My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6920 SEAWAY BLVD Geotech Report 2018-01-02 MF Import
>
Address Records
>
SEAWAY BLVD
>
6920
>
Geotech Report
>
6920 SEAWAY BLVD Geotech Report 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2022 11:53:07 AM
Creation date
11/4/2019 1:36:51 PM
Metadata
Fields
Template:
Address Document
Street Name
SEAWAY BLVD
Street Number
6920
Address Document Type
Geotech Report
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f <br /> The spill.w•ay for the esis�in� ear[h d�r� which retains the mannade iake <br /> i currently consists o[ a rock-lined drainage channel which runs around the <br /> 1 <br /> northwest end of the dam. lJe unders[and that cons[ruction of the Phase 2 build- <br /> � ing at the location shown on P1.ate 1 wi1.1 require that a new spillcay be ins[alled. <br /> This new spillway is erpected [o consist of a concre[e s[ruc[ure which vill 1ie <br /> Iacross Che dam embankment rather than being a[ one end of it. <br /> SCOPE <br /> � The purposes uf [his investigation are to explore che subsurface aoi] .mJ <br /> ground water conditions at the pro,ject si[e and to develep geotechnical recom- <br /> mendations and design cri[eria for the proposed facili[ies. Our specific scope <br /> � of services includes: <br /> 1. GxpLuration ;ind J.aboracury phase. <br /> I �1. Exploring �ubsurface soil and ground wa[er conditions b�� drill- <br /> ing 4 tes[ borings and excavating 25 [est pits throughout [he <br /> Iarea of pr.�posed construction. <br /> B. Developing supplemen[al information on sof[ soil [hicknesses Ln <br /> � localized bog areas by hand probing. <br /> C. Defining pertinen[ physical characteris[ics of [he foundati:n <br /> soils and potential fill soils irom the results of labor�[orv <br /> I [ests performed on disturbed and undisturbed samples, as apprn- <br /> priate. <br /> � 2 Design s[udies. <br /> I <br /> A. Recommending the exten[ of stripping, gruUbing and o[her site <br /> Ipreparation activities, including temporary drainage faciliCies, <br /> needed to prepare the siee for cutting and filling operati.ons. <br /> I B. Recommending the type of soil �nd compactio:� cri[eria [o be <br /> used f�r both s[ruc[ural and nonstructural fills. <br /> C. Recommending design cut and Yill slopes, bo[h [emporary and <br /> Ipermanen[, as appropriate. <br /> D. Developing design criteria and se[tlement estimates for shallow <br /> Ispread foundations Eur the proposed structures. <br /> � <br /> E. Evaluating [he characteris[ic site period (T ) . <br /> s <br /> iF. Defining laceral pressure criteria for the design oE basement <br /> walls and other retaining s[ruc[ures which may Ue required. <br /> I G. Evaluating drainagc reyuirements for basement walls. <br /> N. Providing recommenda[ions for floor slab supporc and pavement <br /> design sections. <br /> II� ) <br /> ' � - <br /> � <br /> � GeoEngineers <br /> Incorporcted <br />
The URL can be used to link to this page
Your browser does not support the video tag.