Laserfiche WebLink
ORDINANCE NO. 4112 <br /> AN ORDINANCE of the City of Everett, Washington, amending <br /> Section 2 of Ordinance No. 4057 of the city, passed and <br /> approved November 13, 1964; amending Sections 1 and 2 <br /> of Ordinance No. 4080 of the city, passed and approved <br /> April 6, 1965; and declaring an emergency. <br /> THE CITY OF EVERETT DOES ORDAIN: <br /> Section 1. That Section 2 of Ordinance No. 4057 of the City of Everett, <br /> Washington, be and the same is hereby amended to read as follows: <br /> "Section 2. The estimated cost of acquiring, constructing and <br /> installing the above-described additions and improvements to the <br /> water supply and distribution system of the City is hereby declared <br /> to be, as near as may be, the sum of $12, 000, 000, which cost shall <br /> be provided from the sale of water revenue bonds of the City in the <br /> principal sum of $12, 000, 000. <br /> As an integral part of the plan for acquiring, constructing and <br /> installing the above-described additions and improvements to such <br /> system the City shall issue and sell such water revenue bonds in <br /> such amount or amounts and at such time or times as the Council <br /> may determine to be to the best interest of the City. The exact date <br /> or dates, form, terms,maturities and covenants of such bonds shall <br /> be as hereafter fixed by ordinance or ordinances of the City. " <br /> Section 2. That Section 1 of Ordinance No. 4080 of the City of Everett, <br /> Washington, (which section amends Section 1 of Ordinance No. 4057 of the city) <br /> be and the same is hereby amended to read as follows: <br /> "Section 1. The following plan for the acquisition, construction, <br /> and installation of additions and improvements to the water supply <br /> and distribution system of the City is hereby specified and adopted, <br /> to wit: <br /> The City shall acquire, construct and install the following: <br /> A water transmission line to be known as Pipe Line No. 5, <br /> being 51 inches in diameter, constructed of steel with coal <br /> tar enamel protective coatings, complete with valves, fittings <br /> and appurtenances beginning at the southerly tip of LAKE <br /> CHAPLAIN located in the NE 1/4 of Sec. 6, Twp. 28 N, R. 8 <br /> E.W.M. ; thence along and adjacent to the City's existing <br /> pipeline No. 1 through the SE 1/4 of said Sec. 6, Twp. 28 N., <br /> R 8, E.W.M. ; the westerly 1/2 of Sec. 's 8 and 17, Twp. 28 N., <br /> R 8 E. W.M. ; the SE 1/4 of Sec. 18, Twp. 28 N. , R. 8 E. W.M. ; <br /> the northerly 1/2 of Sec. 19, Twp. 28 N. , R. 8 E. W.M. ; the <br /> northerly 1/2's of Sec. 's 19 through 24, Twp. 28 N., R. 7 <br /> E.W.M. ; the N.E. 1/4 of Sec. 24, Twp. 28 N. , R. 6 E. W.M. ; <br /> the S. E. , S. W. , and N. W. 1/4's of Sec. 13, Twp. 28 N. , R. 6 <br />