<br /> GENERAL NOTES DIVISION I GENERAL REQUIREMENTS/GENERAL CONDITIONS (CONT.)
<br /> DIVISION VIII DOORS & WINDOWS DIVISION IX FINISHES (CONT.)
<br /> F. VINYL COMPOSITION TILE: � �
<br /> 1
<br /> A. DOORS AND HARDWARE: 1. VINYL
<br /> TO RESPONSIBILITY SCHEDULE AND FINISH SCHEDULE ..i
<br /> THE VISIT THE SITEANDVERIFY ALLD EXISTING CONDITIONS. BRING ANY DEVIATIONS TO I. GUARANTEE:
<br /> ATTENTION OF THE LANDLORD'S PROJECT MANAGER. 1. A WRITTEN GUARANTEE SHALL BE PROVIDED ON ALL LABOR AND MATERIALS 1. FURNISH AND INSTALL ALL DOORS, FRAMES, HARDWARE AND RELATED PARTS AND 2. ALL EDGE CONDITIONS AT TRANSITIONS TO BE FLOATED UP FOR SMOOTH EVEN � x �
<br /> FOR A PERIOD OF NO LESS THAN ONE YEAR FROM THE DATE OF THE MATERIALS AS INDICATED ON DRAWINGS AND RESPONSIBILITY SCHEDULE. TRANSITION. W �� ��
<br /> 2. ALL DIMENSIONS SHOWN SHALL BE CONSIDERED APPROXIMATE. CONTRACTOR SHALL SUBSTANTIAL COMPLETION OF THE PROJECT. 2. HOLLOW METAL FRAMES: K.D. MINIMUM 16 GA. SIZE, SHAPE AND PARTITION TYPE T. ALL SUBFLOORS TO BE TESTED RESULTS COMPARED TO !..
<br /> t
<br /> TOCOMMENCING THE WORK. FAILURE TO DO 2. THE TENANT'S REPRESENTATIVES SIGNATURE AND DATE OF ACCEPTANCE IS PER DOOR SCHEDULE. 3. ALL
<br /> RECOMMENDED MOISTURE TESTED AND RESULTS
<br /> ANY PROBLEMS DUE � �t
<br /> FIELDOVERIFY ALL DIMENSIONS PRIOR
<br /> {� UPON THE CONTRACTOR. REQUIRED IN ORDER TO ACTIVATE THIS GUARANTEE. THIS GUARANTEE SHALL 3. LABELED DOORS: PROVIDE U.L. LABEL DOORS AND FRAMES PER APPLICABLE
<br /> SO SHALL PLACE FULL RESPONSIBILITY FOR ANY ERRORS STATE AND LOCAL BUILDING CODES, WHERE REQUIRED. TO MOISTURE TESTING TO BE REPORTED TO TENANT'S REPRESENTATIVE IZtr,f .,-""ft'
<br /> COVER ALL OF THE GENERAL AND SUBCONTRACTOR'S WORK. ALL DEFECTS 4. FABRICATE AND ERECT TRUE, PLUMB, AND SQUARE AS SPECIFIED AND DETAILED
<br /> 3. CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFICATION OF ALL SETBACKS, DISCOVERED DURING THIS GUARANTEE PERIOD SHALL BE REPAIRED TO THE IMMEDIATELY.1/8" X 12" X 12"VINYL RESILIENT TILES WITH 4" HIGH X 1/8"THICK, (-
<br /> AND/OR EASEMENTS, EXISTING UTILITIES, AND ANY UNDERGROUND OR SURFACE OWNER AND/OR TENANT'S SATISFACTION AT CONTRACTOR'S EXPENSE AT NO COST DIVISION IV MASONRY AND AS PER MANUFACTURER'S RECOMMENDATIONS.
<br /> STRUCTURE OR CONDITIONS PRIOR TO COMMENCING THE WORK. TO THE OWNER AND/OR TENANT. 5. AUTOMATIC SLIDING DOORS, ALUMINUM DOORS AND FRAMES WITH SIDELIGHTS, TOP-SET, STRAIGHT VINYL BASE (PRE FORMED CORNERS ARE REQUIRED). SEE H
<br /> -
<br /> TRANSOM AND ACTIVE DOOR LEAVES, OVERHEAD OPERATOR AND EMERGENCY FINISH SCHEDULE. CC
<br /> 4. UPON COMPLETION OF THE WORK, PROVIDE A WALL FRAME WITH CLEAR PLEXI J. A. NO WORK UNDER THIS SECTION UNLESS REQUIRED FOR PROPER CUTTING BREAKOUT PER APPLICABLE BUILDING CODES. 5. FILL ALL CRACKS, JOINTS, ETC., IN SUB-FLOOR WITH CRACK FILLER APPROVED �y�
<br /> SUPERVISION: AND REPAIR OF BUILDING SHELL. IN THIS EVENT ALL WORK SHALL BE 6. SEE DOOR SCHEDULE FOR SPECIFIC INFORMATION AND HARDWARE. BY FLOORING MANUFACTURER, U)
<br /> FACE OVER THE MANAGER'S DESK CONTAINING THE CERTIFICATE OF OCCUPANCY. 1. PROVIDE A FULL TIME, QUALIFIED SUPERVISOR ON THE JOB SITE. ANY WORK PERFORMED TO THE HIGHEST LEVELS OF QUALITY AND CRAFTSMANSHIP AND 6. INSTALL ALL MATERIALS WITH WEATHERPROOF TYPE ADHESIVES AS
<br /> REQUIRED TO BE COMPLETED DURING NON-BUSINESS HOURS SHALL BE SHALL BE COORDINATED WITH LANDLORD'S REPRESENTATIVE. RECOMMENDED BY FLOORING MANUFACTURER FOR MATERIALS AND SURFACE
<br /> LIU
<br /> 5. SECURE AND PAY FOR ALL PERMITS AND LICENSES NECESSARY FOR THE INCLUDED IN THE BID. INVOLVED.
<br /> EXECUTION OF THE DEFERRED SUBMITTAL ITEMS. 2. PROVIDE A JOB SITE TELEPHONE AND FAX MACHINE DURING THE DIVISION V METALS D
<br /> CONSTRUCTION PERIOD. NOTIFY TENANT'S REPRESENTATIVE IMMEDIATELY OF G. FIBERGLASS REINFORCED PANELS 1/8":
<br /> 0 0C
<br /> 6. SEE RESPONSIBILITY SCHEDULE TO CLARIFY RESPONSIBILITES FOR SPECIFIED WORK. TELEPHONE AND FAX NUMBERS. A. METAL STUDS
<br /> 3. COORDINATE AND SCHEDULE ALL NON-BUSINESS HOUR WORK WITH BUILDING DIVISION VII DOORS & WINDOWS {CONT.) 1. REFER TO RESPONSIBILITY SCHEDULE AND FINISH SCHEDULE. -
<br /> 1. 20 GA. MINIMUM AT NON-SALES WALLS, AT STOREFRONT OR WALLS WITH DECKS 2. PROVIDE AND INSTALL FIBERGLASS REINFORCED PANELS ON SURFACES AS I LU�-
<br /> SPECIFICATIONS MANAGER. ABOVE. SHOWN ON PLANS.
<br /> 0.
<br /> 2. 25 GA. MINIMUM, AT 16" O.C. MAXIMUM, AT TYPICAL PARTITIONS UNLESS B. ACCESS DOORS: " 3. INSTALL PER MANUFACTURER'S INSTRUCTIONS. -
<br /> 1. PROVIDE FLUSH TYPE METAL DOORS MIN 16" X 20, OR AS SPECIFIED ON THE
<br /> DIVISION I GENERAL REQUIREMENTS GENERAL CONDITIONS K0
<br /> 1. URTOTHERWISE NOTED. CC
<br /> REQUIREMENTS/GENERAL PROVIDE ALL TEMPORARY UTILITIES (INCLUDING, BUT NOT LIMITED TO, WATER, 3. CONTRACTOR SHALL PROVIDE ALL FASTENERS, SCREWS, BOLTS, CLIPS, DRAWINGS, MANUFACTURED FORM # 14 GA. STEEL, COMPLETE WITH FLUSH FLANGE H. WALK-OFF MAT: T.B.D. (ROLL-UP TYPE) (-
<br /> THE CONTRACTOR SHALL BE RESPONSIBLE FOR A COMPLETE AND OPERATIONAL SEWERAGE, ELECTRICAL POWER, FUEL AND TELEPHONES) AND THE COSTS ANCHORS, ANGLES, BRIDGES, BRACKETS, SLEEVES, ETC. AS REQUIRED. TYPE FRAMES MANUFACTURED FROM # 16 GA. STEEL, WITH ANCHORS.
<br /> a.
<br /> TENANT SPACE INCLUDING, BUT NOT LIMITED TO ALL FINISHES, MECHANICALASSOCIATED WITH THESE. PROVIDE TENANT'S REPRESENTATIVE WITH ALL UTILITY 2. INSTALL ACCESS DOORS WHERE NECESSARY TO PROVIDE ACCESS TO CONCEALED 0
<br /> ,
<br /> ELECTRICAL, PLUMBING, AND FIRE PROTECTION PER THE CONSTRUCTION DOCUMENTS. COMPANY NAMES, NUMBERS, CONTACTS AND ACCOUNT NUMBERS (TENANT WILL B. METAL STANDARDS VALVES, AND OTHER EQUIPMENT REQUIRING SERVICE OR INSPECTION AND AS I. PRECAST MASONRY UNITS: W
<br /> .11
<br /> TRANSFER ACCOUNTS TO THEIR NAME AT TURNOVER).AL 1. FURNISH AND INSTALL PER PLANS AND MANUFACTURER'S RECOMMENDATIONS. APPROVED BY THE TENANT'S PROJECT MANAGER. 1. REFER TO RESPONSIBILITY SCHEDULE AND FINISH SCHEDULE 7
<br /> A. COORDINATION: 3. ACCESS DOORS
<br /> R SHALL BE SUITABLE FOR INSTALLATION IN THE SPECIFIED WALL 2. WATER RESISTIVE BARRIER INSTALLED OVER METAL STUDS. 0
<br /> AND COMPLY C. STRUCTURAL STEEL, AND/OR HEAVY GAUGE METAL FRAMING AND CEILING MATERIALS. - 3. METAL LATH TO BE MINIMUM 2.5 lb GALVANIZED SELF FURRING EXPANDED
<br /> 1. OBTAIN A COPY OF THE TENANT CONTRACTOR GUIDELINES HANDBOOKL. TRASH REMOVAL: CC 0
<br /> WITH THE REQUIREMENTS. NOTE IN PARTICULAR THE INSURANCE REQUIREMENTS, 1. PROVIDE FOR DAILY REMOVAL OF ALL TRASH, RUBBISH AND SURPLUS 1. INSTALL FRAMING, CONNECTION PLATES, SCREWS, BOLTS, ETC. AS SHOWN IN 4. ACCESS DOORS LOCATED IN FIRE-RATED WALLS, FLOORS, CEILING FLOOR OR METAL LATH.
<br /> FIXTURING, AND MERCHANDISING OF PLANS AND DETAILS. CEILING-ROOF ASSEMBLIES SHALL BE UL FIRE RATED LISTED AND LABELED. 4. FASTENERS TO BE GALVANIZEDNAILS, STAPLES OR CONCRETE NAILS. W
<br /> UTILITY LOCATIONS, CONSTRUCTION PROCEDURES, TEMPORARY BARRICADE WALLS, MATERIALS RESULTING FROM CONSTRUCTION,
<br /> CONSTRUCTION MATERIAL STORAGE, HAUL OFF AND PERMIT INFORMATION. THE DEMISED PREMISES. D. PROTECTIVE CORNER GUARDS 5. FINISH TO MATCH ADJACENT SURFACES. 5. SCRATCH COAT 3/8"TO 3/4"THINK OVER LATH CC ILI
<br /> 2. COORDINATE WORK WITH WORK OF OTHER TRADES, THE LANDLORD'S FORCES, 1. PROVIDE AND INSTALL METAL CORNER GUARDS (2"x2"x42") AT ALL OUTSIDE 6. PROVIDE KEYED LOCK AT ALL PANELS IN COMMON AREAS. 6. PRECAST CAP INSTALLED WITH METAL SUPPORT BRACKETS WITH MINIMUM
<br /> OTHER TENANT CONTRACTORS, AND TENANT STORE OPERATIONS IN ORDER TO AVOID M. CLEAN UP AT TURNOVER: CORNERS OR AS SPECIFIED IN THE PLANS; SPACKLE AND SAND SMOOTH. C. STOREFRONT: CAPACITY OF 51bs/LIN FT. W 2 QC. PRECAST MATERIAL TO BE KEPT MINIMUM 2"ABOVE PAVING I 2 0
<br /> A
<br /> CONFLICTS AND EXPEDITE THE COMPLETION OF THE PROJECT. 1. PROVIDE A PROFESSIONAL CLEANING SERVICE FOR ALL AREAS OF THE STORE 1. FURNISH ALL NECESSARY MATERIALS, LABOR AND EQUIPMENT FOR THE
<br /> 3. FURNISHLABOR, MATERIALS, EQUIPMENT AND APPLIANCES NECESSARY TO , AT THE COMPLETION OF THE PROJECT AND BEFORE TURNING THE PROJECT OVER E. REVEALS COMPLETE INSTALLATION OF FRAMING AS SHOWN ON THE DRAWINGS AND SPECIFIED 8. PREPARE MORTAR PER MANUFACTURE'S RECOMMENDATIONS. ADD COLOR TO 0
<br /> COMPLETE THE INSTALLATION OF ALL ITEMS FURNISHED BY OTHERS. TO THE TENANT. WORK TO INCLUDE, BUT NOT BE LIMITED TO ALL CEILING 1. INSTALL METAL REVEALS; SIZE AND LENGTH AS INDICATED ON PLANS. PROVIDE HEREIN. COMPLIMENT PRECAST COLORS. U
<br /> SURFACES, FLOOR AND WALL SURFACES, BOTH INTERIOR AND EXTERIOR. THE BLOCKING OR BACKING AS REQUIRED TO SECURE IN PLACE. 2. ALL GLASS FRAMING SHALL BE SET IN CORRECT LOCATIONS AS SHOWN IN THE 9. APPLY MORTAR 1/2"TO 3/4"THICK OVER PREPARED SURFACE. I-
<br /> MERCHANDISING. FINISH PER PLANS. DETAILS AND SHALL BE LEVEL, SQUARE, PLUMB, AND IN ALIGNMENT WITH OTHER 10. INSTALL CORNER PIECES FIRST AND THEN FILL IN FIELD WITH FLAT PIECES. } 5
<br /> B. PROTECTION: STORE IS TO BE CLEAN AND READY FOR E 2. PAINT OR FINS
<br /> 1. ERECT A TEMPORARY BARRICADE AT THE STOREFRONT ONLY IF REQUIRED BY THE 2. STOREFRONT IS TO BE CLEAN OF ALL DUST, GLUE, GROUT, AND MISAPPLIED WORK IN ACCORDANCE WITH MANUFACTURER'S INSTALLATION INSTRUCTIONS AND Z
<br /> GUIDELINES.. PAINT. F. EXPANSION JOINTS APPROVED SHOP DRAWINGS. DIVISION X SPECIALTIES ...a �"� 4
<br /> 2. PROTECT THE PROPERTY OF ADJACENT TENANTS, COMMON AREAS, AND NEUTRAL 3. HVAC FILTERS TO BE CHANGED FOLLOWING THE CLEANING. 1. INSTALL PER PLANS AND MANUFACTURER'S RECOMMENDATIONS. 3. PROTECT STOREFRONT FROM DAMAGE BEFORE, DURING, AND AFTER
<br /> PIERS AT ALL TIMES. ANY DAMAGE THAT OCCURS AS A RESULT OF DEMOLITION 2. USG 093 FOR CEILINGS AND WALLS, AS MAY BE INDICATED IN THE DRAWINGS. A. LAVATORY FIXTURES: I.�
<br /> (OR CONSTRUCTION) IS TO BE REPAIRED TO LIKE NEW CONDITION. N. INSURANCE: INSTALLATION. 1. REFER TO MECHANICAL DRAWINGS. Z
<br /> 3. 100 OR 200 SERIES AS REQUIRED FOR APPLICATION (OPTIONAL 1" DEPTH) 0 �" � Y�
<br /> 0110E CC(0
<br /> 1. SECURE, PAY FOR AND MAINTAIN, DURING CONSTRUCTION, ALL OF THE WITH ELASTOMERIC FILLER TO MATCH FINISH AS MANUFACTURED BY CONSPEC DIVISION IX FINISHES
<br /> C. CONTRACT CONSIDERATIONS: INSURANCE POLICIES REQUIRED. WORK SHALL NOT COMMENCE UNTIL ALL SYSTEMS INC., 877-CONSPEC. B. LAVATORY ACCESSORIES:
<br /> INSURANCE HAS BEEN OBTAINED AND CERTIFICATES OF SUCH 1. REFER TO ARCHITECTURAL DRAWINGS. 0 Ci z<
<br /> 1. SCHEDULE RI VALUES INSURANCE
<br /> REQUIRED
<br /> a. SUBMIT A PRINTED SCHEDULE ON FORM INCLUDED WITH BID PROPOSAL. INSURANCE HAVE BEEN DELIVERED. LANDLORD MUST BE NAMED AS "ADDITIONAL G. SUSPENSION SYSTEM A. GYPSUM DRYWALL 2. INSTALL A WALL BLOCKING AS REQUIRED TO PROVIDE ADEQUATE SUPPORT.
<br /> • " 1. INSTALL ALL GYPSUM DRYWALL SYSTEMS COMPLETE WITH PARTITION FRAMING, 3. INSTALL ACCESSORIES OVER FINISHED WALL SURFACE. W >� �
<br /> b. INCLUDE A DIRECT PROPORTIONAL AMOUNT OF OVERHEAD AND PROFIT WITH EACH INSURED". CERTIFICATE OF INSURANCE SHALL COVER WORK PERFORMED BY 1. PROVIDE AND INSTALL UNISTRUT SPACE FRAME GRID SYSTEM PER CEILING SUSPENSION SYSTEMS, AND RELATED ACCESSORIES, PARTS, MATERIALS, W >o Z
<br /> LINE ITEM. CONTRACTOR, EACH SUBCONTRACTOR AND ALL MAJOR SUPPLIERS. MANUFACTURERS SPECIFICATIONS AS REQUIRED FOR LIGHTING, CEILING ETC. AS SHOWN ON DRAWINGS AND AS SPECIFIED. INSTALL ALL MATERIALS PER C. SIGNS/SIGNAGE: J � R.>
<br /> c. REVISE SCHEDULE TO LIST APPROVED CHANGE ORDERS, WITH EACH APPLICATION ACCESSORIES OR MECHANICAL SYSTEMS SUSPENSION. MANUFACTURER'S SPECIFICATIONS AND RECOMMENDATIONS. 1. REFER TO ELECTRICAL PLANS.
<br /> FOR PAYMENT. 0. INDEMNIFICATION: 2. SUPPORT FROM STRUCTURE WITH THREADED RODS AND NUTS AS REQUIRED OR 2. GYPSUM DRYWALL: U.S. GYPSUM 5/8"THICK FIRE CODE SHEETROCK (TYPE "X") 2. ALL TEMPORARY SIGNS AND BANNERS ARE PROVIDED BY OTHERS. INSTALL ALL
<br /> 1. TO THE FULLEST EXTENT PERMITTED BY LAW, INDEMNIFY AND HOLD HARMLESS DETAILED.2. PAYMENT AND WAIVER OF LIENS: THE LANDLORD, TENANT, AND ARCHITECT AND THEIR AGENTS AND EMPLOYEES 3. CONTACT UNISTRUT CORPORATION 800-468-9510. PANELS OF STANDARD QUALITY OR EQUAL. TEMPORARY SIGNS AND BANNERS PER OWNER'S DIRECTION. 0
<br /> a. PAYMENT APPLICATION FORMS: SUBMIT PER THE OWNER'S REPRESENTATIVE'S FROM AND AGAINST ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES, INCLUDING 3. FASTENERS: DRYWALL SCREWS OF PROPER SIZE AND TYPE. 3. STOREFRONT SIGN PROVIDED BY OTHERS.
<br /> REQUIREMENTS. BUT NOT LIMITED TO,
<br /> ATTORNEY'S FEES ARISING OUT OF OR RESULTING FROM DIVISION VI WOOD & PLASTICS C4. ACCESSORIES AND TRIM: U.S. GYPSUM BOARD OR GOLD BOND SYSTEM OF 4.OMPONENTS AND PERFORATED TAPE. ALL METAL TRIM SHALL BE PERFORATED COORDINATE INSTALLATION WITH TENANT'S VENDOR.
<br /> b. UTILIZE SCHEDULE OF VALUES FOR LISTING ITEMS IN APPLICATION FOR PAYMENT. THE PERFORMANCE OF THE WORK, PROVIDED THAT ANY SUCH CLAIM, DAMAGE, CLANGS ENCS FOR COMPOUND FINISH. W
<br /> C. ALL PAYMENTS FOR THIS PROJECT ARE TO BE ALLOCATED FOR THIS PROJECT LOSS OR EXPENSE IS ATTRIBUTABLE TO BODILY INJURY, SICKNESS, DISEASE OR A. CARPENTRY & BLOCKING: 5. PROVIDE A LEVEL 4 FINISH PRIOR TO THE APPLICATION OF THE FINAL FINISHES. W
<br /> ONLY FOR PAYMENTS TO SUB-CONTRACTORS, MATERIAL SUPPLIERS, AND AGENTS DEATH, OR TO INJURY OR TO DESTRUCTION OF TANGIBLE PROPERTY (OTHER 1. BEFORE USING WOOD FRAMING OR BLOCKING OF ANY TYPE, CONFIRM CODE -
<br /> AUTHORIZED BY SPECIFIC CONTRACTORS TO PERFORM WORK OR SUPPLY MATERIALS THAN THE WORK ITSELF) INCLUDING THE LOSS OF USE RESULTING THEREFROM. RESTRICTIONS. IF USE OF WOOD IS PERMITTED BY REQUIREMENTS, ADHERE TO REFER TO THE GYPSUM ASSOCIATION GUIDELINES FORA DESCRIPTION OF THE DIVISION XI EQUIPMENT
<br /> R FOLLOWING GUIDELINES: DESIRED LEVEL. AND
<br /> LJ
<br /> TO THIS PROJECT. SUBMIT PARTIAL WAIVERS OF LIENS INCLUDING SUBCONTRACTORS THE
<br /> AND MATERIAL SUPPLIERS. P. BACKGROUND COMPUTER-AIDED CONTRACT DESIGN DOCUMENTS: a. USE NEW LUMBER BEARING GRADE AND TRADEMARK OF ASSOCIATION UNDER A. RECEIVE AND INSTALL PER MANUFACTURER'S INSTRUCTION ALL EQUIPMENT
<br /> d. SUBMIT A UPDATED CONSTRUCTION PROGRESS SCHEDULE. 1. IN THE EVENT THAT THE GENERAL CONTRACTOR OR ANY SUBCONTRACTORS WHICH IT WAS PRODUCED. B1. CEILING SYSTEMS FIXTURES. 2
<br /> REQUIRE BACKGROUND DRAWINGS, COPIES OF THESE DRAWINGS MAY BE b. LAYOUT, CUT, FIT AND ERECT FRAMING FOR ROUGH AND FINISHED WORK. 1. FURNISH AND INSTALL CEILING SYSTEMS COMPLETE WITH SUSPENSION SYSTEM
<br /> 3. CHANGE PROCEDURES: PROVIDED SUBJECT TO THE FOLLOWING CONDITIONS: INSTALL BLOCKING, NAILERS, FURRING AND OTHER ROUGH AND FINISHED MATERIALS AND RELATED ACCESSORIES AS INDICATED ON DRAWINGS. B. AUDIO SYSTEM
<br /> "USE 2. ALL LIGHT GAUGE METAL FRAMING AND CEILING SUSPENSION COMPONENTS FOR 1. REFER TO ELECTRICAL PLANS. W
<br /> a. OWNER'S REPRESENTATIVE WILL ADVISE OF MINOR CHANGES IN THE WORK NOT a. A SEPARATE AGREEMENT TITLED OF COMPUTER-AIDED DESIGN AS REQUIRED. BRACE, PLUMB, AND LEVEL MEMBERS IN TRUE ALIGNMENT AND SOFFITS, GYPSUM BOARD AND LAY IN CEILINGS SHALL BE ANCHORED TO THE W
<br /> INVOLVING AN ADJUSTMENT TO CONTRACT SUM/PRICE OR CONTRACT TIME. DOCUMENTS" MUST BE SIGNED BY THE CONTRACTOR/SUBCONTRACTOR BEFORE RIGIDLY SECURE IN PLACE WITH SUFFICIENT NAILS, SPIKES, SCREWS AND BOLTS AS STRUCTURAL JOISTS AND BEAMS ONLY. PROVIDE AND INSTALL ANY ADDITIONAL 2 PROVIDED BY OTHERS. COORDINATE INSTALLATION WITH TENANT'S VENDOR.
<br /> CO
<br /> b. MAINTAIN DETAILED RECORDS OF WORK DONE ON TIME AND MATERIAL BASIS TO THE TRANSFER OF THE FILES. NECESSARY. FRAMING REQUIRED. H
<br /> SUBSTANTIATE COSTS FOR CHANGES IN THE WORK. b. CONTRACTOR MUST AGREE TO USE THE PROJECT FILES ONLY FOR THE c. FURNISH AND INSTALL ROUGH AND FINISHED PLYWOOD, FURRING SUPPORTS, 3. SUSPENSION SYSTEMS SHALL BE ADEQUATE TO SUPPORT LIGHTING FIXTURES, DIVISION XII FURNISHINGS
<br /> SUBMIT PER THE OWNER'S REPRESENTATIVE'SAS DESCRIBED IN THE AGREEMENT. CEILING GRILLES, DIFFUSERS, AND OTHER TYPICAL CEILING ACCESSORIES. 0
<br /> R. CHANGE ORDER FORMS: LIMITED. COPURPOSE d. FURNISH AND INSTALL ALL ROUGH HARDWARE, ANCHORS, BOLTS, ETC. AS Z
<br /> REQUIREMENTS. c. CONTRACTOR MUST AGREE TO REIMBURSE WJCA INC. OR THE TENANT FOR 4. PROVIDE SYSTEM COMPONENTS FROM SINGLE MANUFACTURER. A. REFER TO THE RESPONSIBILITY SCHEDULE.
<br /> CARPENTRY WORK.
<br /> d. EXECUTION OF CHANGE ORDERS: OWNER'S REPRESENTATIVE WILL ISSUE CHANGE THE USE OF THE DOCUMENTS PER THE AGREEMENT. CONTRACTOR MAY REQUIRED FOR 5. INSTALL CEILING AND SUSPENSION SYSTEMS IN STRICT ACCORDANCE WITH
<br /> W WOOD SHALL BE FIRE RETARDANT AND MUST BE
<br /> ORDERS FOR SIGNATURES OF PARTIES AS PROVIDED IN THE CONDITIONS OF THE REIMBURSE WJCA INC. DIRECTLY OR MAY AGREE TO CREDIT TENANT AN AMOUNT e.ALL EXISTING OR NEW MANUFACTURER'S RECOMMENDATIONS AND ALL APPLICABLE BUILDING CODE B. RECEIVE, ASSEMBLE AND PLACE OFFICE AND NON-SALES EQUIPMENT ANDCJ
<br /> CONTRACT. AGREED UPON WITH ARCHITECT&TENANT'S REPRESENTATIVE. IDENTIFIED WITH A UL LABEL CERTIFYING THIS CLASSIFICATION. REQUIREMENTS. FINISHED CEILING SHALL BE LEVEL, WITH JOINTS SNUG AND FIXTURES. REFER TO RESPONSIBILITY SCHEDULE. Q
<br /> e. SUBMIT A UPDATED CONSTRUCTION PROGRESS SCHEDULE. SQUARE, AND IN PERFECT CONDITION.
<br /> (TENANT FURNISHED MATERIALS): B. MILLWORK: 6. MATERIALS AND FINISHES: C. RECEIVE, ASSEMBLE AND PLACE/INSTALL ALL SALES AREA FIXTURES. I 0 >-
<br /> Q. DAMAGED FREIGHT ) 1. RECEIVE AND INSTALL ALL OWNER PROVIDED FINISHED MILLWORK, CABINETST a. REFER TO REFLECTED CEILING PLAN FOR SPECIFIED MATERIALS AND FINISHES. ®3
<br /> 4. ALTERNATIVES: 1. OPEN BOXES/CARTONS WITH OBVIOUS DAMAGE
<br /> a. ACCEPTED ALTERNATIVES WILL BE IDENTIFIED IN OWNER-CONTRACTOR AGREEMENT. 2. INSPECT FREIGHT BEFORE SIGNING THE FREIGHT BILL, NOTE SPECIFICALLY THE PANELING, DOORS AND FRAMES, ETC., AS SHOWN ON DRAWINGS OR AS DIREC ED. b. LEAVE ONE CASE OF CEILING TILES FOR LATER REPLACEMENT.
<br /> b. ALTERNATES MUST BE SUBMITTED WITH BID PROPOSAL, AS SEPARATE ADD OR 2. CUT, FIT, AND INSTALL ALL MILLWORK AND SET PLUM AND TRUE IN DIVISION XIII SPECIAL CONSTRUCTION LO
<br /> ITEM(S) DAMAGED. ACCORDANCE WITH ASSEMBLY/INSTALLATION DRAWINGS PROVIDED. PAINTING AND FINISHING0Z Lu"�
<br /> DEDUCT ITEMS. BASE BID SHALL INCLUDE ALL ITEMS AND MANUFACTURERS AS 3. AFTER THE DAMAGE IS NOTED ON THE FREIGHT BILL, HAVE CARRIER'S DRIVER 3. BACK CUT FLAT TRIM TO PREVENT WARPING. DRILL WHERE NECESSARY TO C. A. NO ANTICIPATED WORK UNDER THIS SECTION. CONFIRM WITH TENANT'S 0 Q
<br /> ENUMERATED ON DRAWINGS AND/ORAND SPECIFICATIONS. ALSO SIGN IN ORDER TO VERIFY THAT BOTH PARTIES AGREE TO THE EXTENT OF 1. PROVIDE A SATISFACTORY FINISH THROUGHOUT, UNLESS SPECIFICALLY STATED
<br /> WORK AS REQUIRED. PREVENT SPLITTING. OTHERWISE. REPRESENTATIVE. Q <2 co
<br /> c. COORDINATE RELATED WORK MODIFY SURROUNDINGTHE DAMAGE. 4. CONFIRM BLOCKING REQUIREMENTS WITH VENDORS PRIOR TO CLOSING UP ALL
<br /> WHEN DAMAGE IS DISCOVERED UPON UNPACKING THE FREIGT, INSPECT ALL ASSEMBLIES. 2. USE ONLY THE PAINT AND RELATED MATERIALS SPECIFIED. CLin'N
<br /> 4. 3. COVER ALL SURFACES THOROUGHLY. IF THE NUMBER OF COATS SPECIFIED DIVISION XIV CONVEYING SYSTEMS < JI L9.1 CD
<br /> 5. CLOSE OUT: PACKING FOR SIGNS OF DAMAGE OR ABUSE. THE FREIGHT BILL IS TO BE NOTED
<br /> a. THE FINAL TEN PERCENT RETENTION ON THIS PROJECT MUST INCLUDE SIGNED WITH THE SPECIFIED DAMAGE. DOES NOT ACCOMPLISH THE INTENT, THEN APPLY ADDITIONAL COATS OF SPECIFIED
<br /> WAIVERS OF LIEN INDICATING 100% COMPLETION AND 100% PAYMENTDIVISION VII THERMAL & MOISTURE PROTECTION MATERIAL TO GIVE SATISFACTORY COVERAGE. SEE FINISH SCHEDULE. TENANT'S w 3
<br /> AND FULLBYEXECUTED5. CONTACT THE TENANT'S REPRESENTATIVE WITHIN 48 HOURS OF TAKING
<br /> IN ALL SUB-CONTRACTORS AND MATERIAL SUPPLIERS. RECEIPT OF MATERIALS TO INFORM THEM OF ANY LOSS. FAX ALL REQUIRED 4. PREPARE BY CLEANING ALL SURFACES FREE OF LOOSE DIRT AND DUST. A. NO ANTICIPATED WORK UNDER THIS SECTION. CONFIRM WITHD M W
<br /> b. PROVIDE A LIST OF ALL SUBCONTRACTORS, INCLUDING ADDRESS AND PHONE A. VAPOR BARRIER: PREPARE ALL METAL SURFACES IN STRICT ACCORDANCE WITH MANUFACTURERS REPRESENTATIVE. H
<br /> NUMBERS INSTALLED IN A PICTURE FRAME ON BACK OF THE MANAGER'S OFFICE DOCUMENTATION TO TENANT'S REPRESENTATIVE. 1. PROVIDE AND INSTALL 6 MIL. POLYETHYLENE BELOW ALL REQUIRED PATCH WRITTEN SPECIFICATIONS.
<br /> TENANT'SPOLYETHYLENE AT WALLS THATRECEIVE ONE COAT LATEX PRIMER AND TWO COATS OF 0 w
<br /> CONDITIONS AND 4 MIL. DRYWALL TO
<br /> DOOR. 6. IF TENANT'S CONTRACTOR FAILS TO FOLLOW THIS PROCEDURE, AREAS AT SLAB ON GRADE GOND 10 5. PAINTED c. SUBMIT OPERATION MANUALS, MAINTENANCE INSTRUCTIONS, ETC. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL COSTS RELATED TO THE RECEIVE BATT INSULATION. SPECIFIED PAINT. TINT PRIMER TO APPROXIMATE SHADE OF THE FINAL COAT TO DIVISION XV MECHANICAL w Ir..
<br /> LU0
<br /> d. THE GENERAL CONTACTOR SHALL PROVIDE ASBUILT DRAWINGS TO THE OWNERS REPLACEMENT OF MISSING OR DAMAGED TENANT FURNISHED MATERIALS. PRODUCE AN EVEN RESULT IN THE FINISH COAT. DRY ALL COATS THOROUGHLY - CC
<br /> FOLLOW MANUFACTURER'SMECHANICAL DRAWINGS FOR SPECIFICATIONS. `"`F- LAY 43 WI ,
<br /> REPRESENATIVE THAT REFLECTS ALL CHANGES TO THE PROJECT DURRING THE CORSE B. ELASTOMERIC CRACK BRIDGING: BEFORE APPLYING SUCCEEDING COATS. A. REFER TO I
<br /> OF CONSTRUCTION AT THE COMPLETION OF PROJECT. DIVISION II SITE CONSTRUCTION 1. PROVIDE AND INSTALL ELASTOMERIC CRACK BRIDGING AS MANUFACTURED BY RECOMMENDATIONS FOR RE-COAT TIME.
<br /> NATIONAL APPLIED CONSTRUCTION PRODUCTS, INC. 800-633-4622 OR APPROVED 6. PUTTY ALL NAIL HOLES, COUNTER SUNK SCREWS, BOLTS, CRACKS, ETC. BEFORE 0
<br /> D. QUALITY OF WORK: A. VERIFY EXISTING CONDITIONS AND LOCATIONS OF UTILITES, ROOF DRAINS, EQUAL. APPLYING FINISH. DIVISION XVI ELECTRICAL U
<br /> 1. ALL WORK SHALL BE PERFORMED INA SAFE AND WORKMANLIKE MANNER IN HAVAC EQUIPMENT, ETC. PRIOR TO COMMENCING THE WORK. 7. SAND ALL WOOD SURFACES SMOOTH AND EVEN BEFORE APPLYING FINISH. Q
<br /> ACCORDANCE WITH ACCEPTED CONSTRUCTION STANDARDS AND O.S.H.A. REQUIREMENTS. C. BATT INSULATION: 8. BEFORE STARTING FINISH WORK, REMOVE HARDWARE, ACCESSORIES, PLATES, A. REFER TO ELECTRICAL DRAWINGS FOR SPECIFICATIONS.
<br /> ALL CONSTRUCTION SHALL BE IN STRICT ACCORDANCE WITH THE PLANS UNLESS A B. DEMOLITION: 1. PROVIDE AND INSTALL A MINIMUM OF R-13 FRICTION FIT (OR AS DICTATED BY LIGHTING FIXTURES AND SIMILAR ITEMS, OR PROVIDE AMPLE PROTECTION FOR SUCH Z
<br /> INIENEMEMEN
<br /> VARIANCE IS APPROVED BY THE TENANT AND ALL AUTHORITIES HAVING JURISDICTION. 1. SCOPE OF WORK - THIS PORTION OF THE WORK INCLUDES ALL LABOR, CODE), FULL BATT INSULATION AS MANUFACTURED BY OWENS-CORNING FIBERGLASS ITEMS.
<br /> 2. ALL EQUIPMENT AND MATERIALS UNDER THE CONTRACT ARE TO BE NEW UNLESS MATERIALS AND SERVICES NECESSARY FOR THE REASONABLY INCIDENTAL TO OR EQUAL AT ALL EXTERIOR WALLS AND WHERE INDICATED IN THE DRAWINGS. 9. PAINT ALL REGISTERS, LOUVERS, GRILLES, EMERGENCY LIGHTS, SPEAKERS, TRIM 0
<br /> OTHERWISE SPECIFIED IN THE PLANS. COMPLETE ALL DISMANTLING, DEMOLTION, AND SALVAGE AS SHOWN AND NOTED LIGHTS, EXPOSED PIPING, ACCESS DOORS, VENTS, FIRE EXTINGUISHER CABINETS, J
<br /> ON THE DRAWINGS AND SPECIFIED HEREIN. IN GENERAL, THE ITEMS TO BE D. WATERPROOF MEMBRANE: EQUIPMENT MOUNTING BOARDS, ETC. UNLESS FACTORY FINISHED. PAINT TO MATCH < Z
<br /> EE. CODE COMPLIANCE: PERFORMED UNDER THIS SECTION SHALL INCLUDE, BUT ARE NOT LIMITED TO: 1. PROVIDE AND INSTALL A (M) 30 MIL. (MIN.) WATERPROOF MEMBRANE. ADJACENT WORK UNLESS OTHERWISE NOTED OR DIRECTED.
<br /> 1. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO MAKE CERTAIN THAT ALL WORK REMOVAL OF ALL EXISTING ACOUSTICS AND GYPSUM WALL BOARD, CEILING AND 2. EXTEND A MINIMUM OF 6" UP VERTICAL SURFACES IN TOILET ROOMS OR AS 10. MAKE FINISH WORK UNIFORM OR APPROVED FINISH, SMOOTH, FREE OF RUNS, Q CO
<br /> IS IN COMPLIANCE WITH ALL CODES, ORDINANCES, AND REGULATIONS OF ALL FRAMES, LIGHT FIXTURES, FLOORING, DOORS AND WALLS, FURRED OUT COLUMN REQUIRED. SAGS, AND DEFECTIVE BRUSHING AND CLOGGING. MAKE EDGES OF PAINT CC W
<br /> CONSTITUTED PUBLIC AUTHORITIES HAVING JURISDICTION. THIS INCLUDES BUT IS NOT ENCLOSURES, AND STOREFRONT AND AS SPECIFIED ON THE DRAWINGS. ADJOINING OTHER MATERIALS OR COLORS SHARP AND CLEAN WITHOUT
<br /> W ° 0
<br /> LIMITED TO LOCAL BUILDING CODE REQUIREMENTS, FIRE DEPARTMENT REGULATIONS, 2. DISCONNECTION OF SERVICES: E. FIRESTOPPING: OVERLAPPING.
<br /> UTILITY COMPANY REQUIREMENTS, O.S.H.A., AND THE BEST TRADE PRACTICES. a. EXISTING SERVICES THAT WILL BE DISRUPTED BY CONSTRUCTION WORK SHALL 1. PROVIDE AND INSTALL UL TESTED FIRESTOPPING ASSEMBLIES AS ARE m
<br /> BE RE-ROUTED AS NECESSARY TO PROVIDE TEMPORARY CONTINUATION SERVICE. APPLICABLE FOR EACH CONDITION ENCOUNTERED. IN THE ABSENCE OF TESTED D. CARPET:
<br /> F. DIMENSIONS: b. DISCONNECTED SERVICES SHALL BE PLUGGED AND SEALED IN AN APPROVED ASSEMBLIES, PROVIDE FIRESTOPPING ASSEMBLIES AS RECOMMENDED BY THE 1. REFER TO RESPONSIBILITY SCHEDULE AND FINISH SCHEDULE. HL11 .-a.-
<br /> R MEASURED FROM FINISHED FACESTAFF ENGINEERS AND AS APPROVED BY 2. CARPET AND ADHESIVE SHOULD BE CONDITIONED ON SITE AT A TEMPERATURE _ 0 0)
<br /> 1. UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE MANNER FIRESTOPPING SYSTEM MANUFACTURER'S
<br /> TO FINISHED FACE OF MATERIALS, FACE OF STOREFRONT, OR LEASE LINE. c. SPRINKLER SHUT DOWN SHALL BE COORDINATED WITH THE BUILDING PRIOR AUTHORITIES HAVING JURISDICTION. OF NO LESS THAN 60 DEGREES. ALL SUBFLOORS MUST BE SMOOTH AND LEVEL, o' Z t w
<br /> 2. VERIFY ALL PROPOSED DIMENSIONS WITH FIELD CONDITIONS. ADVISE TENANT'S TO EXECUTION OF WORK. 2. PROVIDE FIRESTOPPING MATERIALS AND THICKNESS AS REQUIRED TO MAINTAIN FREE OF DIRT, WAX AND OLD ADHESIVES.
<br /> REPRESENTATIVE OF ANY DISCREPANCY BETWEEN THE DRAWINGS AND ACTUAL JOB 3. ABANDONED ELECTRICAL WIRING: THE FIRE RATINGS OF THE ASSEMBLIES INTO WHICH THE MATERIALS ARE INSTALLED. 3. PROVIDE PREMIUM MULTI PURPOSE 1000 ADHESIVE TO ASSURE FULL WARRANTY 0 Z 0 x
<br /> ENCOUNTERED IN THE PROGRESS OF THE ASSEMBLIES. PROTECTION IN ALL DIRECT GLUE APPLICATIONS. USE A MINIMUM OF 1/8 X 1/8 } a X Z LL
<br /> CONDITIONS BEFORE BEGINNING THE WORK. a. CONDUITS AND OTHER UTILITIES 3. STRICTLY MATCH UL TESTED ASSEMBL ES
<br /> 3. ALL ANGLES SHALL BE 90 OR 45 DEGREES UNLESS OTHERWISE NOTED IN THE DEMOLITION THAT ARE TO BE ABANDONED SHALL BE DISCONNECTED AND THE 4. INSTALL FIRESTOPPING WITHOUT GAPS AND VOIDS OF ANY KIND. X 1/8 INCH V NOTCHED TROWEL FOR APPLICATION. ONE GALLON WILL HANDLE d 0.Q
<br /> CONSTRUCTION DOCUMENTS. ENDS PLUGGED IN AN APPROVED MANNER. ANY ABANDONED UTILITIES 5. INSPECT FIRESTOPPING WORK AND REPAIR OR REPLACE WORK WHICH HAS BEEN 10-15 YARDS OF CARPET. A DRYING TIME OF 30-40 MINUTES IS CRITICAL 0 ao<re
<br /> co
<br /> INTERFERING WITH WORK UNDER THIS CONTRACT SHALL BE REMOVED ONLY TO DAMAGED, DISTURBED, OR REMOVED BEFORE FIRESTOPPING IS CONCEALED OR BEFORE PLACING THE CARPET INTO THE ADHESIVE.
<br /> EXTENT THAT THEY INTERFERE WITH NEW CONSTRUCTION. 4. PROVIDE AND INSTALL TRANSITION STRIPS. TRANSITION STRIPS MUST BE NEW 0 CO3in
<br /> to
<br /> G. SHOP DRAWINGS & SUBMITTALS: THE ENCLOSED.
<br /> 1. SUBMIT THE NUMBER OF OPAQUE REPRODUCTIONS WHICH CONTRACTOR REQUIRES, 6. PROVIDE ANCHORAGE ACCESSORIES AND OTHER COMPONENTS AS NEEDED TO MATERIALS AND MUST CONFORM TO ALL CODE REQUIREMENTS AND INDUSTRY N O
<br /> PLUS TWO COPIES, TO TENANT'S REPRESENTATIVE FOR APPROVAL. DIVISION III CONCRETE PROVIDE COMPLETE, EFFECTIVE FIRESTOPPPING SYSTEMS COMPLYING WITH UL QUALITY STANDARDS.
<br /> 2. SUBMITTALS MUST BE SCHEDULED SO AS NOT TO IMPEDE THE PROGRESS OF THE TESTED ASSEMBLIES. 5. COMPLETED INSTALLATION TO BE FREE OF STAINS OR SNAGS DUE TO Z CD FD- p a
<br /> WORK. A. PATCHING (WHEN REQUIRED) CONSTRUCTION WORK. Q W 0 Z
<br /> 3. MARK EACH COPY TO IDENTIFY APPLICABLE PRODUCTS, MODELS, OPTIONS, AND 1. INSTALL MINIMUM 3000 PSI CONCRETE FILLER AND PATCHING WHERE EXISTING F. FIRE CAULKING:
<br /> DATA. SUPPLEMENT MANUFACTURER'S STANDARD DATA TO PROVIDE SLAB HAS BEEN REMOVED FOR UNDER SLAB CONDUITS, PLUMBING, ETC. DOWELL 1. ALL SLEEVES, OPENINGS, ETC. THROUGH FIRE RATED WALLS AND FLOORS SHALL E. RESILIENT SHEET FLOORING: X
<br /> OTHER }
<br /> INFORMATION SPECIFIC TO THIS PROJECT. INTO EXISTING SLAB ON ALL SIDES WITH No. 4 AT 12" O.C. STAGGERED BE FIRE SEALED WITH CALCIUM SILICATE, SILICONE "RTV" FOAM, "3M" FIRE RATED 1. REFER TO RESPONSIBILITY SCHEDULE AND FINISH SCHEDULE
<br /> et
<br /> 4. INDICATE SPECIAL UTILITY AND ELECTRICAL CH ,
<br /> ARACTERISTICS UTILITY CONNECTION SEALANTS OR EQUAL. 2. ALL EDGE CONDITIONS AT TRANSITIONS TO BE FLOATED UP FOR SMOOTH EVEN H
<br /> REQUIREMENTS, AND LOCATION OF UTILITY OUTLETS FOR SERVICE FOR FUNCTIONAL B. CONCRETE SLAB TRANSITION.
<br /> cc .ric 2
<br /> EQUIPMENT AND APPLIANCES. 1. INSTALL MINIMUM 3000 PSI CONCRETE WITH 6" X 6" - W1.4 X W1.4 W.W.F. G. ACOUSTICAL INSULATION: 3. ALL SUBFLOORS TO BE MOISTURE TESTED AND RESULTS COMPARED TO W
<br /> 5. IDENTIFY VARIATIONS FROM CONTRACT DOCUMENTS AND PRODUCT OR SYSTEM AT MID LEVEL OVER 6 MIL. VAPOR BARRIER (AT SLAB ON GRADE CONDITIONS OR 1. PROVIDE AND INSTALL ASTM C665, UNPAGED, 0.32 K-VALUE, WIDTHS TO MANUFACTURERS RECOMMENDED INSTALLATION GUIDELINES. ANY PROBLEMS DUE
<br /> LIMITATIONS WHICH MAY AFFECT THE CONSTRUCTION PROGRESS. CL
<br /> ADHERE TO LOCAL CODE REQUIREMENTS). INSTALL CONTROL JOINTS AT COORDINATE WITH FRAMING FOR FRICTION FIL, THICKNESS SHOWN OR IF NOT TO MOISTURE TESTING TO BE REPORTED TO TENANT'S REPRESENTATIVE
<br /> 6. DIRECT ALL SUBMITTALS TO THE TENANT'S REPRESENTATIVE. MAXIMUM 200 SF. SHOWN, FILL CAVITY. IMMEDIATELY. 00
<br /> 4. RESILIENT SHEET FLOORING WITH INTEGRAL 4" HIGH, RADIUSED COVE BASE.
<br /> a
<br /> H SAMPLES: C. EXISTING SLAB CONDITION H. EXTERIOR INSULATION AND FINISH SYSTEM SEE FINISH SCHEDULE.
<br /> 1. SUBMIT THREE COPIES OF SAMPLE TO TENANT'S REPRESENTATIVE FOR APPROVAL 1. LANDLORD SHALL PROVIDE A REINFORCED CONCRETE FLOOR SLAB WHICH 1. PREPARE SUBSTRATES FOR APPLICATION ACCORDING TO MANUFACTURER'S 5. FILL ALL CRACKS, JOINTS, ETC., IN SUB-FLOOR WITH CRACK FILLER APPROVED
<br /> WHEN REQUIRED BY INDIVIDUAL SPECIFICATION SECTION. SHALL MEET THE FOLLOWING CRITERIA: (a) IT SHALL BE A MINIMUM 4"THICK RECOMMENDATIONS. BY FLOORING MANUFACTURER, W DRAWN
<br /> 2. INCLUDE IDENTIFICATION ON EACH SAMPLE WITH FULL PROJECT INFORMATION. THROUGHOUT AND SHALL PROVIDE ONE HUNDRED PSF LOAD BEARING CAPACITY 2. INSTALL FLASHING AND REVEALS AS INDICATED. 6. INSTALL ALL MATERIALS WITH WEATHERPROOF TYPE ADHESIVES AS I
<br /> MINIMUM; (b) IT SHALL BE LEVEL TO WITHIN 1/8 INCH TOLERANCE IN TEN FEET, 3. INSTALL FINISH SYSTEM OVER BACKING. RECOMMENDED
<br /> INVOLVED.
<br /> COMENDED BY FLOORING MANUFACTURER FOR MATERIALS AND SURFACE H
<br /> SMOOTH AND SEALED AND; (c) IT SHALL BE READY TO ACCEPT TENANTS CHECKED
<br /> FINISHES. W
<br /> U
<br /> Q DATE
<br /> PERMIT SET
<br /> 08-03-12
<br /> 0 SCALE
<br /> Z_
<br /> JOB NO:
<br /> Q
<br /> Er
<br /> 0
<br /> SHEET
<br /> W Specifications
<br /> W SRi
<br /> 1402 SE Everett Mall Way, B1208-010
<br />
|