My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6920 SEAWAY BLVD Geotech Report 2018-01-02 MF Import
>
Address Records
>
SEAWAY BLVD
>
6920
>
Geotech Report
>
6920 SEAWAY BLVD Geotech Report 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2022 11:53:07 AM
Creation date
11/4/2019 1:36:51 PM
Metadata
Fields
Template:
Address Document
Street Name
SEAWAY BLVD
Street Number
6920
Address Document Type
Geotech Report
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> T�ie spillw,�v for the exis[in� ear[h dam which re[ains the mannade lake <br /> , currently consists �f a rock-lined drainage channel which runs around [he <br /> northwes[ end of the dam. {Je unders[and [ha[ construc[ien of [he Phase 2 build- <br /> ' ing a[ [he location shuwn on Plate I will require [ha[ a new spillway be installed. <br /> This new cpillway is expected to consist of a concre[e s[ruc[ure which will 1ie <br /> across the dam .:mbankmen[ raGher than betng at one end of it. <br /> SCOPE <br /> The purpo�es of [his investigation are to explore the subsurface soil and <br /> ground wa[er conditions at the project site and co develop geo[echnical recom- <br /> mendations and design cri[erta Eor the proposed facili[ies. Our sp�cific scope <br /> of services inclu�?,:s; <br /> �• ExpLcration and labora[ory phase. <br /> ��• Gxploring subsurface soil and ground water conditions by drill- <br /> ing 4 tes[ borings and excavating 25 tes[ pi[s [hroughou[ [he <br /> acea oE proposed constcucttan, <br /> d• Developing supplemental information on sof[ soil [hicknesses Ln <br /> localized bog areas by hand probing, <br /> �• DeEining pertinent physical charactcristics of the foundation <br /> soils and poten[ial Fill soils irom Che resul[s of labor�to�:. <br /> tests performed un dis[arbed and un�i_sturbed samples, as �p�ri�_ <br /> priate. <br /> '-• Desigu studies. <br /> ��• Recommending the ex[ent of strippin6. Srubbing and other si[e <br /> preparation �ctivities, including [emporary drainage facilitie5, <br /> needed eo prepare the site for cutting and filling operations. <br /> B• Recommending the type oF soil and compac[ion criteria to be <br /> used [,�r both struc[ural and nons[ructural fills. <br /> �• Recomn,ending design cut and fill slopes, both temporary and <br /> permanen[, as appropriate. <br /> �• Developing design criteria �nd set[lement estima[es for shallow <br /> spread foundations for the proposed struc[ures. <br /> �• Evaluating the charac[eristic si[e period (T ), <br /> F• Definiag Lateral s <br /> pressure cri[eria for the design of basemen[ <br /> walls and other retaining s[ructures which may be required, <br /> �• 6valua[ing drainage requiremen[s for basement walls. <br /> F�� Providing reconunenda[ions [or ftoor slab support and pavement - <br /> desi,n sections. <br /> _ ' _ l�' <br /> GeoEngineers <br /> Incorporcted 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.