Laserfiche WebLink
Seattle,Washington <br /> T 2065 <br /> www.pacl22.9an570d.com <br /> TURNING VISIONS INTO REALITY <br /> Parking Flat 5.52 <br /> C, Lawn, Flat 0.91 <br /> C IMP DISP FLAT 0.04 <br /> Total 8.57 <br /> Table 4 - Proposed Flow Rates <br /> Event Flow rate(cfs) <br /> 2-year 0.904 <br /> 25-year 1.964 <br /> 100-year 2.704 <br /> The project site is considered one basin as all catch basins are conveyed to the flow <br /> control structure near the main signalized entrance of the site. As mentioned in the Site <br /> Assessment section above, the Bob's Burger and Brew stormwater drains through the <br /> project site, but stormwater for that property is managed on-site prior to discharge to the <br /> project site. The flow control structure information and detention pipe sizes and lengths <br /> are based on the as-built plans and topographic survey performed for the redevelopment. <br /> When calculating new impervious surfaces, the pavement repair required for utility <br /> installation and modification was not considered. This is an exemption per section 2.1.5 <br /> Volume I of the Manual. <br /> A type C soil, Alderwood, was used based on Table 5.5 in Volume I of the Manual and the <br /> Geotechnical report. <br /> Offsite drainage contributions to the basin are minimal as the surrounding areas are fully <br /> developed, or drain away from the site. Limited areas of the shared driveway drain onsite, <br /> and are identified on Figured 2 of Appendix A. <br /> D. Stormwater Flow Control Plan <br /> Modifications to the existing flow control system are not proposed. As discussed in <br /> sections above, it has been determined that Minimum Requirement #7 does not apply to <br /> the site. - <br /> However, an analysis of the existing flow control system is provided in this report for <br /> reference and to assist the owner with maintaining the system. This information is based <br /> on available as-built information received from past owners, and a current topographic <br /> survey. For additional information see Appendix C - Stormwater Flow Control - <br /> Supplemental Information. <br /> Everett Mall Plaza Parcel III Retail Expansion Stormwater Site Plan Page 20 <br />