ALL WORK SHALL BE DONE IN A FIRST-CLASS MANNER BY WORKMEN SKILLED IN THE TRADE AFFECTED. 3.34 AIR CONDITIONING UNITS: <br /> 3.09 CLEANING PIPING, DUCTS, EQUIPMENT: THOROUGHLY CLEAN ALL DUCTS AND EQUIPMENT OF DIRT, CUTTINGS, PER EQUIPMENT SCHEDULE WITH CAPACITY AS INDICATED. UNIT SHALL BE AN AIR-COOLED CONDENSING UNIT, MECHANICAL-ELECTRICAL <br /> PART 1.00 GENERAL AND OTHER FOREIGN SUBSTANCES. REMOVE FROM PREMISES ALL RUBBISH AND DEBRIS, LEAVING THE AREA AIR HANDLING UNIT WITH DX-COILS OR HEAT PUMPS OR GAS FURNACE OR HOT WATER COILS, FILTER MIXIMG CIVIL-LEED-STRUCTURAL <br /> CLEAN AND READY FOR USE. BOX AND VIBRATION ISOLATORS. TOTAL CAPACITY OF EACH UNIT SHALL BE AS SCHEDULED ON THE DRAWINGS. FIRE PROTECTION <br /> 1.01 LOCAL CONDITIONS: VISIT AND INSPECT THE PREMISES TO ASCERTAIN THE EXISTING CONDITIONS BEFORE 3.35 CONTROLS - THE COOLING SYSTEM SHALL BE PROTECTED WITH HIGH PRESSURE STAT, LOW PRESSURE STATS, <br /> WILL BE ALLOWED FOR THE LACK OF KNOWLEDGE OF THESE - UST ALL OR OTHER DRIVES AND CHECK MOTOR ROTATIONS. BELL 112TH AVE. NE <br /> SUBMITTING A BID. NO EXTRA PAYMENT L 3.10 EQUIPMENT START UP: ADJLOSS-OF-CHARGE PROTECTION, INDOOR COIL FREEZESTATS, CURRENT AND TEMPERATURE SENSITIVE OVERLOAD BELLEVUE, WA 98004 <br /> CONDITIONS. BELTS, DEVICES. <br /> 3.11 INSTALL TEMPORARY AIR FILTERS IN AIR HANDLING EQUIPMENT THAT IS BEING USED FOR HEATING OR 3.36 PROVIDE PRODUCTS OF COMBUSTION DETECTOR IN SUPPLY AND RETURN AIR IN ALL UNITS 2000 CFM OR OVER OFFICE: (425) 462-9441 <br /> 1.02 CODES: STRICTLY COMPLY WITH ALL APPLICABLE LOCAL, STATE, AND FEDERAL CODES AND REGULATIONS. VENTILATION DURING CONSTRUCTION. INSTALL A NEW SET OF THE SPECIFIED AIR FILTERS FOR THE FAX: (425) 462-9451 <br /> TO SHUT DOWN UNIT ON ALARM CONDITION. <br /> IMC - MECHANICAL CODE EQUIPMENT AT THE COMPLETION OF THE JOB. 3.37 EXHAUST FANS: FANS SHALL MEET CAPACITIES SCHEDULED AND NOT EXCEED SOUND LIMITATIONS SPECIFIED. EMAIL: <br /> CService� AIL: in.com <br /> IPC - PLUMBIGA CODE 3.12 COMPLETION: OPERATE ALL MECHANICAL SYSTEMS, INCLUDING ALL EQUIPMENT FURNISHED UNDER THIS <br /> 3.38 GRILLES & REGISTERS: SCHEDULED ON DRAWINGS. TITUS OR M <br /> IFGC - FUEL GAS CODE . <br /> DIVISION FOR A PERIOD OF TIME NOT TO EXCEED 5 DAYS OR AS MAY BE REQUIRED AT THE DIRECTION ON WEBSITE: <br /> FORM A PART OF THESE REQUIREMENTS TO THE ARCHITECT/ENGINEER TO PROVE THAT ALL COMPONENTS ARE PROPERLY OPERATING AND THAT THE 3.39 DUCT LINING: 1/2" THICKNESS, 3 PCF DENSITY, NEOPRENE COATED DUCT LINER MEETING FIRE HAZARD www.abossein.com <br /> 1.03 STANDARDS: THE FOLLOWING PUBLICATIONS (LATEST EDITION) RATING REQUIREMENTS FOR INSULATION. INSTALL WITHIN MINIMUM 10' DUCT LENGTH FROM FANS. <br /> THE EXTENT INDICATED BY THE REFERENCES THERETO: COMPLETE INSTALLATION IS FUNCTIONING SMOOTHLY AND NOISELESSLY TO THE FULL EXTENT OF PLANS AND <br /> SPECIFICATIONS, ANY REBALANCING, READJUSTING OF SYSTEM ELEMENTS FOUND NECESSARY WHEN THE 3.40 DUCTWORK: SHEET METAL DUCTWORK SHALL BE CONSTRUCTED OF GALVANIZED STEEL. DUCTS SHALL CONFORM <br /> SHEET METAL AND AIR CONDITIONING CONTRACTOR NATIONAL ASSOCIATION (SMACNA) SYSTEMS ARE SUBJECT TO ACTUAL OPERATING CONDI TIONS SHALL BE DONE BY THE CONTRACTOR AT NO EXTRA ACCURATELY TO THE DIMENSIONS INDICATED AND SHALL BE STRAIGHT AND SMOOTH ON THE INSIDE WITH <br /> LOW VELOCITY DUCT MANUAL <br /> COST TO THE OWNER. JOINTS NEATLY FINISHED. DUCT CONSTRUCTION SHALL BE IN ACCORDANCE WITH SMACNA LOW PRESSURE DUCT <br /> MANUAL, 2" WG FOR SUPPLY & 1" WG FOR EXHAUST DUCTS. ELBOWS, FITTINGS AND BRANCH TAKE-OFFS <br /> 3.13 OPERATING INSTRUCTIONS: SUBMIT 30 DAYS PRIOR TO COMPLETION OF THE PROJECT, FOUR (4) SETS OF SHALL BE DESIGNED, CONSTRUCTED AND INSTALLED AS RECOMMENDED IN SMACNA "DUCT CONSTRUCTION _• <br /> SPECIFICATIONS: THE MECHANICAL DRAWINGS ARE DIAGRAMMATIC IN CHARACTER INTENDED TO INSTRUCTIONS, MAINTENANCE STANDARDS" WITH THE USE OF TURNING VANES OR RADIUS ELBOWS. FLEXIBLE RUNOUTS FROM BRANCHES, <br /> PLANS ANDSHALL INCLUDE OPERATING , <br /> 1.04 (�. <br /> COVEY THE SCOPE OF WORK AND INDICATE THE GENERAL ARRANGEMENT OF EQUIPMENT, DUCTS, PIPING, ETC., OPERATING BROCHURES. EACH BROCHURE <br /> INSTRUCTIONS, INSTALLATION INSTRUCTIONS, PARTS LISTS AND WIRING DIAGRAMS FOR EACH ITEM OF RISERS OR MAINS TO AIR TERMINAL UNITS, AND OUTLETS SHALL BE FACTORY-FABRICATED, CLASS I, VAPOR `� r , <br /> AND APPROXIMATE SIZES AND LOCATIONS OF EQUIPMENT AND OUTLETS. DETERMINE THE EXACT LOCATION OF WITH MIXING OR MOVABLE PARTS. THE BROCHURE SHALL ALSO INCLUDE BARRIER INSULATED FLEXIBLE CONNECTORS COMPLYING WITH NFPA STANDARD NO. 90A AND UL 181. FLEXIBLE ob../ g �; ..� <br /> THE ELEMENTS OF THE SYSTEM FROM THE STRUCTURE AND FROM THE EQUIPMENT, NOT FROM THE DRAWINGS. MECHANICAL EQUIPMENT <br /> DRAWINGS FOR MEASUREMENTS NOR USE AS SHOP DRAWINGS. OPERATIONAL AND DIAGRAMS OF TEMPERATURE CONTROL SYSTEMS. CONNECTORS SHALL NOT EXCEED 10' IN LENGTH. PRESSURE RATING SHALL BE 4" W.G. FLEXIBLE DUCT <br /> DO NOT SCALE <br /> CONNECTIONS TO EQUIPMENT AND OTHER DUCTS SHALL BE MADE WITH DRAW BANDS. PROVIDE DAMPER IN RUN 4\ :, <br /> OUT TO AIR OUTLETS. w� *�� /� <br /> EQUIPMENT, MATERIALS, OPERATIONS, OR METHODS LISTED, MENTIONED OR SCHEDULED 3.14 PROVIDE TYPEWRITTEN OPERATING INSTRUCTIONS IN THE BROCHURE COVERING EACH PIECE OF MOTORIZED � `�/` <br /> 1.05 PROVIDE ALL ITEMS, Q , <br /> AND ACCESSORIES NECESSARY AND REQUIRED MECHANICAL EQUIPMENT, GIVE NORMAL STARTING AND STOPPING PROCEDURES, ALONG WITH PROPER PARTIES ��• �, <br /> ON THE DRAWINGS, AND/OR HEREIN INCLUDING ALL INCIDENTALS 3.41 HINGED DUCT ACCESS DOORS SHALL BE PROVIDED AT ALL AUTOMATIC DAMPERS, FIRE DAMPERS, AND OTHER �, ��� <br /> FOR INSTALLATION OR MOUNTING, OR NORMALLY SUPPLIED BY COMMON PRACTICE WHETHER SPECIFICALLY TO CONTACT IN THE EVENT OF EMERGENCY, FAILURE OF CONTROLS OR EQUIPMENT. OUTLINE OF APPARATUS REQUIRING SERVICE AND INSPECTION IN THE DUCT SYSTEM. DOORS SHALL SE 15 X 18 INCHES <br /> MENTIONED OR NOT, TO PROVIDE COMPLETE AND PROPERLY FUNCTIONING SYSTEMS. INSTRUCTIONS AS FOLLOWS: UNLESS OTHERWISE INDICATED. WHERE SIZE OF DUCT WILL NOT ACCOMMODATE THIS SIZE, THE DOOR SHALL <br /> _ D E UIPMENT. BE MADE AS LARGE AS PRACTICAL. DOORS SHALL BE PROVIDED WITH AIRTIGHT GASKETS, GALVANIZED <br /> 1.06 BRING ANY NON-COMPLIANCES WITH ALL APPLICABLE LOCAL, STATE AND FEDERAL CODES AND REGULATIONS, NORMAL STARTING, STOPPING AND EMERGENCY SHUT DOWN OF EACH PIECE OF MOTORIZE Q HINGES AND APPROVED BRASS FASTENERS. DOORS IN INSULATED DUCTS SHALL BE OF THE INSULATED TYPE. <br /> CONFLICTS AND DISCREPANCIES TO THE ENGINEER'S ATTENTION BEFORE SUBMITTING BID. A CORRECT, DOORS SHALL SO SWING THAT FAN PRESSURE OR SUCTION HOLD DOOR CLOSED. <br /> COMPLETE AND EASILY MAINTAINED SYSTEM IS INTENDED. PROVIDE LUBRICATION INSTRUCTIONS FOR EACH MOTOR BEARING OR OPERABLE PIECE OF EQUIPMENT. <br /> GIVE FREQUENCY OF LUBRICATION, TYPE AND BRAND OF OIL OR GREASE. 3.42 PROVIDE NON-COMBUSTIBLE APPARATUS FLEXIBLE CONNECTIONS OF NOT LESS THAN 15 OUNCE WOVEN FABRIC <br /> 1.07 THE CONTRACTOR'S BID WILL BE CONSTRUED TRUED AS AN AGREEMENT TO COMPLETE THE WORK WITHOUT ADDITIONAL APPROVED MATERIAL WHERE SHEET METAL DUCTS ARE CONNECTED TO FANS OR OTHER MOVING EQUIPMENT. <br /> COST TO THE OWNER. WHERE CONFLICTS BETWEEN PLANS AND SPECIFICATIONS OR CONFLICTING INFORMATIONINCLUDE CALIBRATION, CLEANING AND ADJUSTMENT SCHEDULES AND PROCEDURES. THE FLEXIBLE CONNECTIONS SHALL BE SECURELY FASTENED. <br /> TOTHE ARCHITECT PRIOR TO BIDDING. THE Z 1.4 <br /> ON THE PLANS OCCURS, THE CONFLICTS SHALL BE REPORTED 3.43 DUCT LINER INSULATION: INSULATE INTERIOR SURFACES OF ALL SUPPLY DUCTS FROM AIR <br /> MORE COSTLY ALTERNATIVE SHALL BE INCLUDED IN THE BID PRICE. INCLUDE COPIES OF MANUFACTURER'S LITERATURE ON MAINTENANCE AND OPERATION OF EACH PIECE OF CONDITIONING UNIT SUPPLY FANS TO AIR OUTLETS AND INDICATED RETURN OR EXHAUST DUCTS WITH <br /> EQUIPMENT, INCLUDING INSTALLATION INSTRUCTIONS, DIAGRAMS, AND PARTS LISTS, IN EACHACOUSTICAL MATERIAL. P4 W <br /> 1.08 MAKE NO CHANGES IN THE WORK SPECIFIED, UNLESS SUCH CHANGES ARE AUTHORIZED IN WRITING BY THE BROCHURE. 4 <br /> ENGINEER. NO CHARGES FOR EXTRA WORK WILL BE PAID UNLESS SUCH EXTRA <br /> OWNER, ARCHITECT AND/OR 3.44 APPLY AND SECURE INSULATION AS RECOMMENDED BY MANUFACTURER AND AS APPROVED. ANY LOOSENING OF O4 <br /> WORK HAS BEEN AUTHORIZED AND THE AUTHORIZATION CONTAINS A STATEMENT OF THE WORK TO BE 315 AS-BUILT DRAWINGS: SUBMIT AS-BUILT DRAWINGS AT COMPLETION OF WORK. INSULATION LINER WILL REQUIRE REMOVAL AND REINSTALLATION OF ALL DUCT WORK, AT NO EXTRA COST. Q <br /> ACCOMPLISHED AND THE CHARGES TO BE MADE FOR THE WORK. <br /> 3.16 GUARANTEE: THE MECHANICAL SYSTEM SHALL BE LEFT IN PROPER WORKING ORDER. REPLACE ANY WORK, 3.45 INCREASE INDICATED DUCT SIZES TO COMPENSATE FOR THICKNESS OF DUCT LINER INSULATION. W <br /> 1-4 <br /> 1.09 IT IS THE INTENT OF THESE SPECIFICATIONS TO PROVIDE A MECHANICAL SYSTEM COMPLETE, FULLY MATERIAL OR EQUIPMENT PROVIDED UNDER THIS CONTRACT WHICH DEVELOPS DEFECTS WITHIN ONE (1) YEAR SEALING: ALL TRANSVERSETEDCJOINTS ON THE LOW PRESSUREC SYSTEM SHALL LI SEALEDNS WITH "HARDCAST" DUCT <br /> ADJUSTED, AND READY TO USE. FROM DATE OF SUBSTANTIAL COMPLETION WITHOUT ADDITIONAL CHARGES. A NEW ONE (1) YEAR GUARANTEE <br /> ON THE AFFECTED ITEM OR ITEMS SHALL BE PROVIDED COMMENCING ON THE DATE OF THE APPROVED REPAIR TAPE SYSTEM APPLIED IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS OR OTHER APPROVED SYSTEM. w <br /> 1.10 IT IS THE INTENTION OF THESE SPECIFICATIONS AND DRAWINGS TO CALL FOR FINISHED WORK, TESTED, OR REPLACEMENT. 3.46 IN LIEU OF RECTANGULAR LINED DUCT, RECTANGULAR DUCT INSULATED WITH 1" VAPOR BARRIER DUCT WRAP 1-4 A <br /> AND READY FOROPERATION. WHEREVER THE WORK "PROVIDE" IS USED, IT SHALL MEAN "FURNISH OR ROUND DUCT OF EQUIVALENT CROSS SECTIONAL AREA AND INSULATED WITH 1" VAPOR BARRIER a. w <br /> AND INSTALL COMPLETE AND READY TO USE." 3.17 MECHANICAL EQUIPMENT WIRING AND CONNECTIONS: INSULATION, MAY BE USED. ALL SUPPLY DUCTS SHALL BE LINED OR EXTERNALLY INSULATED. O4 I <br /> MAND <br /> DETAILS NOT USUALLY SHOWN ORIN H SPECIFIED,WORK,, BUTE NECESSARYAASIFOR THE PROPER INSTALLATION FURNISHED INSTALLED BY WIRED AND/OR 3.47 GREASE DUCT FROM RANGE HOODS WHERE APPLICABLE TO EXHAUST FAN - 16 GAUGE BLACK IRON - WITH 0n <br /> AND OPERATION, SHALL BE INCLUDED IN THE THE SAME AS IF HEREIN SPECIFIED OR SHOWN. ITEM BY OR MOUNTED BY CONNECTED BY WELDED SEAMS AND JOINTS. WRAP DUCT WITH 2 LAYERS OF THERMAL CERAMICS FIREMASTER DUCT WRAP 0-4 <br /> APPLIED AS RECOMMENDED BY THE MFR. TO MAKE A 2 HOUR RATED INSTALLATION. WRAP TO EXTEND FROM HOOD <br /> 1.11 THE CONTRACTOR SHALL GIVE ALL NECESSARY NOTICES, OBTAIN ALL PERMITS AND PAY ALLEQUIPMENT MOTORS MC MC EC TO EXHAUST FAN. E-4 < <br /> GOVERNMENT SALES TAXES, FEES AND OTHER COSTS, INCLUDING UTILITY CONNECTIONS OR 3.48 DESCRIPTION: PERFORM TESTING AND BALANCING IN ACCORDANCE WITH THE PROCEDURE OF THE ASSOCIATED <br /> EXTENSIONS, IN CONNECTION WITH HIS WORK; FILE ALL NECESSARY PLANS, PREPARE ALL DOCUMENTS MOTOR CONTROLLERS, PUSHBUTTON AIR BALANCE COUNCIL'S "NATIONAL STANDARDS FOR FIELD MEASUREMENTS AND INSTRUMENTATION TOTAL A <br /> SYSTEM BALANCE." <br /> HAVING STATIONS, PILOT LIGHTS, ETC. MC EC EC <br /> AND OBTAIN ALL NECESSARY APPROVALS OF ALL GOVERNMENTAL DEPARTMENTS <br /> JURISDICTION; OBTAIN ALL REQUIRED CERTIFICATES OF INSPECTION OF HIS WORK AND DELIVER SAME = Z <br /> TO THE ARCHITECT BEFORE REQUEST FOR ACCEPTANCE AND FINAL PAYMENT FOR WORK. MULTI-SPEED SWITCHES 3.49 USE ACCURATE INSTRUMENTS FOR BALANCING AIR SYSTEMS THAT HAVE BEEN CALIBRATED WITHIN 6 MONTHS <br /> LINE VOLTAGE THERMOSTATS MC EC EC PRIOR TO BALANCING. TYPES, SERIAL NUMBERS, AND DATE OF CALIBRATION OF ALL INSTRUMENTS SHALL BE <br /> 1.12 THE CONTRACTOR SHALL INCLUDE IN THE WORK, WITHOUT EXTRA COST TO THE OWNER, ANY LABOR, LISTED IN THE FINAL AIR BALANCE REPORTS. <br /> iiit E-4 <br /> MATERIALS, SERVICES, APPARATUS, DRAWINGS, <br /> IN ORDER TO COMPLY WITH ALL APPLICABLE LAWS, DISCONNECT SWITCHES, (FUSED 0-4Z <br /> ORDINANCES, RULES AND REGULATIONS, WHETHER OR NOT SHOWN ON DRAWINGS AND/OR SPECIFIED. OR UNFUSED), HP RATED SWITCHES, 3.50 MAKE AIR QUANTITY MEASUREMENTS IN MAIN AND BRANCH DUCTS BY PITOT TUBE TRAVERSE OF THE ENTIRE <br /> THERMAL OVERLOAD SWITCHES, ETC. MC EC EC CROSS SECTIONAL AREA OF THE DUCT. DUCTS HAVING VELOCITIES OF 1000 OR MORE FEET PER MINUTE ► Z <br /> SHALL BE MEASURED WITH INCLINED MANOMETERS (DRAFT GAUGE) OR MAGNEHELIC GAUGES. DUCTS HAVING <br /> PART 2.00 PRODUCTS LOW VOLTAGE THERMOSTATS, VELOCITIES OF LESS THAN 1000 FT. PER MINUTE SHALL BE MEASURED WITH MICROMANOMETERS, HOOD GAUGES <br /> 2.01 MATERIALS AND EQUIPMENT SUBSTITUTIONS: CONTROL RELAYS, TIME CLOCKS, OR SIMILAR LOW PRESSURE INSTRUMENTS. OPENINGS IN DUCTS FOR PITOT TUBE INSERTION SHALL BE <br /> THE BID PRICE SHALL BE BASED ON THE MATERIALS, EQUIPMENT AND/OR SERVICES AS SCHEDULED ON THE CONTROL TRANSFORMER, CONTROL SEALED WITH SNAP-IN PLUGS AFTER AIR BALANCE IS COMPLETE. OUTLET AND INLET AIR QUANTITIES SHALL w <br /> DRAWINGS AND/OR SPECIFIED HEREIN, AND/OR AS ACCEPTED PRIOR TO BIDDING. PANELS, PRESURESTATS, MOTOR BE DETERMINED BY AN APPROVED METHOD. fg <br /> VALVES, DAMPER MOTORS, SOLENOID <br /> 2.02 REQUESTS FOR ACCEPTANCE OF ALTERNATIVES SHALL BE SUBMITTED TEN (10) DAYS PRIOR TO BID. VALVES, EP & PE SWITCHES, ETC. 3.51 TOTAL AIR QUANTITIES SHALL BE OBTAINED BY ADJUSTMENT OF FAN SPEEDS. THE BALANCING CONTRACTOR a <br /> AND ALL INTERLOCK WIRING MC MC MC SHALL FURNISH AND INSTALL ANY REQUIRED FAN DRIVE CHANGES AS PART OF THIS CONTRACT. ►� <br /> 2.03 ACCEPTANCE OF ALTERNATE OR SUBSTITUTE EQUIPMENT IN NO WAY VOIDS MATERIAL OR PERFORMANCEMC - MECHANICAL CONTRACT <br /> REQUIREMENTS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PERFORMANCE OF ANY MATERIAL OR 3.52 VOLUME ADJUSTERS MAY BE USED TO BALANCE AIR QUANTITIES AT OUTLETS AND INLETS PROVIDING FINAL �+ <br /> EQUIPMENT SUBSTITUTED FOR SPECIFIED ITEMS ACCEPTED BY THE ARCHITECT AND/OR ENGINEER BEFORE OR EC - ELECTRICAL CONTRACT rn <br /> ADJUSTMENTS ARE MINOR AND DO NOT PRODUCE OBJECTIONABLE DRAFTS OR EXCESSIVE SOUND LEVELS. <br /> o <br /> AFTER THE BID DATE. CONTRACTOR SHALL BE RESPONSIBLE FOR INCORPORATING ANY SUBSTITUTE EQUIPMENT THE MECHANICAL CONTRACTOR SHALL FURNISH ALL MAGNETIC STARTERS OR CONTACTORS. c. <br /> IN THE SYSTEM DESIGN. 3.53 CERTIFIED BALANCE REPORTS: THREE (3) COPIES OF THE AIR AND WATER BALANCE REPORT, CERTIFIED BY <br /> AUTOMATIC CONTROL AND PROTECTIVE OR SIGNAL DEVICES REQUIRED BUT NOT INDICATED ON THE BALANCING FIRM, SHALL BE SUBMITTED TO THE ARCHITECT/ENGINEER SEVEN (7) DAYS PRIOR TO FINAL <br /> CONTRACTOR SHALL PAY FOR ALL EXTRA COSTS BY ANY TRADE FOR CHANGES NECESSITATED BY MATERIAL OR 3.18 ALL MANUAL OR ACCEPTANCE OF THE PROJECT. THE REPORT SHALL INCLUDE ALL AIRAND WATER BALANCE DATE AND HEAT <br /> 2.04 ELECTRICAL PLANS SHALL BE FURNISHED AND INSTALLED UNDER THIS DIVISION OF THE SPECIFICATIONS. <br /> OF ACCEPTANCE WITHOUT FURTHER COST TO THE CLIENT. TRANSFER EQUIPMENT TEST DATA LISTED BELOW, AND OTHER DATA AS REQUIRED BY THE "NATIONAL 4..... .........9-,,r---a�wsawrr <br /> EQUIPMENT SUBSTITUTIONS REGARDLESS THE WIRING INSTALLATION SHALL CONFORM TO ELECTRICAL DIVISION. <br /> STANDARD FOR FIELD MEASUREMENTS AND INSTRUMENTATION". <br /> 2.05 REVIEW OF MATERIALS AND EQUIPMENT: WITHIN 30 DAYS OF CONTRACT AWARD, SUBMIT FIVE COPIES OF EACH <br /> 3.19 ALL WIRING CONNECTIONS TO CONTROLS ATTACHED TO DUCT WORK, OR MECHANICAL EQUIPMENT SHALL BE MADE 3.54 A.C. UNIT: CFM, STATIC PRESSURE, MOTOR HP, RPM, AND AMPS, PERCENT OF OUTSIDE AIR (OR CFM AS <br /> 2.06 GENERAL MATERIALS AND EQUIPMENT: ALL MATERIAL AND EQUIPMENT SHALL BE NEW AND OF THE BEST OF WITH FLEXIBLE CONNECTIONS TO PREVENT VIBRATION. <br /> CATALOG GRADE INDICATED AND/OR SPECIFIED AND SHALL BE FREE FROM ALL DEFECTS. APPLICABLE), FAN RPM, FAN BHP, INLET AND OUTLET DRY AND WET BULB TEMPERATURE, FAN DRIVE TYPE <br /> 3.20 COORDINATE WITH THE ELECTRICAL CONTRACTOR BEFORE ORDERING MOTORS AND/OR OTHER ELECTRICAL AND SIZE, WATER FLOW - <br /> 2.07 MATERIAL AND EQUIPMENT SPECIFIED HEREIN SHALL BE GUARANTEED BY THE MANUFACTURER TO PERFORM TO EQUIPMENT TO ASSURE ELECTRICAL EQUIPMENT BEING OF PROPER ELECTRICAL CHARACTERISTICS. <br /> STANDARDS INDICATED OR INFERRED IN PUBLISHED LITERATURE OR CATALOG DATA. MANUFACTURER'S 3.55 INDIVIDUAL OUTLET AND INLET TEST RESULTS: OUTLET AND INLET IDENTIFICATION (LOCATION AND NUMBER <br /> RECOMMENDATIONS SHALL BE CLOSELY FOLLOWED ON INSTALLATION. 3.21 FURNISH PROPER NEMA TYPE ENCLOSURES FOR ALL STARTERS AND/OR CONTACTORS AS REQUIRED BY USAGE OR DESIGNATION). <br /> CODE. 3.56 FOLLOWING FINAL ACCEPTANCE OF THE SYSTEM BALANCE BY THE OWNER, THE CONTRACTOR SHALL PERMANENTLY <br /> 2.08 REFRIGERANT PIPING: TYPE "L" OR TYPE "K" WITH BRAZED HIGH TEMPERATURE SOLDER JOINTS. PIPE <br /> SHALL BE CLEAN AND TESTED FOR LEAKS. INSULATE SUCTION PIPING WITH 1 INCH THICK FIBERGLASS WITH 3.22 PROVIDE HEAVY DUTY SPEED SELECTOR SWITCHES, THERMAL MAGNETIC SWITCHES, START STOP PUSH BUTTON MARK THE SETTINGS OF ALL VALVES, SPLITTERS, DAMPERS, AND OTHER ADJUSTMENT DEVICES SONCLOSCn CAN BE RESTORED IF DISTURBED AT ANY TIME. DEVICES SHALL NOT BE MARKED BEFORE FINAL Z <br /> FRJ JACKET SEALED WATER TIGHT. COVER OUTDOOR INSULATION WITH ALUMINUM OR PLASTIC JACKET STATIONS ETC. AS REQUIRED. ACCEPTANCE. C <br /> APPLIED IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS. 3.23 CUTTING AND PATCHING: CAREFULLY PERFORM ALL WORK WHERE CUTTING, CHANNELING, CHASING, OR 3.57 NO STRUCTURAL MEMBERS SHALL BE CUT WITHOUT THE APPROVAL OF THE ARCHITECT, AND ALL <br /> 2.09 ALL INSULATION SHALL HAVE A COMPOSITE (INSULATION, JACKET OR FACING, AND ADHESIVE) FIRE DRILLING OF FLOORS, WALLS, PARTITIONS, CEILINGS OR OTHER SURFACES IS NECESSARY FOR PROPER SUCH CUTTING SHALL BE DONE IN A MANNER DIRECTED BY HIM. (~ <br /> PIPINGS, OR OTHER MECHANICAL EQUIPMEN T. <br /> HAZARD RATING AS TESTED BY ASTM E-84, NFPA 255, OR UL 723, NOT TO EXCEED 25 FLAME SPREAD AND INSTALLATION OR SUPPORT OF DUCTS, 3.58 PROVIDE WEATHER-PROOF FLASHING AT ALL DUCT, PIPE, ETC. MECHANICAL PENETRATIONS <br /> 50 SMOKE DEVELOPED. ACCESSORIES SUCH AS COATINGS, TAPES, AND ADHESIVES SHALL HAVE THE 3.24 ANY DAMAGE TO BUILDING, PIPING, EQUIPMENT, PLASTER, WOODWORK OR METAL WORK SHALL BE REPAIRED BY THROUGH THE BUILDING WALLS AND ROOF. FLASHING SHALL BE DESIGNED AND INSTALLED PER <br /> SAME COMPONENT RATINGS. ALL INSULATING MATERIALS OR THEIR CONTAINERS SHALL HAVE A SKILLED MECHANICS OF TRADES INVOLVED, AT NO ADDITIONAL COST TO THE OWNER. SMACNA AND SHALL BE GUARANTEED WEATHER PROOF FOR THE DURATION OF THE GUARANTEE. 0. ...01LABEL INDICATING COMPLIANCE WITH THE ABOVE RATING. REFERENCE STANDARDS: NFPA D-255, 3.59 FIRE AND/OR SMOKE DAMPER .T..4 <br /> A.S.T.M. E-84, UL-723, ASHRAE 90-75 AND THE STATE ENERGY CODE. ACCEPTABLE MANUFACTURERS: 3.25 DO NOT CUT, CHANNEL, CHASE OR DRILL MASONRY OR TILE; OR CUT, DRILL OR WELD STRUCTURAL MEMBERS <br /> CERTAINTEED, OWENS-CORNING, KNAUF AND MANVILLE. OF THE BUILDING, ETC., WITHOUT FIRST OBTAINING ARCHITECT'S PERMISSION, IF PERMISSION IS 1. FURNISH AND INSTALL AT LOCATION SHOWN ON PLANS FIRE/SMOKE DAMPERS MEETING OR EXCEEDING THE <br /> GRANTED, PERFORM THIS WORK IN A MANNER APPROVED BY THE ARCHITECT. FOLLOWING SPECIFICATIONS: FRAME SHALL BE A MINIMUM OF 16 GAUGE GALVANIZED STEEL FORMED INTO A <br /> PART 3.00 EXECUTION <br /> STRUCTURAL HAT CHANNEL SHAPE WITH TABBED CORNERS FOR REINFORCEMENT. THE BLADES SHALL BE SINGLE W <br /> 3.26 CAULKING & WATERPROOFING: CAULK AROUND ALL PIPES, ETC. TO PREVENT AIR AND MOISTURE LEAKAGE SKIN 16 GAUGE MINIMUM GALVANIZED WITH THREE LONGITUDINAL GROOVES FOR REINFORCEMENT. BEARING <br /> 3.01 PERMITS AND INSPECTIONS: APPLY AND PAY FOR ALL PERMITS AND CERTIFICATES OF INSPECTION REQUIRED WITH COMPOUND APPROVED BY ARCHITECT/ENGINEER. <br /> FOR THE WORK, AND AT COMPLETION, PRESENT THE OWNER WITH THE SIGNED CERTIFICATES OF FINAL SHALL BE STAINLESS STEEL SLEEVE TURNING IN AN EXTRUDED HOLE IN THE FRAME. BLADE EDGE SEALS C <br /> 3.27 SEAL AROUND ALL PIPES AND DUCTS WITH FIREPROOF CAULKING OR GROUT WHERE THEY PASS THROUGH SHALL BEW SILICON RUBBER MECHANICALLY LOCKED IN BLADE EDGE (ADHESIVE OR CLIP FASTENED SEALS ARE <br /> INSPECTION. <br /> FLOORS, FIREWALLS, AND SHAFTS. NOT ACCEPTABLE). JAMB SEALS SHALL BE STAINLESS STEEL FLEXIBLE METAL COMPRESSION TY <br /> 3.02 UTILITIES: CHARGES BY UTILITY COMPANIES FOR PROVIDING SERVICES SHALL BE PAID BY OWNER AND WILL 2. EACH COMBINATION FIRE/SMOKE DAMPER SHALL BE RATED FOR 1.5 HOURS UNDER UL STANDARD 555 AND g• <br /> NOT BE A PART OF THIS CONTRACT. THE CONTRACTOR SHALL DO INSTALLATION WORK NORMALLY PROVIDED IN 3.28 PROVIDE FLASHINGS WHERE ALL PIPES AND DUCTS PIERCE OUTSIDE WALLS OR ROOF AS NECESSARY TO <br /> THIS CONTRACT. PREVENT MOISTURE ENTRY. SHALL FURTHER BE CLASSIFIED BY UL AS A LEAKAGE RATED DAMPER FOR USE IN SMOKE CONTROL SYSTEMS <br /> UNDER UL 555S AND BEAR THE UL LABELS FOR BOTH UL 555 AND UL 555S. FIRE/SMOKE DAMPERS IN TUNNEL <br /> 3.03 PLACE AND ARRANGE EQUIPMENT, PIPING, DUCTS, CONTROLS, ETC., TO FIT THE SPACE AVAILABLE. 3.29 INSERTS, SLEEVES & BLOCKOUTS: FURNISH AND INSTALL, PRIOR TO CONCRETE POURING OR OTHER CORRIDOR SHALL BE UL LISTED FOR TUNNEL CORRIDOR CONSTRUCTION I <br /> INCLUDING ALL OFFSETS IN PIPING OR DUCTS, DUCT TRANSFORMATIONS, ETC. REQUIRED. CONSTRUCTION, INSERTS, SLEEVES, OR BLOCKOUTS IN WALLS, FLOOR SLABS, ROOFS AND PARTITIONS FOR 3. IN ADDITION TO THE LEAKAGE RATING ALREADY SPECIFIED HEREIN, THE DAMPERS AND THEIR ACTUATORS Revisions: Date: <br /> PASSAGE OF ALL WORK INSTALLED UNDER THIS DIVISION. SHALL BE QUALIFIED UNDER UL 555S TO MINIMUM ELEVATED TEMPERATURE OF 250 DEGREES (F). <br /> MECHANICAL S FOR COPPER APPROPRIATE 120 VOLT ELECTRIC ACTUATORS SHALL BE INSTALLED BY THE DAMPER MANUFACTURER AT PERMIT SET 8/3/12 <br /> 3.04 SUBMIT SHOP DRAWINGS FOR TEMPERATURE CONTROL SYSTEMS, MECHANICAL EQUIPMENT WIRING, 3.30 PROVIDE GALVANIZED IRON AND STEEL PIPE SLEEVES FOR IRON PIPES. USE COPPER SLEEVE <br /> EQUIPMENT AND MATERIALS WHICH CANNOT BE ADEQUATELY DESCRIBED BY MANUFACTURER'S PRINTED SHEETS, PIPES. PROVIDE WOOD OR STEEL BLOCKOUTS FOR LARGE OPENINGS. SECURE ALL SUCH ITEMS FIRMLY IN THE TIME OF DAMPER FABRICATION. DAMPER AND ACTUATOR SHALL BE INSTALLED AS S SINGLE ENTITY <br /> Q <br /> AND FOR SUCH ADDITIONAL ITEMS AS THE ARCHITECT/ENGINEER MAY DIRECT. POSITION. WHICH MEETS ALL APPLICABLE UL 555 AND UL 555S QUALIFICATIONS FOR BOTH DAMPERS ANDACTUATORS. <br /> ACTUATORS. DAMPERS MUST OPEN AND CLOSE WITHIN 15 SECONDS OF APPROPRIATE SIGNAL AND DAMPERS <br /> 3.05 CLEARLY MARK SUBMITTALS AS TO PLAN CODE, SPECIFIC ITEM PROPOSED, CATALOG NUMBERS, RECESSMUST CLOSE UPON LACK OF POWER. <br /> OPENINGS, DIMENSIONS, CAPACITIES, ELECTRICAL CHARACTERISTICS, ETC.. SUBMITTALS WHICH ARE 3.31 VIBRATION-ABSORBING MOUNTINGS AND CONNECTIONS: ISOLATE EACH ITEM OF EQUIPMENT WITH MOVING <br /> INCOMPLETE WILL BE REJECTED. PARTS FROM THE BUILDING STRUCTURE ALONG WITH ANY PIPING, CONDUITS, OR DUCTS ATTACHED THERETO. 4. FIRE ALARM CONTRACTOR SHALL PROVIDE ALL NECESSARY SWITCHES AND RELAYS ETC. TO INTERFACE <br /> DAMPER BUILDING FIRE ALARM AND CONTROL SYSTEM AS REQUIRED. <br /> UNLESS OTHERWISE INDICATED, UNITS ISOLATING EQUIPMENT FROM STRUC TURE SHALL BE PROPERLY <br /> 3.06 THE ENGINEER'S CHECK SHALL BE GENERAL, AND DOES NOT RELIEVE THE CONTRACTOR OF FINAL DESIGNED SPRING-TYPE ISOLATORS. 5. IN SYSTEMS REQUIRING A SMOKE CONTROL SYSTEM, PROVIDE REMOTE SENSING OF DAMPER POSITION <br /> RESPONSIBILITY OF COMPLIANCE TO THE INTENT OF THE PLANS AND SPECIFICATIONS. AND DAMPER OVERRIDE OF DAMPER CLOSURE TO PERMIT CONTROLLED OPERATION IN A DYNAMIC SMOKE Job No.:212080 <br /> 3.32 BELT DRIVE GUARDS: PROVIDE BELT DRIVE GUARDS FOR ALL EQUIPMENT AND SAFETY SCREENS ON EXPOSED MANAGEMENT SYSTEM. DEVICE SHALL BE RUSKIN MODEL TS 150 FIRE STAT OR APPROVED. <br /> 3.07 SUPERVISION AND WORKMANSHIP: QUALIFIED SUPERVISION FOR EACH TRADE SHALL BE IN CHARGE OF THE FAN INLETS. 6. COMBINATION SMOKE/FIRE DAMPERS SHALL BE MANUFACTURED BY SAFEAIR, RUSKIN, GREENHECK, Date: <br /> WORK AT ALL TIMES AND SHALL BE ON THE JOB SITE WHENEVER WORK IN THAT TRADE IS BEING AIR BALANCE, NATIONAL CONTROLLED AIR AND PREFCO. <br /> ACCOMPLISHED. <br /> M3.O <br /> (30FS) <br /> 1402 SE Everett Mall Way, B1208-010 - <br />