PLUMBING GENERAL NOTES
<br /> 1. COMPLETE INSTALLATION OF THE MECHANICAL SYSTEM SHALL BE PER THE STATE OF WASHINGTON °i
<br /> BUILDING, MECHANICAL ENERGY, FIRE, PLUMBING AND HEALTH CODES AND REGULATIONS
<br /> T
<br /> AS ADOPTED BY LOCAL JURISDICTIONS. 1 ABOSSEIN
<br /> 2. ALL EQUIPMENT/FIXTURES SHALL BE THE CAPACITY AND TYPES AS SHOWN ON THE PLUMBING SCHEDULE AND
<br /> � / ENGINEERING
<br /> SHALL BE THE LISTED MANUFACTURER AND MODEL NUMBER OR SHALL 8E AN EQUAL APPROVED BY THE
<br /> OWNER/ENGINEER.
<br /> j i
<br /> L.L.0
<br /> 3. THE CONTRACTOR SHALL SUBMIT MINIMUM OF SIX COPIES OF EQUIPMENT/FIXTURE SUBMITTALS FOR APPROVAL. i
<br /> 4. CONTRACTOR IS TO BRING UP ANY DISCREPANCIES AND ITEMS WHICH ARE NOT SPECIFICALLY CALLED �%
<br /> FOR OR SHOWN BUT ARE REQUIRED FOR A COMPLETE MECHANICAL SYSTEM AND AFFECT HIS CONTRACT
<br /> II � --- MECHANICAL-ELECTRICAL
<br /> PRIOR TO ENTERING AND SIGNING THE CONTRACT; AFTER AWARDING THE CONTRACT ALL SUCH ITEMS
<br /> REQUIRED FOR A COMPLETE SYSTEM READY FOR THE OWNER'S USE il
<br /> SHALL BE FURNISHED - --_-_- -_- -- _- \\ CIVIL-LEED-STRUCTURAL
<br /> \ FIRE PROTECTION
<br /> AND INSTALLED INCLUDING ALL SUCH DISCREPANCY ITEMS MENTIONED ABOVE, AT NO ADDITIONAL COST I --�
<br /> TO THE OWNER AND PER LOCAL CODES. MANUFACTURER'S RECOMMENDATIONS AND APPLICABLE 2"WATER SERVICE (50 GPM
<br /> ___, / �� 2100 �12TH AVE. NE
<br /> STANDARDS WITH THE ARCHITECT/ENGINEER'S APPROVAL. MIN, 90 GPM MAX W/ MAX _ BELL2100 1 2 WA 98004
<br /> PRESSURE OF 8OPSI WITH -
<br /> 5. ALL EQUIPMENT/FIXTURES SUPPLIED FOR
<br /> THESE SPECIFICATIONS SHALL BE FREE FROM DEFECTS IN MATERIAL, ) c - M�--
<br /> WATER METER VERIFY F�v./ioq//7 is,/.,ini 77,-,7,,,,,,,,,,...7-0,7777/H//H/////g///!/!///l///////!/O//iY//c4• --------- i 7 OFFICE: (425)462-9441
<br /> WORKMANSHIP, AND TITLE, AND SHALL BE OF THE KIND AND QUALITY DESCRIBED HEREIN. IF IT (VERIFY) r -� -
<br /> FINAL ACCEPTANCE THAT EQUIPMENT DOES NOT MEET THE d I FAX: (425)462-9451
<br /> APPEARS WITHIN ONE YEAR FROM DATE OF :
<br /> WARRANTIES ABOVE,THE CONTRACTOR SHALL IMMEDIATELY CORRECT ANY DEFECT AND SHALL RESTORE p - CService�abossein.cona
<br /> _- EMAIL
<br /> THE SYSTEM TO THE ORIGINAL CONDITIONS AT HIS EXPENSE. THE FOREGOING WARRANTY
<br /> IS EXCLUSIVE AND IN LIEU OF OTHER WARRANTIES, WHETHER WRITTEN, ORAL, IMPLIED OR STATUTORY. ' NOTE:
<br /> NO WARRANTY OF MERCHANT ABILITY OF FITNESS FOR PURPOSE SHALL APPLY. (THE WARRANTY SHALL G ��S
<br /> WEBSITE:
<br /> E // www.abossein.corn
<br /> START FROM THE TIME OF ARCHITECT/ENGINEER'S FINAL ACCEPTANCE.) EXISTING 6"WASTE SEE CIVIL
<br /> FOR VERIFICATION OF EXACT
<br /> 6. ENTIRE INSTALLATION OF ALL EQUIPMENT, FIXTURES, PIPING, PLUMBING AND RELATED ACCESSORIES GI
<br /> SHALL BE PER OWNERS' STANDARDS. MECHANICAL CONTRACTOR IS TO FAMILIARIZE HIMSELF WATER HEATER LOCATION 199,00 LOCATION AND DEPTH
<br /> WITH THESE STANDARDS. BTUH LANDLORD SHALL PROVIDE
<br /> APPROPRIATELY SIZED GAS PIPING I
<br /> 7. COORDINATE WITH THE STRUCTURAL ENGINEER TO PROVIDE STRUCTURAL SUPPORT FOR ALL EQUIPMENT.
<br /> TO TENANTS WATER HEATER.
<br /> ALL REQUIRED WORK IN \' �/-�
<br /> 8. COORDINATE THE CONSTRUCTION SCHEDULE WITH THE OWNER AND PERFORM Q 65-�-3 °'� h �` �
<br /> STRICT ACCORDANCE WITH THE OWNER'S SCHEDULE. Z: iiiiW4
<br /> 9. PLUMBING CONTRACTOR SHALL PAY FOR AND OBTAIN ALL REQUIRED PERMITS AND CERTIFICATES REQUIRED '? '-
<br /> BY THE AUTHORITIES HAVING JURISDICTION. o { 0
<br /> , '� � �'
<br /> AND PUT ALL PLUMBING SYSTEMS IN 4"0 VENT THROUGH I
<br /> ts.::
<br /> 10.ADJUST ALL EQUIPMENT AND PERFORM A COMPLETE WATER-BALANCING
<br /> o, ROOF (VTW) FOR � r�
<br /> 7 CD c
<br /> OPERATION.
<br /> PLUMBING FIXTURES -
<br /> i J =its t, `,,,.
<br /> 11. AIR-CONDITIONING UNIT COIL WITHOUT INTERNAL TRAP SHALL HAVE A P-TRAP (3" MIN. SEAL) FOR THE 2: ! !, LiL,______
<br /> CONDENSATE PAN. DISCHARGE CONDENSATE DRAIN TO ROOF DRAIN.
<br /> K�
<br /> 12. PLUMBING CONTRACTOR SHALL VISIT THE SITE TO DETERMINE THE EXACT IMPACT OF THE NEW CONSTRUCTION
<br /> IN HIS BID ALL THE WORK WHICH MIGHT NOT BE SPECIFICALLY ;�`,~ r.�.6.w,..,��„1.p.
<br /> FOR THE PLUMBING SYSTEM AND SHALL INCLUDE I-
<br /> �,�/�a� � �r�rowcs�ruvsiu�wa�caa���sc
<br /> MENTIONED BUT ARE REQUIRED FOR A COMPLETE PLUMBING SYSTEM READY FOR OWNER'S BENEFICIAL USE.
<br /> 1 , \0 s.
<br /> co
<br /> 13. SCOPE OF WORK: '
<br /> rn
<br /> i
<br /> THE CONTRACTOR SHALL INCLUDE IN HIS BID ALL THE COST RELATED TO INSTALLING NEW PIPING AND
<br /> ------ - - __ -
<br /> NEW FIXTURES AS SHOWN AND AS REQUIRED BY THE UNIFORM PLUMBING CODE AND THE LOCAL -o -6 o- i -2-'7,,
<br /> y
<br /> C) E-4 -.4
<br /> JURISDICTIONS. ALL PLUMBING SYSTEM (PIPING, FIXTURES, EQUIPMENT, ETC.) INSIDE THE BUILDING SHALL Z
<br /> BE NEW AND CONNECT TO NEW SANITARY AND NEW WATER PIPES OUTSIDE THE BUILDING. �/�[
<br /> THE CONTRACTOR SHALL INCLUDE IN HIS BID ALL THE COST RELATED TO INVESTIGATING THE ROUTING �- ,% 0
<br /> OF SITE UTILITY PIPES IN ORDER TO MAKE NEW CONNECTIONS FOR THE NEW FIXTURES. (THE PIPE
<br /> ROUTING AND CONNECTIONS MAY NOT BE SPECIFICALLY SHOWN ON THE DRAWINGS) I41) T.,1
<br /> 14
<br /> o '
<br /> THE CONTRACTOR SHALL INCLUDE IN HIS BID ALL THE COSTS REQUIRED FOR ALL THE PIPING TO 41'0 VENT THROUGH
<br /> NOTE: W
<br /> MEET THE PIPE SIZES PER THE UNIFORM PLUMBING CODES APPENDIX A ROOF (VTW) FOR
<br /> SEE ARCHITECTURAL DRAWINGS AND SPECIFICATIONS FOR ADDITIONAL SCOPE OF WORK, INSTRUCTION TO PLUMBING FIXTURES GIA - I'--�
<br /> 14. CONNECT NEW 4"WASTE
<br /> BIDDERS AND EXACT LOCATION OF ALL FIXTURES. -- -i j
<br /> I TO EXISTING 6" SEE CIVIL
<br /> 0 OF ALL EQUIPMENT, FIXTURES, PIPING, ETC. AND PENETRATIONS WITH THE I FOR LOCATION AND DEPTH P4
<br /> 15. COORDINATE EXACT LOCATION Q � I MIN. 4" SANITARY SEWER � � [�\
<br /> ARCHITECTURAL STRUCTURAL AND AT SITE.
<br /> _-- -IoleLINE.\
<br /> i
<br /> 16. ALL APPLICABLE CODES AND LOCAL JURISDICTION REGULATIONS SHALL SUPERSEDE THE CONSTRUCTION � I _ -
<br /> CO ..-g,
<br /> DOCUMENTS IF THEY ARE MORE STRINGENT. NOTE: i I /
<br /> j - '�
<br /> 17. INSTALL ALL TRAP ARMS SUCH THAT THE MAXIMUM LENGTH WILL NOT EXCEED THE CODE REQUIREMENTS. C-+
<br /> ACCORDING TO PULIMINARY FIXTURE
<br /> 18.ALL FIXTURES REQUIRING PLUMBING SHALL BE CONNECTED TO BUILDING WASTE, VENT, COLD WATER AND HOT PLAN DATED 7/19/12 \
<br /> WATER SYSTEM AS REQUIRED BY THE CODES. BASED ON A 80 UNIT FIXTURE "It a
<br /> 19. INSTALL CLEANOUTS PER THE 2009 UPC-SECTION 707 AND AS REQUIRED BY LOCAL
<br /> JURISDICTIONS. COUNT 2" METER 2" MAINLINE \ W
<br /> 200 LINEAR FEET. NEW 1 1/2 I <i
<br /> 20. PIPE MATERIAL: SERVICE AND GATE VALVE FOR I I \
<br /> ULTA CUT AND TIE INTO EXISTING � -
<br /> "L" (ABOVE GROUND LEAD
<br /> COLD WATER Sc HOT WATER COPPER )( FREE)
<br /> 2". VERIFY CEILING LOCATION. _ - - ----- o o \ \
<br /> - -- ___------- -- --- -
<br /> \ 0 <4
<br /> WASTE AND VENT CAST IRON, COPPER
<br /> NOTE: JOINTS AND METHOD OF CONNECTIONS SHALL BE PER THE 2009 UPC-CHAPTER #14, ASTM STANDARDS _ -- ___
<br /> !
<br /> AND MANUFACTURERS RECOMMENDATIONS FOR EACH PIPE TYPE AND APPLICATIONS.
<br /> INSULATION: - - _I I \ -
<br /> _41D E-"I
<br /> 21. PIPE -- -- -- - -- -_.- r __- _- _ � _=, --- ---
<br /> ,/,,,,,, ._:/,/A/ti AA1/l/�.�/A��/�A.l//f�'/'.r/l///.ff/�//////��/%'d�6/S,,�i/�A A. %A�1�:%Ya%�G%/'/�'����.%9///////A✓�.�.�.ry/l�/^��l;'; '//Aft' 9,�,.lfY/�r1,rt -_... __
<br /> COLD WATER - 1/2" INSULATION WITH VAPOR BARRIER JACKETS. S � - I I Hwy
<br /> HOT WATER - 1" INSULATION WITH VAPOR BARRIER JACKETS. FOR RUNOUTS UP TO 12 w
<br /> FEET AND 1" INSULATION FOR ALL PIPING UP TO 2" DIAMETER.
<br /> UNDERGROUND PIPING WITH 1/2" CLOSED CELL FOAM INSULATION. NOTE: //# I
<br /> 22. PIPE HANGERS AND SUPPORTS: NEW SERVICE AND GATE VALVE &
<br /> PIPE HANGERS AND SUPPORTS SHALL BE IN STRICT ACCORDANCE WITH THE 2009 UPC-SECTION-314 AND PIPE SUB METER FOR ULTA. CUT AND
<br /> ,, , , E
<br /> BE SEISMICALLY RESTRAINED PER LATEST EDITION TIE INTO 2" EXISTING. VERIFY // Pk w-.
<br /> MANUFACTURERS RECOMMENDATIONS. ALL PIPES SHALL CEILING LOCATION. SIZE TO BE � I
<br /> NOTE:
<br /> OF S.M.A.C.N.A. SEISMIC RESTRAINT MANUAL AND AS REQUIRED BY LOCAL JURISDICTION. DETERMINED. -
<br /> 23.THE CONTRACTOR SHALL INCLUDE ALL EXCAVATION AND BACKFILLING REQUIRED FOR UNDERGROUND 7- -- - NEW SERVICE AND GATE VALVE &
<br /> WORK IN HIS BID UNLESS OTHER ARRANGEMENTS ARE MADE WITH THE GENERAL CONTRACTOR PRIOR __� SUB METER FOOD COURT. CUT ANDS ' I 1 /r//////l//�/
<br /> //of ✓ A/ 1/irri/irll, A� .:., 12,7
<br /> tea-/�TO BIDDING. (COORDINATE WITH SITE/CIVIL ENGINEER). TIE INTO 2" EXISTING. VERIFY . ,, _ ____-._._-_-___ �, �� CEILING LOCATION. SIZE TO BE & i\�24. DOMESTIC HOT WATER SYSTEM SHALL BE SET FOR 120'F OR AS REQUIRED BY LOCAL JRSD. - , DETERMINED. I - ---- - %;���x / ;,��� //�I I25.ALL WATER LINES SHALL BE STERILIZED IN ACCORDANCE WITH THE A.W.W.A. STANDARDS AND LOCAL REGULATIONS. <<__ L________._
<br /> K /,\
<br /> - I
<br /> 26.ALL MATERIALS USED SHALL BE NEW AND BEAR U.L. LABEL WHEN REQUIRED. - II -- -- \ �/
<br /> i ;./� J
<br /> ASBUILT DRAWINGS SHALL BE SUBMITTED TO ENGINEER/OWNER. 1 ''- I
<br /> 27. FINAL �.� %' \\ i
<br /> 28.ALL OPENINGS AND PENETRATIONS THROUGH ROOF AND/OR WALLS SHALL BE PROPERLY SEALED, /i ��,,-
<br /> WEATHERTIGHT, AND AESTHETICALLY ACCEPTABLE. -
<br /> /, \ Z
<br /> 29. ALL CUTTING AND PATCHING REQUIRED FOR INSTALLATION OF NEW EQUIPMENT, FIXTURES AND PIPING <- j f�'i \
<br /> TO BE BY CONTRACTOR. /
<br /> , ,, __„, c24
<br /> 30. INSTALL AIR CHAMBERS BEHIND EACH OUTLET OR WADE-SHOKSTOPS FOR EACH FIXTURE GROUP AND WATER
<br /> HAMMER ARRESTORS AS SCHEDULED.
<br /> � ' 1-) o4
<br /> I-
<br /> i
<br /> i /
<br /> 2'- \ E] , ,- ------
<br /> LENGEND AND ABBREVIATIONS '�`;_„ ---11. ----,\( . \ // ;
<br /> SYMBOL ABBR DESCRIPTION SYMBOL ABBR DESCRIPTION / \\ \\ ''
<br /> 1"I COLD WATER PIPE ---- CW COLD WATER PIPE
<br /> --- HW HOT WATER PIPE c O
<br /> ® HOT WATER PIPE V VENT FLOOR PLAN - PLUMBING
<br /> 0
<br /> 4" WASTE/SANITARYU PIPE SIZE W/SS WASTE OR SANITARY SEWER PIPE SCALE: 1/8"= 1'-0" -
<br /> .44
<br /> _- _ a
<br /> GV GATE VALVE
<br /> -"D4-
<br /> 2" VENT PIPE SIZE
<br /> CW BALL VALVE NORTH
<br /> P1 PLUMBING FIXTURE TAG ® VTR VENT THRU ROOF
<br /> 0 PLAN NOTE#1 .... BURIED PIPE
<br /> H FCC FLOOR CLEANOUT 41- CHECK VALVE
<br /> 0,5" 1/2"PIPE SIZE CONN CONNECT
<br /> Revisions: Date:
<br /> 0.75" 3/4"PIPE SIZE
<br /> 1" 1"PIPE SIZE TEMP TEMPREATURE
<br /> PERMIT SEf 8/3 12
<br /> 1.25" 1-1/4"PIPE SIZE PRESS PRESSURE
<br /> 1.5" 1-1/2"PIPE SIZE EXIST EXISTING
<br /> 2" 2"PIPE SIZE ii
<br /> 2.5" 2-1/2"PIPE SIZE TYP TYPICAL
<br /> 3" 3"PIPE SIZE DN DOWN LS,
<br /> o- PIPE ELBOW UP GPH GALLONS PER HOUR
<br /> o- PIPE ELBOW DOWN
<br /> 109611/f.Q'�li®ICSA1/./Y7Jili7Y"1.1YJC71lIi7/1d1.
<br /> -o- PIPE TEE UP GPM GALLONS PER MINUTE
<br /> -ED- PIPE TEE DOWN
<br /> Job No.:212080 1
<br /> Date:
<br /> P1 .0
<br /> I
<br /> 1
<br /> (1 OF 3)
<br /> 1402 SE Everett Mall onlay, B1208-010