My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1605 SE EVERETT MALL WAY WALMART 2018-01-01 MF Import
>
Address Records
>
SE EVERETT MALL WAY
>
1605
>
WALMART
>
1605 SE EVERETT MALL WAY WALMART 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2019 10:22:24 AM
Creation date
10/25/2019 10:03:21 AM
Metadata
Fields
Template:
Address Document
Street Name
SE EVERETT MALL WAY
Street Number
1605
Tenant Name
WALMART
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
299
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Seattle,Washington <br /> MIP , www.pacland.com <br /> T 206.522.9510 <br /> TURNING VISIONS INTO REALITY <br /> IV. Construction Stormwater Pollution Prevention Plan <br /> The proposed project will disturb greater than 1 acre therefore a Construction Stormwater <br /> Pollution Prevention Plan (C-SWPPP) will be required. Best Management Practices will be <br /> implemented to prevent construction stormwater pollution. <br /> Erosion Control Risk Assessment <br /> Existing site grades vary from 1.5% in paved areas to 70% in the landscaped area along the <br /> north/northeast site boundary. Steep slopes near the northeast corner of the property are <br /> well vegetated and will not be disturbed during redevelopment. The site is completely <br /> stabilized, and largely covered with pavement or roof area. Due to the limited area of <br /> disturbance and the stabilized site the Erosion Control Risk is Low. <br /> Throughout construction erosion control BMPs in compliance with Department of Ecology <br /> guidelines, per the approved NDPES permit, are proposed for the site. The project <br /> construction plans will include Phase I and II erosion control plans, details and notes <br /> which will describe the BMPs proposed for the project. Erosion control BMPs will be used <br /> to protect the existing storm drainage system, including existing catch basins, and prevent <br /> sediment runoff from the site. Proper installation, maintenance, and inspections of the <br /> proposed BMPs should result in minimal erosion and sedimentation impacts to adjacent <br /> properties. <br /> Construction Storm water Pollution Prevention Plan (C-SWPPP) <br /> A temporary erosion and sedimentation control (TESC) plan and construction stormwater <br /> pollution prevention plan (C-SWPPP) has been prepared to assist the contractor in <br /> complying with City and State requirements. See the TESC plans and C-SWPPP associated <br /> with this project for additional information (not included in this report). <br /> The twelve required elements of the C-SWPPP are: <br /> 1. Mark Clearing Limits <br /> 2. Establish Construction Access <br /> 3. Control Flow Rates <br /> 4. Install Sediment Controls <br /> 5. Stabilize Soils <br /> 6. Protect Slopes <br /> 7. Protect Drain Inlets <br /> 8. Stabilize Channels and Outlets <br /> 9. Control Pollutants <br /> 10.Control Dewatering <br /> 11.Maintain BMPs <br /> 12.Manage the Project <br /> — Everett Mall Plaza Parcel Ill Retail Expansion Stormwater Site Plan Page 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.