My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1605 SE EVERETT MALL WAY WALMART 2018-01-01 MF Import
>
Address Records
>
SE EVERETT MALL WAY
>
1605
>
WALMART
>
1605 SE EVERETT MALL WAY WALMART 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2019 10:22:24 AM
Creation date
10/25/2019 10:03:21 AM
Metadata
Fields
Template:
Address Document
Street Name
SE EVERETT MALL WAY
Street Number
1605
Tenant Name
WALMART
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
299
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MEMSeattle,Washington <br /> www.pacland.com <br /> T 206.522.9510 <br /> TURNING VISIONS INTO REALITY <br /> control structure at the south side of the site, where it enters the City of Everett municipal <br /> stormwater system. <br /> See Appendix A, Figures 2 and 3 for exhibits showing the existing conditions and basin <br /> maps. The tables below summarize the existing conditions and existing flow rates. <br /> Table 1 — Pre-Redeveloped / Existing Conditions <br /> Condition Area (AC) <br /> Roof Tops Flat 1.64 <br /> Parking Flat 6.07 <br /> C, Lawn, Flat 0.86 <br /> Total 8.57 <br /> Table 2 — Pre-Redeveloped / Existing Flow Rates <br /> Event Flow rate(cfs) <br /> 2-year 0.916 <br /> 25-year 2.024 <br /> 100-year 2.805 <br /> C. Redeveloped Hydrology <br /> The proposed redevelopment of the site will not substantially modify the existing <br /> stormwater facilities as described above. The existing underground storage pipe and flow <br /> control structure will remain. <br /> See below for a breakdown of the developed site conditions and the methods used to <br /> obtain the redeveloped basin flows. <br /> Hydrologic Modeling Method <br /> Hydrologic analysis of the project area was performed using a calibrated continuous <br /> simulation hydrologic model as required by Volume I, Chapter 5 of the Manual. The <br /> Western Washington Hydrology Model (WWHM) was used. <br /> For detailed printouts of the hydrologic model results, please see the Appendices below. <br /> Basin Summary <br /> The proposed development was modeled with basins as shown in the table below and <br /> Figure 4 in Appendix A. <br /> Table 3 — Proposed Conditions <br /> Condition Area (AC) <br /> Roof Tops Flat 2.10 <br /> Everett Mall Plaza Parcel Ill Retail Expansion Stormwater Site Plan Page 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.