PLUMBING GENERAL NOTES <br /> 1. COMPLETE INSTALLATION OF THE MECHANICAL SYSTEM SHALL BE PER THE STATE OF WASHINGTON °i <br /> BUILDING, MECHANICAL ENERGY, FIRE, PLUMBING AND HEALTH CODES AND REGULATIONS <br /> T <br /> AS ADOPTED BY LOCAL JURISDICTIONS. 1 ABOSSEIN <br /> 2. ALL EQUIPMENT/FIXTURES SHALL BE THE CAPACITY AND TYPES AS SHOWN ON THE PLUMBING SCHEDULE AND <br /> � / ENGINEERING <br /> SHALL BE THE LISTED MANUFACTURER AND MODEL NUMBER OR SHALL 8E AN EQUAL APPROVED BY THE <br /> OWNER/ENGINEER. <br /> j i <br /> L.L.0 <br /> 3. THE CONTRACTOR SHALL SUBMIT MINIMUM OF SIX COPIES OF EQUIPMENT/FIXTURE SUBMITTALS FOR APPROVAL. i <br /> 4. CONTRACTOR IS TO BRING UP ANY DISCREPANCIES AND ITEMS WHICH ARE NOT SPECIFICALLY CALLED �% <br /> FOR OR SHOWN BUT ARE REQUIRED FOR A COMPLETE MECHANICAL SYSTEM AND AFFECT HIS CONTRACT <br /> II � --- MECHANICAL-ELECTRICAL <br /> PRIOR TO ENTERING AND SIGNING THE CONTRACT; AFTER AWARDING THE CONTRACT ALL SUCH ITEMS <br /> REQUIRED FOR A COMPLETE SYSTEM READY FOR THE OWNER'S USE il <br /> SHALL BE FURNISHED - --_-_- -_- -- _- \\ CIVIL-LEED-STRUCTURAL <br /> \ FIRE PROTECTION <br /> AND INSTALLED INCLUDING ALL SUCH DISCREPANCY ITEMS MENTIONED ABOVE, AT NO ADDITIONAL COST I --� <br /> TO THE OWNER AND PER LOCAL CODES. MANUFACTURER'S RECOMMENDATIONS AND APPLICABLE 2"WATER SERVICE (50 GPM <br /> ___, / �� 2100 �12TH AVE. NE <br /> STANDARDS WITH THE ARCHITECT/ENGINEER'S APPROVAL. MIN, 90 GPM MAX W/ MAX _ BELL2100 1 2 WA 98004 <br /> PRESSURE OF 8OPSI WITH - <br /> 5. ALL EQUIPMENT/FIXTURES SUPPLIED FOR <br /> THESE SPECIFICATIONS SHALL BE FREE FROM DEFECTS IN MATERIAL, ) c - M�-- <br /> WATER METER VERIFY F�v./ioq//7 is,/.,ini 77,-,7,,,,,,,,,,...7-0,7777/H//H/////g///!/!///l///////!/O//iY//c4• --------- i 7 OFFICE: (425)462-9441 <br /> WORKMANSHIP, AND TITLE, AND SHALL BE OF THE KIND AND QUALITY DESCRIBED HEREIN. IF IT (VERIFY) r -� - <br /> FINAL ACCEPTANCE THAT EQUIPMENT DOES NOT MEET THE d I FAX: (425)462-9451 <br /> APPEARS WITHIN ONE YEAR FROM DATE OF : <br /> WARRANTIES ABOVE,THE CONTRACTOR SHALL IMMEDIATELY CORRECT ANY DEFECT AND SHALL RESTORE p - CService�abossein.cona <br /> _- EMAIL <br /> THE SYSTEM TO THE ORIGINAL CONDITIONS AT HIS EXPENSE. THE FOREGOING WARRANTY <br /> IS EXCLUSIVE AND IN LIEU OF OTHER WARRANTIES, WHETHER WRITTEN, ORAL, IMPLIED OR STATUTORY. ' NOTE: <br /> NO WARRANTY OF MERCHANT ABILITY OF FITNESS FOR PURPOSE SHALL APPLY. (THE WARRANTY SHALL G ��S <br /> WEBSITE: <br /> E // www.abossein.corn <br /> START FROM THE TIME OF ARCHITECT/ENGINEER'S FINAL ACCEPTANCE.) EXISTING 6"WASTE SEE CIVIL <br /> FOR VERIFICATION OF EXACT <br /> 6. ENTIRE INSTALLATION OF ALL EQUIPMENT, FIXTURES, PIPING, PLUMBING AND RELATED ACCESSORIES GI <br /> SHALL BE PER OWNERS' STANDARDS. MECHANICAL CONTRACTOR IS TO FAMILIARIZE HIMSELF WATER HEATER LOCATION 199,00 LOCATION AND DEPTH <br /> WITH THESE STANDARDS. BTUH LANDLORD SHALL PROVIDE <br /> APPROPRIATELY SIZED GAS PIPING I <br /> 7. COORDINATE WITH THE STRUCTURAL ENGINEER TO PROVIDE STRUCTURAL SUPPORT FOR ALL EQUIPMENT. <br /> TO TENANTS WATER HEATER. <br /> ALL REQUIRED WORK IN \' �/-� <br /> 8. COORDINATE THE CONSTRUCTION SCHEDULE WITH THE OWNER AND PERFORM Q 65-�-3 °'� h �` � <br /> STRICT ACCORDANCE WITH THE OWNER'S SCHEDULE. Z: iiiiW4 <br /> 9. PLUMBING CONTRACTOR SHALL PAY FOR AND OBTAIN ALL REQUIRED PERMITS AND CERTIFICATES REQUIRED '? '- <br /> BY THE AUTHORITIES HAVING JURISDICTION. o { 0 <br /> , '� � �' <br /> AND PUT ALL PLUMBING SYSTEMS IN 4"0 VENT THROUGH I <br /> ts.:: <br /> 10.ADJUST ALL EQUIPMENT AND PERFORM A COMPLETE WATER-BALANCING <br /> o, ROOF (VTW) FOR � r� <br /> 7 CD c <br /> OPERATION. <br /> PLUMBING FIXTURES - <br /> i J =its t, `,,,. <br /> 11. AIR-CONDITIONING UNIT COIL WITHOUT INTERNAL TRAP SHALL HAVE A P-TRAP (3" MIN. SEAL) FOR THE 2: ! !, LiL,______ <br /> CONDENSATE PAN. DISCHARGE CONDENSATE DRAIN TO ROOF DRAIN. <br /> K� <br /> 12. PLUMBING CONTRACTOR SHALL VISIT THE SITE TO DETERMINE THE EXACT IMPACT OF THE NEW CONSTRUCTION <br /> IN HIS BID ALL THE WORK WHICH MIGHT NOT BE SPECIFICALLY ;�`,~ r.�.6.w,..,��„1.p. <br /> FOR THE PLUMBING SYSTEM AND SHALL INCLUDE I- <br /> �,�/�a� � �r�rowcs�ruvsiu�wa�caa���sc <br /> MENTIONED BUT ARE REQUIRED FOR A COMPLETE PLUMBING SYSTEM READY FOR OWNER'S BENEFICIAL USE. <br /> 1 , \0 s. <br /> co <br /> 13. SCOPE OF WORK: ' <br /> rn <br /> i <br /> THE CONTRACTOR SHALL INCLUDE IN HIS BID ALL THE COST RELATED TO INSTALLING NEW PIPING AND <br /> ------ - - __ - <br /> NEW FIXTURES AS SHOWN AND AS REQUIRED BY THE UNIFORM PLUMBING CODE AND THE LOCAL -o -6 o- i -2-'7,, <br /> y <br /> C) E-4 -.4 <br /> JURISDICTIONS. ALL PLUMBING SYSTEM (PIPING, FIXTURES, EQUIPMENT, ETC.) INSIDE THE BUILDING SHALL Z <br /> BE NEW AND CONNECT TO NEW SANITARY AND NEW WATER PIPES OUTSIDE THE BUILDING. �/�[ <br /> THE CONTRACTOR SHALL INCLUDE IN HIS BID ALL THE COST RELATED TO INVESTIGATING THE ROUTING �- ,% 0 <br /> OF SITE UTILITY PIPES IN ORDER TO MAKE NEW CONNECTIONS FOR THE NEW FIXTURES. (THE PIPE <br /> ROUTING AND CONNECTIONS MAY NOT BE SPECIFICALLY SHOWN ON THE DRAWINGS) I41) T.,1 <br /> 14 <br /> o ' <br /> THE CONTRACTOR SHALL INCLUDE IN HIS BID ALL THE COSTS REQUIRED FOR ALL THE PIPING TO 41'0 VENT THROUGH <br /> NOTE: W <br /> MEET THE PIPE SIZES PER THE UNIFORM PLUMBING CODES APPENDIX A ROOF (VTW) FOR <br /> SEE ARCHITECTURAL DRAWINGS AND SPECIFICATIONS FOR ADDITIONAL SCOPE OF WORK, INSTRUCTION TO PLUMBING FIXTURES GIA - I'--� <br /> 14. CONNECT NEW 4"WASTE <br /> BIDDERS AND EXACT LOCATION OF ALL FIXTURES. -- -i j <br /> I TO EXISTING 6" SEE CIVIL <br /> 0 OF ALL EQUIPMENT, FIXTURES, PIPING, ETC. AND PENETRATIONS WITH THE I FOR LOCATION AND DEPTH P4 <br /> 15. COORDINATE EXACT LOCATION Q � I MIN. 4" SANITARY SEWER � � [�\ <br /> ARCHITECTURAL STRUCTURAL AND AT SITE. <br /> _-- -IoleLINE.\ <br /> i <br /> 16. ALL APPLICABLE CODES AND LOCAL JURISDICTION REGULATIONS SHALL SUPERSEDE THE CONSTRUCTION � I _ - <br /> CO ..-g, <br /> DOCUMENTS IF THEY ARE MORE STRINGENT. NOTE: i I / <br /> j - '� <br /> 17. INSTALL ALL TRAP ARMS SUCH THAT THE MAXIMUM LENGTH WILL NOT EXCEED THE CODE REQUIREMENTS. C-+ <br /> ACCORDING TO PULIMINARY FIXTURE <br /> 18.ALL FIXTURES REQUIRING PLUMBING SHALL BE CONNECTED TO BUILDING WASTE, VENT, COLD WATER AND HOT PLAN DATED 7/19/12 \ <br /> WATER SYSTEM AS REQUIRED BY THE CODES. BASED ON A 80 UNIT FIXTURE "It a <br /> 19. INSTALL CLEANOUTS PER THE 2009 UPC-SECTION 707 AND AS REQUIRED BY LOCAL <br /> JURISDICTIONS. COUNT 2" METER 2" MAINLINE \ W <br /> 200 LINEAR FEET. NEW 1 1/2 I <i <br /> 20. PIPE MATERIAL: SERVICE AND GATE VALVE FOR I I \ <br /> ULTA CUT AND TIE INTO EXISTING � - <br /> "L" (ABOVE GROUND LEAD <br /> COLD WATER Sc HOT WATER COPPER )( FREE) <br /> 2". VERIFY CEILING LOCATION. _ - - ----- o o \ \ <br /> - -- ___------- -- --- - <br /> \ 0 <4 <br /> WASTE AND VENT CAST IRON, COPPER <br /> NOTE: JOINTS AND METHOD OF CONNECTIONS SHALL BE PER THE 2009 UPC-CHAPTER #14, ASTM STANDARDS _ -- ___ <br /> ! <br /> AND MANUFACTURERS RECOMMENDATIONS FOR EACH PIPE TYPE AND APPLICATIONS. <br /> INSULATION: - - _I I \ - <br /> _41D E-"I <br /> 21. PIPE -- -- -- - -- -_.- r __- _- _ � _=, --- --- <br /> ,/,,,,,, ._:/,/A/ti AA1/l/�.�/A��/�A.l//f�'/'.r/l///.ff/�//////��/%'d�6/S,,�i/�A A. %A�1�:%Ya%�G%/'/�'����.%9///////A✓�.�.�.ry/l�/^��l;'; '//Aft' 9,�,.lfY/�r1,rt -_... __ <br /> COLD WATER - 1/2" INSULATION WITH VAPOR BARRIER JACKETS. S � - I I Hwy <br /> HOT WATER - 1" INSULATION WITH VAPOR BARRIER JACKETS. FOR RUNOUTS UP TO 12 w <br /> FEET AND 1" INSULATION FOR ALL PIPING UP TO 2" DIAMETER. <br /> UNDERGROUND PIPING WITH 1/2" CLOSED CELL FOAM INSULATION. NOTE: //# I <br /> 22. PIPE HANGERS AND SUPPORTS: NEW SERVICE AND GATE VALVE & <br /> PIPE HANGERS AND SUPPORTS SHALL BE IN STRICT ACCORDANCE WITH THE 2009 UPC-SECTION-314 AND PIPE SUB METER FOR ULTA. CUT AND <br /> ,, , , E <br /> BE SEISMICALLY RESTRAINED PER LATEST EDITION TIE INTO 2" EXISTING. VERIFY // Pk w-. <br /> MANUFACTURERS RECOMMENDATIONS. ALL PIPES SHALL CEILING LOCATION. SIZE TO BE � I <br /> NOTE: <br /> OF S.M.A.C.N.A. SEISMIC RESTRAINT MANUAL AND AS REQUIRED BY LOCAL JURISDICTION. DETERMINED. - <br /> 23.THE CONTRACTOR SHALL INCLUDE ALL EXCAVATION AND BACKFILLING REQUIRED FOR UNDERGROUND 7- -- - NEW SERVICE AND GATE VALVE & <br /> WORK IN HIS BID UNLESS OTHER ARRANGEMENTS ARE MADE WITH THE GENERAL CONTRACTOR PRIOR __� SUB METER FOOD COURT. CUT ANDS ' I 1 /r//////l//�/ <br /> //of ✓ A/ 1/irri/irll, A� .:., 12,7 <br /> tea-/�TO BIDDING. (COORDINATE WITH SITE/CIVIL ENGINEER). TIE INTO 2" EXISTING. VERIFY . ,, _ ____-._._-_-___ �, �� CEILING LOCATION. SIZE TO BE & i\�24. DOMESTIC HOT WATER SYSTEM SHALL BE SET FOR 120'F OR AS REQUIRED BY LOCAL JRSD. - , DETERMINED. I - ---- - %;���x / ;,��� //�I I25.ALL WATER LINES SHALL BE STERILIZED IN ACCORDANCE WITH THE A.W.W.A. STANDARDS AND LOCAL REGULATIONS. <<__ L________._ <br /> K /,\ <br /> - I <br /> 26.ALL MATERIALS USED SHALL BE NEW AND BEAR U.L. LABEL WHEN REQUIRED. - II -- -- \ �/ <br /> i ;./� J <br /> ASBUILT DRAWINGS SHALL BE SUBMITTED TO ENGINEER/OWNER. 1 ''- I <br /> 27. FINAL �.� %' \\ i <br /> 28.ALL OPENINGS AND PENETRATIONS THROUGH ROOF AND/OR WALLS SHALL BE PROPERLY SEALED, /i ��,,- <br /> WEATHERTIGHT, AND AESTHETICALLY ACCEPTABLE. - <br /> /, \ Z <br /> 29. ALL CUTTING AND PATCHING REQUIRED FOR INSTALLATION OF NEW EQUIPMENT, FIXTURES AND PIPING <- j f�'i \ <br /> TO BE BY CONTRACTOR. / <br /> , ,, __„, c24 <br /> 30. INSTALL AIR CHAMBERS BEHIND EACH OUTLET OR WADE-SHOKSTOPS FOR EACH FIXTURE GROUP AND WATER <br /> HAMMER ARRESTORS AS SCHEDULED. <br /> � ' 1-) o4 <br /> I- <br /> i <br /> i / <br /> 2'- \ E] , ,- ------ <br /> LENGEND AND ABBREVIATIONS '�`;_„ ---11. ----,\( . \ // ; <br /> SYMBOL ABBR DESCRIPTION SYMBOL ABBR DESCRIPTION / \\ \\ '' <br /> 1"I COLD WATER PIPE ---- CW COLD WATER PIPE <br /> --- HW HOT WATER PIPE c O <br /> ® HOT WATER PIPE V VENT FLOOR PLAN - PLUMBING <br /> 0 <br /> 4" WASTE/SANITARYU PIPE SIZE W/SS WASTE OR SANITARY SEWER PIPE SCALE: 1/8"= 1'-0" - <br /> .44 <br /> _- _ a <br /> GV GATE VALVE <br /> -"D4- <br /> 2" VENT PIPE SIZE <br /> CW BALL VALVE NORTH <br /> P1 PLUMBING FIXTURE TAG ® VTR VENT THRU ROOF <br /> 0 PLAN NOTE#1 .... BURIED PIPE <br /> H FCC FLOOR CLEANOUT 41- CHECK VALVE <br /> 0,5" 1/2"PIPE SIZE CONN CONNECT <br /> Revisions: Date: <br /> 0.75" 3/4"PIPE SIZE <br /> 1" 1"PIPE SIZE TEMP TEMPREATURE <br /> PERMIT SEf 8/3 12 <br /> 1.25" 1-1/4"PIPE SIZE PRESS PRESSURE <br /> 1.5" 1-1/2"PIPE SIZE EXIST EXISTING <br /> 2" 2"PIPE SIZE ii <br /> 2.5" 2-1/2"PIPE SIZE TYP TYPICAL <br /> 3" 3"PIPE SIZE DN DOWN LS, <br /> o- PIPE ELBOW UP GPH GALLONS PER HOUR <br /> o- PIPE ELBOW DOWN <br /> 109611/f.Q'�li®ICSA1/./Y7Jili7Y"1.1YJC71lIi7/1d1. <br /> -o- PIPE TEE UP GPM GALLONS PER MINUTE <br /> -ED- PIPE TEE DOWN <br /> Job No.:212080 1 <br /> Date: <br /> P1 .0 <br /> I <br /> 1 <br /> (1 OF 3) <br /> 1402 SE Everett Mall onlay, B1208-010 <br />