My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1505 SE EVERETT MALL WAY Geotech Report 2018-01-02 MF Import
>
Address Records
>
SE EVERETT MALL WAY
>
1505
>
Geotech Report
>
1505 SE EVERETT MALL WAY Geotech Report 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2022 11:49:06 AM
Creation date
10/24/2019 11:46:59 AM
Metadata
Fields
Template:
Address Document
Street Name
SE EVERETT MALL WAY
Street Number
1505
Address Document Type
Geotech Report
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SU85URFACE EXPLORATION AND <br />GEOTECHNICAL ENGINEERING REPORT <br />EVERETT MALL WAY COMMERCIAL CENTER <br />EVERETT, WASHINGTON <br />a <br />1.0 INTRODUC710N � <br />This report preseqts the results of our subsurface exploration and geotechnical <br />engineering study canducted at the above referenced 'property. The proposed <br />projects and approximate locations of the explorations accomplished for this <br />study are presented on the Site and Exploration Plan, Figure 1. <br />The purpose of this study was to establish the general subsurface conditions at <br />the sites from which conclusions and recommendations for foundation design and <br />constructfon could be formulated. The scope of work consisted of field <br />explorations and geotechnical engineering analysis. The field exploration <br />program for this study consisted of excavating 14 backhoe test pits. Exploration <br />procedures are presented in a subsequent section of this report and <br />interpretative logs of the explorations are presented in Appendix A. <br />Written authorization to proceed with this study was granted by Mr. Jim Bakke of <br />James Bakke, Inc. on 11 April 1985. This report has been prepared for the <br />exclusive use of James Bakke. Inc.. Harmon and Associates, and their agents. for <br />specific application to this project in accordance with generally accepted <br />.� <br />yeotechnical engineering practice. , <br />2.0 SITE AND PROJECT DESCRIPTION <br />The site under consideration is located on the south side of Southeast Everett <br />Mall Way. west of Everett Mall Village. At the present time there is a small <br />bank building located on the north side of the property on Southeast Everett Mall <br />Nay. A yroup of mature fir trees s2ands just west of an existing office buiiding <br />and a wetlands region extends south from the south side of the property. The <br />
The URL can be used to link to this page
Your browser does not support the video tag.