Laserfiche WebLink
ABOSSEIN <br /> ENGINEERING <br /> L.L.0 <br /> MECHANICAL-ELECTRICAL <br /> CIVIL-LEED-STRUCTURAL <br /> PLUMBING SPECIFICATIONS - DIVISION 22 2.07 NO STRUCTURAL MEMBERS SHALL BE CUT WITHOUT THE APPROVAL OF THE ARCHITECT,AND FAZE PROTECTION <br /> ALL SUCH CUTTING SHALL BE DONE IN A MANNER DIRECTED BY HIM. 3.24 PIPING INSTALLATION:ARRANGE AND INSTALL PIPING APPROXIMATELY AS INDICATED, STRAIGHT, PLUMB AND AS <br /> DIRECT AS POSSIBLE. FORM RIGHT ANGLES OR PARALLEL LINES WITH BUILDING WALLS. PRIOR TO INSTALLATION, 2100 112TH AVE. NE <br /> PAff t00 GENERAL 2.08 PROVIDE WEATHERPROOF FLASHING AT ALL DUCT, PIPE, ETC., MECHANICAL PENETRATIONS CHECK MECHANICAL DRAWINGS,ARCHITECTURAL,STRUCTURAL,AND ELECTRICAL DRAWINGS FOR INTERFERENCES. BELLEVUE, WA 98004 <br /> 1.01 LOCAL CONDITIONS: VISIT AND INSPECT THE PREMISES TO ASCERTAIN THE EXISTING CONDITIONS BEFORE THROUGH THE BUILDING WALLS AND ROOF. FLASHING SHALL BE DESIGNED AND INSTALLED WHERE DEPARTURES FROM INDICATED ARRANGEMENTS ARE REQUIRED,VERIFY PROPOSED CHANGES WITH THE <br /> ARCHITECT/ENGINEER BEFORE PROCEEDING. <br /> COORDINATE WITH ALL TRADES SO THAT PIPES, CONDUITS, DUCTS, OFFICE: <br /> PER SMACNA AND SHALL BE GUARANTEED WEATHER PROOF FOR THE DURATION OF THE <br /> SUBMITTING A BID. NO EXTRA PAYMENT WILL BE ALLOWED FOR THE LACK OF KNOWLEDGE OF THESE (425) 462-9441 <br /> GUARANTEE. <br /> CONDITIONS. ETC.,WILL NOT INTERFERE WITH EACH OTHER. FAX: (425) 462-9451 <br /> 2.09 ALL INSULATION SHALL HAVE A COMPOSITE (INSULATION,JACKET OR FACING,AND ADHESIVE) 3.25 CUT PIPES ACCURATELY TO MEASUREMENT ESTABUSHED AT THE BUILDING,AND WORK INTO PLACE WITHOUT EMAIL: <br /> 1.02 CODES: STRICTLY COMPLY WITH ALL APPUCABLE LOCAL, STATE,AND FEDERAL CODES AND REGULATIONS. FIRE HAZARD RATING AS TESTED BY ASTM E-84, NFPA 255, OR UL 723, NOT TO EXCEED 25 SPRINGING OR FORCING. PROPERLY CLEAR ALL WINDOWS, DOOR AND OTHER OPENINGS. MAKE CHANGES IN DIRECTION CServiee@abossein.com <br /> FLAME SPREAD AND 50 SMOKE DEVELOPED. ACCESSORIES SUCH AS COATINGS,TAPES,AND WITH FITTINGS. WHERE CHANGES IN PIPE SIZES OCCUR, USE ONLY REDUCING FITTINGS. CAP AND/OR PLUG OPEN <br /> IMC - Mechanical Code ADHESIVES SHALL HAVE THE SAME COMPONENT RATINGS.ALL INSULATING MATERIALS OR THEIR ENDS OF PIPEUNES AND OTHER EQUIPMENT DURING INSTALLATION TO KEEP DIRT OR OTHER FOREIGN MATERIAL WEBSITE: <br /> UPC - Plumbing Code CONTAINERS SHALL HAVE A LABEL INDICATING COMPLIANCE WITH THE ABOVE RATING. OUT OF THE SYSTEM. INSTALL HORIZONTAL PIPING AS HIGH AS POSSIBLE WITHOUT SAGS OR HUMPS. KEEP www.abossein.com <br /> REFERENCE STANDARDS: NFPA D-255,A.S.T.M. E-84, UL-723,ASHRAE 90-75 AND THE PIPES CLOSE TO WALLS, PARTITIONS, CEIUNGS, OFFSET ONLY WHERE NECESSARY TO FOLLOW WALLS AS DIRECTED. <br /> 1.03 STANDARDS: THE FOLLOWING PUBUCATIONS (LATEST EDITION) FORM A PART OF THESE REQUIREMENTS TO STATE ENERGY CODE(IF APPLICABLE).ACCEPTABLE MANUFACTURERS: CERTAINTEED, OWENS- LOCATE GROUPS OF PIPES PARALLEL TO EACH OTHER. SPACE PIPING AT DISTANCES TO PERMIT APPLYING FULL <br /> THE EXTENT INDICATED BY THE REFERENCES THERETO: CORNING, KNAUF AND MANVILLE. <br /> INSULATION AND TO PERMIT ACCESS FOR SERVICING VALVES. <br /> NFPA PAMPHLET 54 NEPA PAMPHLET 90A 2.10 PIPE MATERIAL: 3.26 CONCEAL ALL PIPING IN BUILDING CONSTRUCTION OR UNDERGROUND IN FINISHED AREAS.THE PIPING INSTALLATION <br /> COLD WATER & HOT WATER COPPER "L"(ABOVE GROUND)(LEAD FREE) SHALL NOT CAUSE DELAY IN THE WORK OF OTHER TRADES.ALLOW AMPLE TIME FOR TESTS AND APPROVAL. <br /> 1.04 PLANS AND SPECIFICATIONS:THE PLUMBING DRAWINGS ARE DIAGRAMMATIC IN CHARACTER INTENDED TO COLD WATER & HOT WATER COPPER "K"(UNDERGROUND)(LEAD FREE) KEEP FIXTURE BRANCHES CONCEALED TO POINTS ABOVE FLOOR CLOSE TO FIXTURES. EXPOSED PIPE SHALL BE , ��, <br /> CONVEY THE SCOPE OF WORK AND INDICATE THE GENERAL ARRANGEMENT OF EQUIPMENT, PIPING, ETC.,AND WA AND VENT CAST IROoN DWV COPPER ABS. <br /> BLACK STEL MEETING ASTM A 53 REQUIREMENTS CHROME PLATED. INSTALL CHROMIUM PLATED WALL AND CEILING PLATES ON ALL PIPES PASSING THROUGH WALLS, ..y � <br /> APPROXIMATE SIZES AND LOCATIONS OF EQUIPMENT AND OUTLETS. DETERMINE THE EXACT LOCATION OF THE PARTITIONS,AND FLOORS WHEREVER PIPING IS EXPOSED IN FINISHED PARTS OF THE BUILDING. �fi`1/ <br /> ELEMENTS OF THE SYSTEM FROM THE STRUCTURE AND FROM THE EQUIPMENT, NOT FROM THE DRAWINGS. NOTE JOINTS AND METHOD OF CONNECTIONS SHALL BE PER THE 2009 UPC-CHAPTER #14,ASTM STANDARDS ,i-` `�.`,, <br /> AND MANUFACTURERS RECOMMENDATIONS FOR EACH PIPE TYPE AND APPLICATIONS. 3.27 PROVIDE UNIONS OR FLANGES TO ALLOW REMOVAL OF EACH PIECE TO EQUIPMENT OR CONTROL DEVICE. LOCATE <br /> DO NOT SCALE DRAWINGS FOR MEASUREMENTS NOR USE AS SHOP DRAWINGS. BETWEEN SHUT-OFF AND EQUIPMENT. <br /> 1.05 PROVIDE ALL ITEMS, EQUIPMENT, MATERIALS, OPERATIONS, OR METHODS LISTED, MENTIONED OR SCHEDULED 2.11 PIPE INSULATION: • <br /> ON THE DRAWINGS, AND/OR HEREIN INCLUDING ALL INCIDENTALS AND ACCESSORIES NECESSARY AND REQUIRED COLD WATER - 1/2" INSULATION WITH VAPOR BARRIER JACKETS. 3.28 LOCATE PIPE SUPPORT HANGERS SPACED ON STRAIGHT RUNS NOT TO EXCEED 6 FT. FOR SIZES UP TO 1-\" `L" _ai -4`'' <br /> FOR INSTALLATION OR MOUNTING, OR NORMALLY SUPPLIED BY COMMON PRACTICE WHETHER SPECIFICALLY HOT WATER -1/2" INSULATION WITH VAPOR BARRIER JACKETS. FOR RUNOUTS UP TO 12 AND NOT TO EXCEED 10 FT. FOR SIZES 2"AND LARGER. <br /> MENTIONED OR NOT, TO PROVIDE COMPLETE AND PROPERLY FUNCTIONING SYSTEMS. FEET AND 1" INSULATION FOR ALL PIPING UP TO 2" DIAMETER. <br /> UNDERGROUND PIPING WITH 1/2"CLOSED CELL FOAM INSULATION. 3.29 PROVIDE LINE SIZE VALVES WHERE INDICATED.VALVES IN HORIZONTAL LINES SHALL BE INSTALLED WITH STEMS <br /> 1.06 BRING ANY NON-COMPLIANCES WITH ALL APPUCABLE LOCAL, STATE AND FEDERAL CODES AND REGULATIONS, RAIN LEADER & OVERFLOW - 1/2" INSULATION WITH VAPOR BARRIER JACKETS. HORIZONTAL OR ABOVE THE LINE. ISOLATION VALVES SHALL BE INSTALLED IN WATER LINES CONNECTED TO EACH ...".m.. ..wM.AJTAat~ .s. <br /> PIECE OF EQUIPMENT AND AT ANY OTHER POINTS INDICATED. ••... a. .. .....". .. <br /> CONFLICTS AND DISCREPANCIES TO THE ENGINEER'S ATTENTION BEFORE SUBMITTING BID. A CORRECT, <br /> COMPLETE AND EASILY MAINTAINED SYSTEM IS INTENDED. PART 3.00 E)(ECU TOMB <br /> 3.30 JOINTS <br /> 3.01 PERMITS AND INSPECTIONS: APPLY AND PAY FOR ALL PERMITS AND CERTIFICATES OF INSPECTION REQUIRED TAPERED THREADS OF SCREW JOINTS SHALL BE PROPERLY CUT. SEAL SCREWS JOINTS WITH AN APPROVED cc) <br /> 1.07 THE CONTRACTOR'S BID WILL BE CONSTRUED AS AN AGREEMENT TO COMPLETE THE WORK WITHOUT ADDITIONAL FOR THE WORK,AND AT COMPLETION, PRESENT THE OWNER WITH THE SIGNED CERTIFICATES OF FINAL o <br /> COST TO THE OWNER. WHERE CONFLICTS BETWEEN PLANS AND SPECIFICATIONS OR CONFLICTING INFORMATION PIPE JOINT COMPOUND OR TAPE APPLIED TO THE PIPE THREADS AND NOT THE FITTING. CVINSPECTION. <br /> ON THE PLANS OCCURS,THE CONFLICTS SHALL BE REPORTED TO THE ARCHITECT PRIOR TO BIDDING. THE 3.31 CUT COPPER TUBING SQUARE AND REMOVE BURRS. CLEAN BOTH INSIDE OF FITTINGS AND OUTSIDE OF TUBING <br /> MORE COSTLY ALTERNATIVE SHALL BE INCLUDED IN THE BID PRICE. 3.02 UTILITIES: CHARGES BY UTILITY COMPANIES FOR PROVIDING SERVICES SHALL BE PAID BY OWNER AND WILLZ <br /> NOT BE A PART OF THIS CONTRACT. THE CONTRACTOR SHALL DO INSTALLATION WORK NORMALLY PROVIDED IN WITH STEEL WOOL BEFORE SWEATING. DO NOT ANNEAL FITTINGS AND TUBING WHEN MAKING CONNECTIONS. USE <br /> 1.08 MAKE NO CHANGES IN THE WORK SPECIFIED, UNLESS SUCH CHANGES ARE AUTHORIZED IN WRITING BY THE THIS CONTRACT. COMPOSITION LEAD FREE SOLDER FOR ALL JOINTS. w <br /> OWNER,ARCHITECT AND/OR ENGINEER. NO CHARGES FOR EXTRA WORK WILL BE PAID UNLESS SUCH EXTRA <br /> WORK HAS BEEN AUTHORIZED AND THE AUTHORIZATION CONTAINS A STATEMENT OF THE WORK TO BE 3.03 PLACE AND ARRANGE EQUIPMENT, PIPING, CONTROLS, ETC., TO FIT THE SPACE AVAILABLE. INCLUDING <br /> ACCOMPLISHED AND THE CHARGES TO BE MADE FOR THE WORK. ALL OFFSETS IN PIPING, ETC. REQUIRED. 3.32 FIXTURE INSTALLATION: PROVIDE ALL HANGERS NECESSARY TO PROPERLY SECURE FIXTURES TO THE TYPE OF R-+ 5 <br /> 3.04 THE ENGINEER'S CHECK SHALL BE GENERAL,AND DOES NOT RELIEVE THE CONTRACTOR OF FINAL CONSTRUCTION USED. COVER ALL FIXTURES WITH MANILLA PAPER. DO NOT REMOVE UNTIL COMPLETION OF THE 0 <br /> 1.09 THE INFORMATION PRESENTED ON THESE DRAWINGS IS DIAGRAMMATIC IN NATURE. IT DOES NOT RESPONSIBILITY OF COMPLIANCE TO THE INTENT OF THE PLANS AND SPECIFICATIONS. WORK. INSTALL SUCH GUARDS AND BOXING AS NECESSARY PROTECT FIXTURES AGAINST DAMAGE DURING a <br /> EA <br /> NECESSARILY REPRESENT ALL FITTINGS, HANGERS, ETC. REQUIRED FOR A COMPLETE WORKING CONSTRUCTION. PROVIDE STOPS ON THE SLIPPY PIPING TO EACH FIXTURE WHETHER SPECIFIED OR NOT. PROVIDE � <br /> UNIONS AT EACH FIXTURE TO PERMIT REMOVAL OF THE FIXTURE FOR REPAIR OR REPLACEMENT. ALL EQUIPMENT <br /> SYSTEM. PROVIDE ALL MATERIALS AND LABOR FOR COMPLETELY FINISHED AND OPERATIONAL <br /> 3.05 SUPERVISION AND WORKMANSHIP: QUALIFIED SUPERVISION FOR EACH TRADE SHALL BE IN CHARGE OF THE SHALL BE MOUNTED IN ACCORDANCE WITH MANUFACTURER'S ROUGH-IN MEASUREMENTS UNLESS OTHERWISE NOTED <br /> SYSTEMS. WORK AT ALL TIMES AND SHALL BE ON THE JOB SITE WHENEVER WORK IN THAT TRADE IS BEING ACCOMPLISHED. ON THE DRAWINGS. SEAL WATERTIGHT THE JUNCTURE OF A FIXTURE AND THE FLOOR OR WALL 1� w <br /> 1.10 REFER TO LATEST ARCHITECTURAL DRAWINGS FOR: EXACT WALL LOCATIONS, DIMENSIONS, AND 3.06 ALL WORK SHALL BE DONE IN A FIRST-CLASS MANNER BY WORKMEN SKILLED IN THE TRADE AFFECTED. <br /> A <br /> PLUMBING FIXTURE LOCATIONS AND REQUIREMENTS. 3.33 PROVIDE VACUUM BREAKERS AND BACK FLOW PREVENTORS AS NECESSARY TO AVOID WATER BEING DRAWN BACK W <br /> 1.11 CONTRACTOR SHALL NOTIFY THE ENGINEER OF ANY ALTERATIONS REQUIRED BY THE OWNER, 3.07 CLEANING PIPING & EQUIPMENT,TESTING: INTO THE WATER-SUPPLY PIPING. INSTALLATION SHALL BE IN FULL COMPLIANCE OF THE REQUIREMENTS OF THE P-4 P4 <br /> BUILDING DEPARTMENT AND THE LOCAL HEALTH DEPARTMENT. PROVIDE SHOCK ABSORBERS IN THE PIPING SYSTEM <br /> ARCHITECT, OR FIELD CONDITIONS. PLUG ALL NECESSARY OPENINGS OF THE ENTIRE DRAINAGE AND VENTING SYSTEM TO PERMIT THE COMPLETE AS NECESSARY TO PRECLUDE A WATER HAMMER PROBLEM WITH THE PIPING SYSTEM. <br /> SYSTEM OR PORTION THEREOF TO BE FILLED WITH WATER TO THE LEVEL OF THE HIGHEST VENT STACK ABOVE 0'4 <br /> 1.12 ALL EQUIPMENT SHALL BE NEW, SHALL COMPLY WITH SPECIFICATIONS ON DRAWINGS,AND THE ROOF ORA VERTICAL STACK MAY BE FILLED WITH WATER TOA HEIGHT OF 10 FT.ABOVE THE HIGHEST 3.34 PIPE INSULATION: INSULATE ALL HOT, COLD,AND RECIRCULATION PIPING,AS WELL AS ALL FITTINGS AND VALVES, a <br /> SHALL COMPLY WITH ENERGY CONSERVATION CODE REQUIREMENTS AS ADOPTED BY THE STATE, HORIZONTAL RUN TO BE TESTED.THE SYSTEM SHALL MAINTAIN THE WATER LEVEL WITHIN 1 IN. WHEN TESTED FOR WITH GLASS FIBER INSULATION. NOT REQUIRED FOR RUNOUTS TO FIXTURES, RISERS FEEDING FIXTURES, UNIONS 'Q+ <br /> AS WELL AS LOCAL JURISDICTIONAL BUILDING DEPARTMENT. SUBMIT DATA FOR APPROVAL 30 MINUTES. WHEN AN AIR TEST IS USED,APPLY A PRESSURE OF NOT LESS THAN 5 PSI WITH A FORCE PUMP FLANGES, STRAINERS, FLEXIBLE CONNECTIONS OR EXPANSION JOINTS.APPLY ON PIPING OVER CLEAN ND DRY' <br /> PRIOR TO ORDERING EQUIPMENT. SUBMITTAL SHALL INCLUDE ENERGY CODE COMPLIANCE CERT- E'♦ <br /> IFICATION. AND MAINTAIN AT LEAST 15 MINUTES WITHOUT LEAKAGE WHEN TESTED WITH A MERCURY COLUMN GAUGE. SURFACES WITH EDGES FIRMLY BUTTED TOGETHER. MAKE CONTINUOUS THROUGH SLEEVES OR OPENINGS IN WALL <br /> 3.08 CLEAN ALL EQUIPMENT, PIPE, VALVES AND FITTINGS OF GREASE, METAL CUTTINGS, DIRT AND SLUDGE THAT MAY AND FLOORS. FINISH INSULATION NEATLY AT HANGERS AND SUPPORTS. FOR FITTINGS, PROVIDE ONE COAT CEMENT, A <br /> 1.13 THE CONTRACTOR SHALL REFER TO ALL OTHER DRAWINGS, INCLUDING:ARCHITECTURAL, STRUCTURAL, HAVE ACCUMULATED BY OPERATION OF THE SYSTEM FOR TESTING. REPAIR ANY STOPPAGE OR DAMAGE TO PARTS PRE-MOLDED GLASS FIBER FITTING COVER AND FINISH WITH GLASS FABRIC EMBEDDED IN FIRE RETARDANT MASTIC. W Z <br /> MECHANICAL, ELECTRICAL,AND FOOD SERVICE, FOR ALL COORDINATION AND REFERENCE DATA. OF THE BUILDING,TO ITS FINISH OR FURNISHINGS DUE TO THE CONTRACTORS FAILURE TO PROPERLY CLEAN THE 3.35 KITCHEN EQUIPMENT CONNECTION REQUIREMENTS: <br /> COORDINATE INSTALLATION WITH WORK OF OTHER TRADES. PIPING SYSTEM WITHOUT COST TO THE OWNER.ADJUST THE HOT WATER SYSTEM FOR UNIFORM FLOW. ADJUST PLUMBING CONTRACTOR SHALL PROVIDE ALL ROUGH-IN AND FINAL CONNECTIONS FOR ALL FOOD AND BEVERAGE <br /> FLUSH VALVES AND OTHER PARTS OF THE SYSTEM FOR QUIET OPERATION.AFTER CLEANING THE POTABLE WATER SERVICE EQUIPMENT. <br /> 1.14 DURING BID PERIOD: INVESTIGATE AND VERIFY EXISTING CONDITIONS, EXACT LOCATIONS, ELEVATIONS, SYSTEM, OR PART THEROF, FILL WITH A SOLUTION CONTAINING 50 PARTS PER MILLION OF AVAILABLE CHLORINE AND <br /> AND CHARACTERISTICS OF EXISTING UTIUTIES AND PIPING. BRING ANY DISCREPANCIES TO ATTENTION ALLOW TO STAND FOR SIX (6) HOURS BEFORE FLUSHING. [-+ Z <br /> OF ARCHITECT AS SOON AS POSSIBLE. 3.36 PLUMBING CONTRACTOR SHALL ALLOW FOR INSTALLATION OF VALVES, FITTINGS,TRAPS,AND CONTROLS REQUIRED a .41 <br /> BETWEEN STUB-OUT POINT AND POINT-OF-CONNECTION ON THE EQUIPMENT. <br /> 3.09 COMPLETION: OPERATE ALL PLUMBING SYSTEMS, INCLUDING ALL EQUIPMENT FURNISHED UNDER THIS DIVISION Z <br /> 1.15 REVIEW ELECTRICAL LAYOUT, ROUTING OF UNDERGROUND ELECTRICAL UTILITIES INCLUDING POWER TO PROVE THAT ALL COMPONENTS ARE PROPERLY OPERATING AND THAT THE COMPLETE INSTALLATION IS 3.37 PLUMBING CONTRACTOR SHALL FURNISH AND INSTALL ALL SUPPLIES AND STOPS,TRAPS,VALVES, CONTROLS,AND W <br /> AND TELEPHONE, NEW AND EXISTING UNDERGROUND ELECTRICAL CONDUIT UNES, PRIOR TO START OF FUNCTIONING SMOOTHLY AND NOISELESSLY TO THE FULL EXTENT OF PLANS AND SPECIFICATIONS.ANY OTHER ACCESSORIES THAT ARE NOT AN INTEGRAL PART OF THE KITCHEN EQUIPMENT AS REQUIRED TO MAKE [-4 <br /> WORK. REBALANCING, READJUSTING OF SYSTEM ELEMENTS FOUND NECESSARY WHEN THE SYSTEMS ARE SUBJECT TO FINAL CONNECTIONS TO THE EQUIPMENT FOR A COMPLETE AND OPERATING SYSTEM IN COMPLIANCE WITH ALL <br /> ACTUAL OPERATING CONDITIONS SHALL BE DONE BY THE CONTRACTOR AT NO EXTRA COST TO THE OWNER. APPLICABLE CODES AND ORDINANCES. W <br /> 1.16 CONSULT WITH ALL TRADES AND DETERMINE EXTENT OF PLUMBING WORK DURING BID PERIOD. EXTEND <br /> ALL SERVICES TO LOCATIONS DESIGNATED AND REQUIRED, FURNISH ALL MATERIALS, AND PAY ALL 3.10 OPERATING INSTRUCTIONS: 3.38 ALL INDIRECT DRAIN LINES FROM FOOD SERVICE EQUIPMENT TO THE NEAREST INDIRECT DRAIN SHALL BE FURNISHED H <br /> COSTS NOT FURNISHED BY OTHERS. AND INSTALLED BY THE PLUMBING CONTRACTOR TO CONFORM WITH ALL APPLICABLE CODES AND ORDINANCES. H <br /> PROVIDE TYPEWRITTEN OPERATING INSTRUCTIONS IN THE BROCHURE COVERING EACH PIECE OF PLUMBING VERIFY ROUTING OF DRAIN LINES WITH FOOD SERVICE EQUIPMENT CONTRACTOR. PLUMBING CONTRACTOR SHALL <br /> 1.17 IT IS THE INTENT OF THESE SPECIFICATIONS TO PROVIDE A MECHANICAL SYSTEM COMPLETE, EQUIPMENT, GIVE NORMAL STARTING AND STOPPING PROCEDURES,ALONG WITH PROPER PARTIES TO CONTACT IN INSULATE DRAINS SERVICE FREEZER, ICE BINS, ETC. E.II4 ,P4 <br /> FULLY ADJUSTED,AND READY FOR OWNER'S BENEFICIAL USE. THE EVENT OF EMERGENCY, FAILURE OF EQUIPMENT. OUTLINE OF INSTRUCTIONS AS FOLLOWS: <br /> 1.18 IT IS THE INTENTION OF THESE SPECIFICATIONS AND DRAWINGS TO CALL FOR FINISHED WORK, 3.39 NO KITCHEN FAUCETS WILL BE SUPPLIED UNDER PLUMBING SECTION OF WORK EXCEPT AS SCHEDULED ON THE <br /> 3.11 AS-BUILT DRAWINGS: SUBMIT AS-BUILT DRAWINGS AT COMPLETION OF WORK. PLUMBING DRAWINGS. <br /> TESTED,AND READY FOR OPERATION.WHEREVER THE WORD "PROVIDE" IS USED, IT SHALL MEAN 3.40 CAREFULLY REVIEW ALL PLUMBING AND FOOD SERVICE DRAWINGS WITH REFERENCE TO KITCHEN EQUIPMENT FOR o <br /> "FURNISH AND INSTALL COMPLETE AND READY TO USE." MINOR DETAILS NOT USUALLY SHOWN 3.12 GUARANTEE: THE PLUMBING SYSTEM SHALL BE LEFT IN PROPER WORKING ORDER. REPLACE ANY WORK, Lo <br /> MATERIAL OR EQUIPMENT PROVIDED UNDER THIS CONTRACT WHICH DEVELOPS DEFECTS WITHIN ONE (1)YEAR INSTRUCTIONS REGARDING THE INSTALLATION OF PLUMBING SERVICES. REVIEW PLUMBING CONTRACTOR RESPON- <br /> OR SPECIFIED, BUT NECESSARY FOR THE PROPER INSTALLATION AND OPERATION, SHALL BE FROM DATE OF SUBSTANTIAL COMPLETION WITHOUT ADDITIONAL CHARGES. A NEW ONE (1)YEAR GUARANTEE SIBILITIES. MAKE ALL REQUIRED CONNECTIONS AND COORDINATE WITH KITCHEN EQUIPMENT SUPPLIER WHERE APPLICABLE. <br /> INCLUDED IN THE WORK,THE SAME AS IF HEREIN SPECIFIED OR SHOWN. ON THE AFFECTED ITEM OR ITEMS SHALL BE PROVIDED COMMENCING ON THE DATE OF THE APPROVED REPAIR REVIEW THIS PORTION OF THE PLUMBING INSTALLATION WITH THE GENERAL CONTRACTOR AND OWNER'S REPRESENTATIVE "' "�`"""`� "�"1.19 THE CONTRACTOR SHALL GIVE ALL NECESSARY NOTICES, OBTAIN ALL PERMITS AND PAY ALL OR REPLACEMENT. PRIOR TO COMMENCEMENT OF WORK. "''''' "�`"`""'""""°"°°" <br /> GOVERNMENT SALES TAXES, FEES AND OTHER COSTS, INCLUDING UTILITY CONNECTIONS OR 3.13 CUTTING AND PATCHING: CAREFULLY PERFORM ALL WORK WHERE CUTTING, CHANNELING, CHASING, OR 3.41 PLUMBING CONTRACTOR SHALL PROVIDE SHUT-OFF VALVES AT ALL WATER AND GAS CONNECTIONS TO KITCHEN <br /> EXTENSIONS, IN CONNECTION WITH HIS WORK; FILE ALL NECESSARY PLANS, PREPARE ALL DRILLING OF FLOORS,WALLS, PARTITIONS, CEILINGS OR OTHER SURFACES IS NECESSARY FOR PROPER EQUIPMENT. <br /> DOCUMENTS AND OBTAIN ALL NECESSARY APPROVALS OF ALL GOVERNMENTAL DEPARTMENTS INSTALLATION OR SUPPORT OF PIPING, OR OTHER PLUMBING EQUIPMENT. <br /> HAVING JURISDICTION; OBTAIN ALL REQUIRED CERTIFICATES OF INSPECTION OF HIS WORK AND 3.42 PRIOR TO ROUGH-IN OF ANY FIXTURE OR EQUIPMENT, REVIEW ALL CURRENT ARCHITECTURAL, MECHANICAL, AND <br /> DELIVER SAME TO THE ARCHITECT BEFORE REQUEST FOR ACCEPTANCE AND FINAL PAYMENT 3.14 ANY DAMAGE TO BUILDING, PIPING, EQUIPMENT, PLASTER,WOODWORK OR METAL WORK SHALL BE REPAIRED BY KITCHEN WHERE APPLICABLE EQUIPMENT DRAWINGS, EQUIPMENT/FIXTURE ROUGH-IN DRAWINGS AND DATA SHEETS <br /> FOR WORK. SKILLED MECHANICS OF TRADES INVOLVED,AT NO ADDITIONAL COST TO THE OWNER. AND CONFER WITH ARCHITECT, MECHANICAL CONTRACTOR,AND KITCHEN EQUIPMENT CONTRACTOR FOR INSTRUCTIONS <br /> 1.20 THE CONTRACTOR SHALL INCLUDE IN THE WORK,WITHOUT EXTRA COST TO THE OWNER, ANY AND CLARIFICATIONS. <br /> LABOR, MATERIALS, SERVICES,APPARATUS, DRAWINGS, IN ORDER TO COMPLY WITH ALL 3.15 DO NOT CUT, CHANNEL, CHASE OR DRILL MASONRY OR TILE; OR CUT, DRILL OR WELD STRUCTURAL MEMBERS 2.43 ALL VENT LINES SHALL BE SLOPED AWAY FROM CONNECTIONS TO STACK AND TOWARD THE <br /> APPLICABLE LAWS, ORDINANCES, RULES AND REGULATIONS,WHETHER OR NOT SHOWN ON OF THE BUILDING, ETC.,WITHOUT FIRST OBTAINING ARCHITECT'S PERMISSION, IF PERMISSION IS GRANTED, FIXTURE IN ORDER TO PREVENT THE ENTRAPMENT OF FLUIDS IN THE VENT LINE. <br /> DRAWINGS AND/OR SPECIFIED. PERFORM THIS WORK INA MANNER APPROVED BY THE ARCHITECT. <br /> 3,44 ALL DRAINAGE LINES SHALL BE SLOPED AT A MINIMUM OF 1/4 IN. PER LINEAL FOOT UNLESS <br /> PANT 2.00 PRODUCTS 3.16 CAULKING &WATERPROOFING: CAULK AROUND ALL PIPES, ETC. TO PREVENT AIR AND MOISTURE LEAKAGE OTHERWISE SHOWN OR NOT ALLOWED DUE TO FIELD CONDITIONS. DO <br /> 2.01 MATERIALS AND EQUIPMENT SUBSTITUTIONS: WITH COMPOUND APPROVED BY ARCHITECT/ENGINEER. 3.45 PIPE SUPPORTS SHALL BE ADJUSTABLE BAND HANGERS WITH ZINC ELECTROPLATING FOR STEEL Z <br /> THE BID PRICE SHALL BE BASED ON THE MATERIALS, EQUIPMENT AND/OR SERVICES AS SCHEDULED ON THE 3.17 PROVIDE FLASHINGS WHERE ALL PIPES PIERCE OUTSIDE WALLS OR ROOF AS NECESSARY TO PREVENT PIPE AND COPPER ELECTROPLATING FOR COPPER TUBE. SUPPORT PIPING FROM HANGERS WITH SUP- C7 <br /> DRAWINGS AND/OR SPECIFIED HEREIN,AND/OR AS ACCEPTED PRIOR TO BIDDING. MOISTURE ENTRY. PORTING RODS. UPPER ATTACHMENTS SHALL BE AS RECOMMENDED BY MANUFACTURER FOR SECURING <br /> TO EXISTING STRUCTURE. SUPPORT VERTICAL PIPES WITH APPROVED BRACKETS OR CLAMPS. ROD <br /> 2.02 ACCEPTANCE OF ALTERNATE OR SUBSTITUTE EQUIPMENT IN NO WAY VOIDS MATERIAL OR PERFORMANCE DIAMETERS PER APPLICABLE CODE. SUPPORT GAS PIPING AT 8ft. INTERVALS WITH HANGERS AND 'Q+ <br /> REQUIREMENTS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PERFORMANCE OF ANY MATERIAL OR 3.18 INSERTS, SLEEVES & BLACKOUTS: FURNISH AND INSTALL, PRIOR TO CONCRETE POURING OR OTHER SOLID RODS AT EACH HANGER.ALL PIPE HANGERS SHALL BE INSTALLED TO CONFORM TO LOCAL <br /> CONSTRUCTION, INSERTS SLEEVES OR BLACKOUTS IN WALLS FLOOR SLABS ROOFS AND PARTITIONS FOR <br /> EQUIPMENT SUBSTITUTED FOR SPECIFIED ITEMS ACCEPTED BY THE ARCHITECT AND/OR ENGINEER BEFORE OR PASSAGE OF ALL WORK INSTALLED UNDER THIS DIVISION. SEIEMIC REQUIREMENTS. INSULATED PIPING SHALL HAVE INSULATION SHIELD. <br /> AFTER THE BID DATE. CONTRACTOR SHALL BE RESPONSIBLE FOR INCORPORATING ANY SUBSTITUTE EQUIPMENT 3.46 THIS CONTRACTOR SHALL PROVIDE PLUMBING EQUIPMENT, FITTINGS,AND TRIM WHERE SPECIFIED r--� <br /> IN THE SYSTEM DESIGN. OR AS REQUIRED FOR COMPLETE INSTALLATION.THIS CONTRACTOR SHALL ROUGH-IN AND CONNECT <br /> 3.19 PROVIDE GALVANIZED IRON AND STEEL PIPE SLEEVES FOR IRON PIPES. USE COPPER SLEEVES FOR COPPER <br /> 2.03 CONTRACTOR SHALL PAY FOR ALL EXTRA COSTS BY ANY TRADE FOR CHANGES NECESSITATED BY MATERIAL OR PIPES. PROVIDE WOOD OR STEEL BLOCKOUTS FOR LARGE OPENINGS. SECURE ALL SUCH ITEMS FIRMLY IN ALL EQUIPMENT INCLUDING EQUIPMENT FURNISHED BY OTHERS. w <br /> EQUIPMENT SUBSTITUTIONS REGARDLESS OF ACCEPTANCE WITHOUT FURTHER COST TO THE CLIENT. POSITION. 3.47 SOIL WASTE,AND VENT SYSTEMS SHALL BE TESTED AT 10 ft. STATIC HEAD 30 min. WITH NO P <br /> 2.04 DOMESTIC WATER PIPING ABOVE GROUND SHALL BE TYPE "L" HARD DRAWN COPPER WITH.WROUGHT COPPER FITTINGS 3.20 TRENCHING AND BACKFILLING: PERFORM ALL TRENCHING AND BACKFILLING REQUIRED BY WORK PERFORMED DROP. POTABLE WATER PIPES,VALVFO,AND FITTINGS <br /> 30 min.WITTH NO DROP IN PRESSURE. <br /> SHALL BE DISINFECTED,AND HYDRO- CID <br /> STATICALLY TESTED AT 100 p.s.i.g.FO <br /> OR PEX.JOINTS AND CONNECTIONS SHALL BE COMPLETED WITH 95 PER- CENT TIN, 5 PERCENT ANTIMONY OR PEX UNDER THIS DIVISION. TRENCHING AND BACKFILLING DONE IN ACCORDANCE WITH "EXCAVATING AND GRADING" <br /> JOINTS.WATER PIPING BELOW GROUND SHALL BE TYPE "K", NON-METAUC PVC "GOLD" (OR EQUAL) MAY BE USED SPECIFICATIONS AND AS HEREIN SPECIFIED.TRENCHES SHALL BE EXCAVATED TO THE DEPTH REQUIRED FOR 3.48 ALL COLD AND HOT WATER SUPPLY LINES SHALL BE RUN CONCEALED ABOVE CEILING AND/OR <br /> IN-LIEU OF COPPER PIPING IF ITEMIZED AS A"DEDUCT" IN BID AND SUBMITTED FOR THE OWNER'S CONSIDERATIONS. THE UTILITIES INVOLVED.THE TRENCH BOTTOM SHALL BE FREE FROM STONES OR SOFT SPOTS. CONCEALED IN WALLS UNLESS OTHERWISE NOTED. INSTALL ON BUILDING SIDE OF INSULATION <br /> AND PROVIDE HEAT TAPE WHERE NECESSARY TO KEEP LINES FROM FREEZING. <br /> 3.21 BACKFILLING PIPING TRENCHES AS SOON AS PIPING IS TESTED AND APPROVED BY THE ARCHITECT AND 3.49 PIPING SHOWN ON THE DRAWINGS IS DIAGRAMMATICAL AND SHALL BE COORDINATED WITH ACTUAL <br /> 2.05 WASTE AND VENT PIPING SHALL BE SERVICE WEIGHT CAST IRON SOIL PIPE WITH NO HUB FITTINGS. PVC OR APPROVED BUILDING INSPECTOR. BACKFILL FOR A DEPTH OF 12 IN. OVER THE TOP OF THE PIPING WITH SAND, OR CLEAN JOB CONDITIONS,WORK OF OTHER TRADES, HEALTH DEPARTMENT, BUILDING DEPARTMENT INSPECTION <br /> ABS NON-METALIC PIPING SHALL BE IN ACCORDANCE WITH THE INTERNATIONAL PLUMBING CODE.ALTERNATES SHALL EARTH OF SPECIFIED BACKFILL MATERIAL UNIFORMLY PLACE AND TAMP BACKFILL BY APPROPRIATE METHODS AUTHORITIES. NO ADDITIONAL COST WILL BE ALLOWED FOR RELOCATION DUE TO CONFLICTS WITH F' <br /> BE SUBMITTED TO OWNER AND APPROVED BY THE BUILDING DEPARTMENT PRIOR TO START OF WORK. NON-METAUC TO ENSURE PROPER ALIGNMENT OF PIPING TO AVOID INJURY TO THE INSTALLED MATERIALS. OTHER TRADES OR LOCAL CODE REQUIREMENTS. E <br /> PIPING MAY BE USED FOR UNDERGROUND HOWEVER ABOVE GROUND PIPING (AND PROPERLY FIRE STOPPED)WHERE <br /> APPROVED BY LOCAL JURISDICTION SHALL BE ITEMIZED "DEDUCT"IN BID FOR OWNER'S CONSIDERATIONS. 3.22 GRADE THE BOTTOM OF TRENCHES TO SECURE THE REQUIRED FALL WITH A UNIFORM PITCH AND ADEQUATE 3.50 PLUMBING CONTRACTOR SHALL VERIFY EXACT LOCATION AND DEPTH OF ALL UNDERGROUND <br /> WIDTH TO ENSURE PROPER INSTALLATION OF PIPING. REMOVE DIRT UNDER CAST IRON HUBS SO THAT THE UTILITIES AND SHALL BE RESPONSIBLE FOR DAMAGE TO ANY PUBLIC OR PRIVATE UTILITIES, Revisions: Date: <br /> 2.06 INSULATE ALL PIPING,VALVES,AND FITTINGS FOR DOMESTIC COLD, HOT AND RECIRC. LINES WITH ENTIRE PIPE BARREL RESTS ON FIRM EARTH. BRING OVER-EXCAVATED OR INADEQUATELY COMPACTED GROUND WHETHER SHOWN OR NOT HEREON. REVIEW ENTIRE INSTALLATION WITH FRESH CHOICE REPRESEN- <br /> (1/2"CW, 1" HW & RECIRC) PRE-FORMED FIBERGLASS INSULATION WITH "K"FACTOR OF 0.30 MAXIMUM TO THE PROPER LEVEL WITH GRAVEL. TATIVE PRIOR TO START OF WORK. PERMIT SET 8/3/12 <br /> AT 200 deg. F. MEAN TEMPERATURE. PROVIDE ALL SERVICE, SELF LAP JACKET,AND VAPOR BARRIER. <br /> INSULATE CONDENSATE DRAINS WA"ARMAFLEX #22 OR "JM"AEROTUBE INSULATION. PROVIDE 3.23 ACCESS DOORS AND PANELS: FURNISH AND INSTALL ACCESS DOORS OR PANELS AS SHOWN ON THE DRAWINGS Q <br /> ADDITIONAL INSULATION IN AREAS SUBJECT TO FREEZING. SEE SPECIFICATION FOR TRACED-UNE AND/OR AS REQUIRED FOR PROPER ACCESS TO ALL CONCEALED EXPANSION JOINTS,VALVES, ETC. IF ACCESS <br /> INSULATION. DOOR OR SIZE IS NOT SHOWN, PROVIDE A SIZE APPROPRIATE TO THE CONDITIONS, BUT IN NO CASE LESSZS, <br /> THAN 12 IN. X 12 IN. <br /> A <br /> Job No.:212080 I <br /> Date: <br /> 1 <br /> P3.0 <br /> (3 OF 3) 1 <br /> 1402 SE Everett Mall Vijay, B1208-010 <br />