My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc 10/22/2019 Change Order 15
>
Contracts
>
Capital Contract
>
Interwest Construction Inc 10/22/2019 Change Order 15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2019 10:29:39 AM
Creation date
11/4/2019 10:29:29 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc
Approval Date
10/22/2019
Department
Public Works
Department Project Manager
Heather Griffin
Subject / Project Title
Grand Avenue Park Bridge
Public Works WO Number
PW3588
Amendment/Change Order
Change Order
Amendment/Change Order Number
15
Tracking Number
0000801
Total Compensation
$20,000.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc. 7/24/2017
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INTERWEST <br /> CONSTRUCTION <br /> INC. <br /> September 27th, 2019 Serial Letter 057 <br /> Ken Kettel,P.E.,Resident Engineer <br /> KBA/City of Everett <br /> 3101 Cedar Street <br /> Everett,WA 98201 <br /> RE: Request for Payment: Incentive for Not Impacting PUD Transmission Lines <br /> Grand Ave Pedestrian Bridge/PW 3588 <br /> Dear Ken: <br /> Interwest Construction, Inc. (Interwest) provides this letter to formally request payment of the <br /> incentive for not impacting PUD Transmission Lines. Special Provision 1-07.17 includes an <br /> incentive of$20,000 for construction without removal of the PUD transmission lines for bridge <br /> erection(reference lines 43-48 on page S63 of the Special Provisions). Interwest has successfully <br /> achieved this as of September 25th,2019. <br /> Interwest requests the City make arrangements to pay this incentive on the upcoming Pay <br /> Estimate 28 with other work completed in the current pay period. <br /> Please do not hesitate to call with any questions, comments,or concerns. <br /> Respectfully, <br /> INTERWEST CONSTRUCTION,INC. <br /> Izaak Fox,P.E. <br /> Project Manager <br /> Cc: Project File <br /> Enclosure: <br /> 609 N.Hill Blvd.I Burlington,WA 98233 <br /> www.interwest.biz <br /> Ph: (360)757-7574 Fax:(360)757-7574 <br /> Contractor License INTERCI121OF <br /> 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.