My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc 10/22/2019 Change Order 15
>
Contracts
>
Capital Contract
>
Interwest Construction Inc 10/22/2019 Change Order 15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2019 10:29:39 AM
Creation date
11/4/2019 10:29:29 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc
Approval Date
10/22/2019
Department
Public Works
Department Project Manager
Heather Griffin
Subject / Project Title
Grand Avenue Park Bridge
Public Works WO Number
PW3588
Amendment/Change Order
Change Order
Amendment/Change Order Number
15
Tracking Number
0000801
Total Compensation
$20,000.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc. 7/24/2017
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 The following addresses and telephone numbers of utility companies or their <br /> 2 Contractors that will be adjusting, relocating, replacing or constructing utilities within the <br /> 3 project limits are supplied for the Contractor's use: <br /> 4 <br /> 5 *** Snohomish County PUD <br /> 6 Quincy Kinman <br /> 7 Work hours 5:30 a.m. to 2:00 p.m. Monday through Friday. <br /> 8 Office phone 425-783-4384 <br /> 9 Cell phone 425-239-0852 <br /> 10 gxkinman(c�snopud.com <br /> 11 <br /> 12 Frontier Communications <br /> 13 Tim Rennick <br /> 14 1800 41st Street, M/C WA0104OS <br /> 15 Everett, WA 98201 <br /> 16 (425) 263-4025 <br /> 17 Tim.rennick(cr�ftr.com <br /> 18 <br /> 19 Comcast <br /> 20 Joe Fordon <br /> 21 1525 7t5th Street SW #200 <br /> 22 Everett, WA 98203 <br /> 23 (425) 263-5348 <br /> 24 Joe fordon(a�cable.comcast.com <br /> 25 <br /> 26 Wave Broadband <br /> 27 Attn: Tim Davidson <br /> 28 P.O. Box 1630 <br /> 29 La Conner WA 98257 <br /> 30 206-391-8679 <br /> 31 tDavidsonwavebroadband.com <br /> 32 <br /> 33 Puget Sound Energy, Gas <br /> 34 Patima Dejarath <br /> 35 P.O. Box 97034 (Mailstop:PSE09S) <br /> 36 Bellevue, WA 98009-9734 <br /> 37 Cell: (425) 647-7110 <br /> 38 Patima.Dejarath(a�pse.com <br /> 39 <br /> 40 *** <br /> 41 <br /> 42 (******) <br /> 43 Incentive for Not Impacting PUD Transmission Lines <br /> 44 It is essential that the Contracting Agency limits the impacts to the Snohomish County <br /> 45 PUD High Voltage Transmission Lines as much as possible. As an incentive to the <br /> 46 Contractor, the Contracting Agency will pay the Contractor *** $20,000 *** if construction <br /> 47 methods are utilized that allow for construction of the project WITHOUT removal of the <br /> 48 PUD transmission lines for bridge erection. <br /> 49 <br /> CITY OF EVERETT <br /> GRAND AVENUE PARK BRIDGE July2017 <br /> WO#3588 S63 <br />
The URL can be used to link to this page
Your browser does not support the video tag.