Laserfiche WebLink
- RZA AGRA Inc■ 11335 NE 122nd Way <br /> / Suite 100 <br /> (lormerly RrttenhouseZeman&Associates, lnc.l Ki rkland,WA 98034-6918 <br /> _,,_, Engineering&Environmental Services 12os182o-ass9 <br /> FAX(206)8213914 <br /> ° 25 Saptember 1992 <br /> W-8396 <br /> Mr. Bill Rucker <br /> �, c%The Prudential <br /> 2721 Watmors Avenue <br /> Evarett, Washinpton 98201 <br /> 1~ Attention: Mr. Bill Rucker <br /> �� <br /> � � Subject: Subsurface Exploration and Preliminary Geotechnical Enpineerinp Repott <br /> ' ' Proposed Residential Devalopment <br /> ' ' Southem Terminus of Sevenich Drive <br /> � � Everott, Washinpton <br /> , , <br /> Gantlemen: <br /> � � <br /> ♦ , Ae repuasted by Mr. Bill Rucker, this letter repott presents the results of our preliminary subsurfaca <br /> , . <br /> ( exploration and peotachnical enpineerinp evaluation for the above referenced project. The aubject <br /> property, aionp with the approximate locations of the explontions accompiiahed for this study are <br /> � shown on the Site and Ezploration Pla�, Fpure 1. Exploration lops with interpretive descriptions of <br /> � ° the subsurtace conditions ancountered at the expioration locations are enclosed with this report. <br /> _. The enpinearinp considerations and recommendations contained in this report are based on the <br /> subsurface axploration performed at the subject site on 13 Aupust, and 11 and 7 6 September 1992. <br /> Ths scope of our eervices wac pertormed in accordance with our approved proposal to Mr. Rucker <br /> dated 7 July 1992, with one amendment dated 14 September 1992. Tasks pertormed under this work <br /> scoya included excavation of soil test piu, one auper borinp,enpineerinp a�alysas, and preparation of <br /> this report. This report has been prepared in acaordance with penerally accepted peotechnical <br /> enpineerinp practicea for the exclusive use of Mr. Bill Rucker, and his apents, for specific application <br /> '•• to this project. At the time of this writinp, the proposed development was in the conceptual desipn <br /> phase,with no specific locations or desipns for planned site improvements. We recommend that RZA <br /> ~ , AGRA <br /> - Earth&Environmental6roup <br />