My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019/10/23 Council Agenda Packet
>
Council Agenda Packets
>
2019
>
2019/10/23 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2019 9:22:37 AM
Creation date
10/24/2019 9:20:03 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
10/23/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
State of Washington Department of Ecology Page 8 of 21 <br /> Agreement No: WQSWCAP-1921-EverPW-00049 <br /> Project Title: 2019-2021 Biennial Stormwater Capacity Grants <br /> Recipient Name: City of Everett <br /> SCOPE OF WORK <br /> Task Number: 2 Task Cost: $45,000.00 <br /> Task Title: Permit Implementation <br /> Task Description: <br /> Conduct work related to implementation of municipal stormwater National Pollutant Discharge Elimination System(NPDES) <br /> permit requirements. If the RECIPIENT is out of compliance with the municipal stormwater National Pollutant Discharge <br /> Elimination System(NPDES)permit,the RECIPIENT will ensure funds are used to attain compliance where applicable.The <br /> following is a list of elements RECIPIENT'S project may include. <br /> 1)Public education and outreach activities,including stewardship activities. <br /> 2)Public involvement and participation activities. <br /> 3)Illicit discharge detection and elimination(IDDE)program activities,including: <br /> a)Mapping of municipal separate storm sewer systems(MS4s). <br /> b)Staff training. <br /> c)Activities to identify and remove illicit stormwater discharges. <br /> d)Field screening procedures. <br /> e)Complaint hotline database or tracking system improvements. <br /> 4)Activities to support programs to control runoff from new development,redevelopment,and construction sites,including: <br /> a)Development of an ordinance and associated technical manual or update of applicable codes. <br /> b)Inspections before,during,and upon completion of construction,or for post-construction long-term maintenance. <br /> c)Training for plan review or inspection staff. <br /> d)Participation in applicable watershed planning effort. <br /> 5)Pollution prevention,good housekeeping,and operation and maintenance program activities,such as: <br /> a)Inspecting and/or maintaining the MS4 infrastructure. <br /> b)Developing and/or implementing policies,procedures,or stormwater pollution prevention plans at municipal properties or <br /> facilities. <br /> 6)Annual reporting activities. <br /> 7)Establishing and refining stormwater utilities,including stable rate structures. <br /> 8)Water quality monitoring to implement permit requirements for a Water Cleanup Plan(TMDL).Note that any monitoring <br /> funded by this program requires submittal of a Quality Assurance Project Plan(QAPP)that the DEPARMENT approves prior <br /> to awarding funding for monitoring. <br /> Monitoring,including: <br /> a)Development of applicable QAPPs. <br /> b)Monitoring activities,in accordance with a DEPARTMENT-approved QAPP,to meet Phase HI permit requirements. <br /> 9)Structural stormwater controls program activities(Phase I permit requirement) <br /> 10) Source control for existing development(Phase I permit requirement),including: <br /> a)Inventory and inspection program. <br /> b)Technical assistance and enforcement. <br /> c)Staff training. <br /> 11)Equipment purchases that result directly in improved permit compliance.Equipment purchases must be specific to <br /> implementing a permit requirement(such as a vactor truck)rathnthan general use(such as a pick-up truck).Equipment <br />
The URL can be used to link to this page
Your browser does not support the video tag.