ABBREVIATIONS C A R N E G I E
<br /> GENERAL NOTES - MECHANICAL SHEET METAL NOTES NON-STRUCTURAL MECHANICAL COMPONENT NOTES
<br /> QJ DIAMETER F FAHRENHEIT, FIRE MAIN PIPING NA NOT APPLICABLE B U i �D I N G
<br /> FCO FLOOR CLEANOUT NC NOISE CRITERIA 1. C�ORDINATE MECHANICAL WORK WITH THAT OF OTHER 1. VOLUME DAMPERS: PROVIDE A MANUAL VOLUME DAMPER 1. THE COMPONENT IMPORTANCE FACTOR (Ip) FOR ALL R E S T�R A TI 0 N
<br /> A AMPS NIC NOT IN CONTRACT TRADES (ELECTRICAL, ARCHITECTURAL AND FOR EACH SUPPLY, RETURN, AND EXHAUST OPENING, NON-STRUCTURAL COMPONENTS SHALL BE:
<br /> FD DRY SPRINKLER ROUTING STRUCTURAL). REFER TO ELECTRICAL, ARCHITECTURAL LOCATED AS FAR UPSTREAM AS POSSIBLE FROM THE z
<br /> ABV ABOVE NO. NUMBER AND STRUCTURAL DRAWINGS AND SPECIFICATIONS. OPENING. PROVtDE A MANUAL VOLUME DAMPER FOR Ip = 1.0 JOO� OAKES AVE.
<br /> ADA AMERICANS WITH DISABILITIES ACT FDC FIRE DEPARTMENT CONNECTION NTS NOT TO SCALE COORDINATION SHALL OCCUR PRIOR TO FABRICATION, BRANCH MAINS SERVING MORE THAN ONE OPENING. EVERETT, WA 98201
<br /> FLA FULL LOAD AMPS PURCHASE, AND/OR INSTALLATION OF ALL WORK.
<br /> AFF ABOVE FINISHED FLOOR 2. PROVIDE 12" LONG, '/2' WIDE FI.UORESCENT ORANGE TAPE 2. THE FOLLOWING ITEMS ARE TAKEN DIRECTLY FROM THE
<br /> FLEX FLEXIBLE 2. COORDINATE PLUMBING, HVAC, AND FIRE PROTECTION AT CONCEALED VOLUME DAMPER LOCATIONS. 2015 INTERNATIONAL BUILDING CODE AND FROM THE
<br /> AHJ AUTHORITY HAVING JURISDICTION OA OUTDOOR AIR SYSTEMS ROUTING PRIOR TO INSTALLATION. DURING AMERICAN SOCIETY OF CiViL ENGINEERS (ASCE)
<br /> FLR FLOOR LAYOUT COORDINATION, DUCTWORK TAKES PRECEDENCE STANDARD 7-05. THE CONTRACTOR SHALL REFER TO THE
<br /> AHU AIR HANDLING UNIT OBD OPPOSED BLADE DAMPER a M�
<br /> FLTR FILTER OVER PLUMBING, INCLUDING FIRE PROTECTION SYSTEMS. ABOVE FOR ADDITIONAL INFORMATION, EXCEPTIONS, AND
<br /> AP ACCESS PANEL OC ON CENTER
<br /> FPM FEET PER MINUTE FURTHER DESCRIPTIONS. THE CONTRACTOR SHALL �
<br /> APD AIR PRESSURE DROP OD OUTSIDE DIMENSION OR DIAMETER 3. UNLESS OTHERWISE SPECIFIED, THE GENERAL ENERGY CODE NOTES ADHERE TO REQUIREMENTS AND AS SUCH, SHALL BE
<br /> FPS FEET PER SECOND CONTRACTOR (GC) SHALL BE RESPONSIBLE FOR PAINTING, INCLUDED WITHIN BID. ALSO REFER TO SPECIFICATION �
<br /> ARCH ARCHITECT FT FEET OSA OUTDOOR SUPPLY AIR CUTTING, AND PATCHING OF EXISTING FLOORS, WALLS, SECTION 230550. �
<br /> AMERICAN SOCIETY OF HEATING, REFRIGERATION OV OUTLET VELOCITY AND PARTITIONS IN THE EXISTING BUILDING. r h
<br /> ASHRAE 1. MOTORS: COMPLY WITH MINIMUM FULL LOAD `��
<br /> AND AIR-CONDITIONING ENGINEERS, INC. FV FACE VELOCITY 3. 2015 IBC, 1613.1, SCOPE: ARCHITECTURAL, MECHANICAL,
<br /> EFFICIENCIES LISTED IN ENERGY CODE ENFORCED BY AHJ.
<br /> ASSY ASSEMBLY 4. REFER TO STRUCTURAL DRAWINGS FOR ALLOWABLE ELECTRICAL, AND NON-STRUCTURAL COMPONENTS THAT �
<br /> P PUMP, PRESSURE, PLUMBING FIXTURE METHODS/LOADS FOR HANGING PIPING/DUCTS FROM ARE PERMANENTLY ATTACHED TO STRUCTURES AND (�
<br /> 2. PIPING AND DUCT INSULATION: COMPLY WITH
<br /> G GAS STRUCTURAL MEMBERS. THICKNESSES AND TYPES LISTED IN ENERGY CODE THEIR SUPPORTS AND ATTACHMENTS SHALL BE DESIGNED �
<br /> PD PRESSURE DROP AND CONSTRUCTED TO RESIST THE EFFECTS OF �
<br /> BHP BRAKE HORSE POWER GA GAGE ENFORCED BY AHJ UNLESS MORE STRINGENT
<br /> PH PHASE 5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE SAFE REQUIREMENTS ARE SPECIFIED. EARTHQUAKE MOTIONS IN ACCORDANCE WITH ASCE 7-05, �
<br /> BLW BELOW GAL GALLONS KEEPING OF HIS OWN PROPERTY ON THE JOB SITE. EXCLUDING CHAPTER 14 AND APPENDIX 11A. r �
<br /> POC POINT OF CONNECTION OWNER ASSUMES NO RESPONSIBILITY FOR PROTECTION `,�
<br /> BOD BOTTOM OF DUCT GALV GALVANIZED 3. DUCT SEALING: SEAL DUCT TRANSVERSE JOINTS AND
<br /> PRV PRESSURE REDUCING VALVE OF PROPERTIES AGAINST FIRE, THEFT, AND LONGITUDINAL SEAMS PER ENERGY CODE ENFORCED BY 4. 2015 IBC 1704.4 CONTRACTOR RESPONSIBILITY: THE
<br /> BOP BOTTOM OF PIPE GAHU GAS AIR HANDLING UNIT ENVIRONMENTAL CONDITIONS. CONTRACTOR SHALL BE RESPONSIBLE FOR THE
<br /> PSIG POUNDS PER SQUARE INCH GAGE AHJ UNLESS MORE STRINGENT REQUIREMENTS ARE 2813 ROCKEFELLER AVE
<br /> CONSTRUCTION OF A SEISMIC-FORCE-RESISTING SYSTEM, EVERETT, WA 98201
<br /> BOT BOTTOM GC GAS COCK, GENERAL CONTRACTOR SPECIFIED. DESIGNATED SEISMIC SYSTEM, OR SEISMIC-RESISTING
<br /> BTUH BRITISH THERMAL UNIT PER HOUR GFU GAS FIRED UNIT COMPONENT LISTED IN THE STATEMENT OF SPECIAL
<br /> QTY QUANTITY 4. RECORD DRAWINGS: SUBMIT TO THE BUILDING OWNER PHONE: 42 'rJ.3'I 7.80�7
<br /> BV BALL VALVE GPF GALLONS PER FLUSH PER ENERGY CODE ENFORCED BY THE LOCAL AHJ. INSPECTIONS AND SHALL SUBMIT A WRITTEN STATEMENT FAX: 425.3�7.8489
<br /> MECHANICAL EQUIPMENT INSTALLATION NOTES OF RESPONSIBILITY TO THE BUILDING OFFICIAL AND THE
<br /> GPH GALLONS PER HOUR 5. OPERATION AND MAINTENANCE MANUALS: SUBMIT TO THE OWNER PRIOR TO THE COMMENCEMENT OF WORK ON THE
<br /> RA RETURN AIR, RELIEF AIR BUILDING OWNER PER ENERGY CODE ENFORCED BY THE SYSTEM OR COMPONENT. THE CONTRACTOR'S
<br /> CAP CAPACITY GPM GALLONS PER MINUTE 1. ACCESS CLEARANCES FOR MAINTENANCE AND STATEMENT OF RESPONSIBILITY SHALL INCLUDE THE
<br /> REF REFERENCE LOCAL AHJ.
<br /> CD CEILING DIFFUSER GPRV GAS PRESSURE REGULATING VALVE REPLACEMENT: VERIFY PHYSICAL DIMENSIONS OF FO�LOWING: ,
<br /> RF RELIEF FAN EQUIPMENT TO ENSURE THAT ACCESS CLEARANCES CAN
<br /> CFM CUBIC FEET PER MINUTE GRD GRILLES, REGISTERS, AND DIFFUSERS 6. SYSTEM BALANCING: BALANCE HVAC SYSTEMS PER
<br /> RG RETURN GRILLE BE MET. COORDINATE LOCATIONS OF MECHANICAL WORK ENERGY CODE ENFORCED BY THE LOCAL AHJ AND SUBMIT A. ACKNOWLEDGEMENT OF AWARENESS OF THE
<br /> CG CEILING GRILLE GV GATE VALVE, GLOBE VALVE AND WORK OF OTHER TRADES TO PROVIDE ACCESS A WRITTEN REPORT TO THE BUILDING OWNER. REFER TO SPECIAL REQUIREMENTS CONTAINED IN THE �
<br /> RH ROOF HOOD CLEARANCES FOR SERVICE AND MAINTENANCE. SPECIFICATIONS FOR ADDITIONAL TESTING, ADJUSTING, STATEMENT OF SPECIAL INSPECTIONS;
<br /> CKV CHECK VALVE GWB GYPSUM WALLBOARD
<br /> RI&C ROUGH IN AND CONNECT AND BALANCING (TAB) REQUIREMENTS. B. ACKNOWLEDGEMENT THAT CONTROL WILL BE
<br /> CLG CEI�ING RLA RATED LOAD AMPS EXERCISED TO OBTAIN CONFORMANCE WITH THE
<br /> CO CLEANOUT H HEIGHT 7. MECHANICAL SYSTEMS COMMISSIONING AND COMPLETION CONSTRUCTION DOCUMENTS APPROVED BY THE
<br /> RPBA REDUCED PRESSURE BACKFLOW ASSEMBLY REQUIREMENTS: TEST SYSTEMS TO ENSURE THAT
<br /> CO2 CO2 SENSOR HB HOSE BIBB RPM REVOLUTIONS PER MINUTE PIPING NOTES BUILDING SYSTEMS HAVE BEEN DESIGNED, INSTALLED, BUILDING OFFICIAL;
<br /> COMB COMBUSTION, COMBINATION HC HEATING COIL AND FUNCTION PROPERLY, EFFICIEN7LY, AND CAN BE C. PROCEDURES FOR EXERCISING CONTROL WITHIN THE
<br /> RTU ROOFTOP UNIT MAINTAINED IN ACCORDANCE WITH THE CONTRACT
<br /> CV CONSTANT VOLUME HD HEAD DOCUMENTS IN ORDER TO SATISFY THE BUILDING CONTRACTOR'S ORGANIZATION, THE METHOD AND
<br /> RV SAFETY RELIEF VALVE 1. DISASSEMBLY PROVISIONS: PROVIDE UNIONS OR FREQUENCY OF REPORTING AND THE DISTRIBUTION �
<br /> CW COLD WATER PIPING HORIZ HORIZONTAL FLANGES AT PIPING CONNECTIONS TO EQUIPMENT, COILS, OWNER'S DESIGN INTENT AND OPERATIONAL �• ,�'
<br /> REQUIREMENTS PER ENERGY CODE ENFORCED BY THE OF THE REPORTS; � ��
<br /> HP HORSEPOWER TRAPS, CONTROL VALVES, AND OTHER COMPONENTS TO LOCAL AHJ. REFER TO SPECIFICATIONS FOR ADDITIONAL � '`�
<br /> SA SUPPLY AIR ALLOW DISASSEMBLY FOR MAINTENANCE. COMMISSIONING REQUIREMENTS D. IDENTIFICATION AND QUALIFICATIONS OF THE � ' �
<br /> D DRAIN HRU HEAT RECOVERY UNIT PERSON(S) EXERCISING SUCH CONTROL AND THEIR
<br /> SAT SUPPLY AIR TEMPERATURE 2. PROVIDE 12" LONG, '/�"WIDE FLUORESCENT ORANGE TAPE POSITION(S) IN THE ORGANIZATION. � � "��- �--' � - �
<br /> DB DRY BULB (TEMPERATURE) HTG HEATING 8. THIS BUILDING AND ITS ENERGY SYSTEMS HAVE BEEN " � � �
<br /> SCH SCHEDULE AT CONCEALED VALVE LOCATIONS. DESIGNED TO COMPLY WITH ENERGY CODE ENFORCED BY � �
<br /> dB DECIBEL HVAC HEATING, VENTILATING, AND AIR CONDtTiONING 4. DIVISION 21, 22, 23 RESPONSIBILITIES: �Q��,� �
<br /> SF SUPPLY FAN, SQUARE FOOT THE LOCAL AHJ. CONTRACTOR IS RESPONSIBLE FOR
<br /> DEG DEGREE HW HOT WATER PIPING CORRECT INSTALLATION OF ENERGY CONSERVATION A. HANGERS AND SEISMIC BRACING FOR MECHANICAL ��, 8'�
<br /> DFU DRAINAGE FIXTURE UNIT HWC HOT WATER CIRCULATING PIPING SG SUPPLY GRILLE MEASURES.
<br /> PLUMBING NOTES SYSTEMS SHALL BE DESIGNED AND SPECIFIED BY
<br /> DI DUCTILE IRON HZ HERTZ SIM SIMILAR DIVISION 21, 22, 23. DIVISION 21, 22, 23 SHALL REFER �i '�`�►�
<br /> TO THE MECHANICAL DRAWINGS FOR LOCATIONS OF
<br /> DtA DIAMETER SHEET METAL AND AIR CONDITIONING EQUIPMENT AND HUNG MECHANICAL SYSTEMS AS
<br /> SMACNA CONTRACTORS' NATIONAL ASSOCIATION, INC. 1. WATER HAMMER ARRESTORS: PROVIDE AT THE END OF
<br /> DIM DIMENSION IAQ INDOOR AIR QUALITY HOT AND COLD WATER LINES SERVING TWO OR MORE STRUCTURAL DRAWINGS DO NOT SHOW THE
<br /> LOCATION OF STARTER, DISCONNECT AND ID INDIRECT DRAIN SOV SHUTOFF VALVE FIXTURES. SIZE IN ACCORDANCE WITH PLUMBING AND LOCATIONS OF MECHANICAL EQUIPMENT, DUCTWORK,
<br /> DISC CONTROLS SP STATIC PRESSURE
<br /> DRAINAGE INSTITUTE (PDI) REQUIREMENTS. PIPING, AND OTHER COMPONENTS.
<br /> IE INVERT ELEVATION
<br /> DISCH DISCHARGE IN. INCH SPKR SPRINKLER 2. REDUCED PRESSURE BACKFLOW PREVENTERS (RPBP): B. DIVISION 21, 22, 23 SHALL COORDINATE THE SUPPORT
<br /> PROVIDE INDIRECT DRAIN PIPING FROM RPBP TO NEAREST SYSTEMS AND DESIGN LOADS FOR HUNG PIPING AND
<br /> DN DOWN IN. WG iNCHES WATER COLUMN SS STAINLESS STEEL, SANITARY SEWER DRAIN. INSTALL FUNNEL AT RPBP IF REQUIRED. OTHER MECHANICAL SYSTEMS (INCLUDING COMBINED erlo REqSTERED
<br /> DWGS DRAWINGS ST SOUND TRAP MULTIPLE PIPE RUNS) WITH THE GENERAL ARCHIIECT
<br /> IW INDiRECT WASTE PIPING CONTRACTOR AND THE STEEL AND WOOD JOIST
<br /> DV DRAIN VALVE 3. ACCESS PANELS: PROVIDE IN NON ACCESSIBLE CEIUNGS
<br /> AND WALLS FOR VALVES, WATER HAMMER ARRESTERS, MANUFACTURERS IN ADDITION TO OTHER TRADES
<br /> kW KILOWATT TDH TOTAL DYNAMIC HEAD CLEANOUTS, AND OTHER ITEMS THAT REQUIRE ACCESS THAT MAY BE IMPACTED. �����
<br /> (E) EXISTING TEMP TEMPERATURE TO PROPERLY MAWTAIN OR SERVICE THE BUILDING.
<br /> REFER TO SPECIFICATIONS.
<br /> EA EXHAUST AIR L LENGTH TG TRANSFER GRILLE
<br /> EAT ENTERING AIR TEMPERATURE TOD TOP OF DUCT �
<br /> LAT LEAVING AIR TEMPERATURE
<br /> SCALE: AS NOTED
<br /> EER ENERGY EFFICIENCY RATIO TOP TOP OF PIPE ISSUE DATE: O��Z4�2O��
<br /> LB LINEAR BAR
<br /> EF EXHAUST FAN LBS POUND TOS TOP OF STEEL AC
<br /> DRAWN:
<br /> EFF EFFICIENCY LD LINEAR DIFFUSER TOF TOP OF FOOTING CHECKED: RE
<br /> EG EXHAUST GRILLE LVR LOUVER TSP TOTAL STATIC PRESSURE
<br /> EL ELEVATION LWR LOW WALL RETURN T'STAT THERMOSTAT (� THIS PLAN AND DESIGN IS AND REMAINS
<br /> THE PROPERTY OF THE ARCHITECTS AND
<br /> ELEC E�ECTRIC LWS LOW WALL SUPPLY TU TERMINAL UNIT MAY NOT BE USED WITHOUT PRIOR
<br /> EMCS ENERGY MANAGEMENT AND CONTROL SYSTEM TYP TYPICAL CONSENT FROM THE ARCHITECT
<br /> � EQUIV EQUIVALENT MAT MIXED AIR TEMPERATURE �
<br /> ESP EXTERNAL STATIC PRESSURE MAX MAXIMUM UNO UNLESS NOTED OTHERWISE REVIEW
<br /> EXH EXHAUST MBH THOUSAND BTU PER HOUR
<br /> EXT EXTERIOR, EXTERNAL MC MECHANICAL CONTRACTOR V VENT PIPING, VOLT REV. DATE DESCRIPTION
<br /> MCA MINIMUM CIRCUIT AMPACITY VA VALVE 05 26 SCHEMATIC DESIGN
<br /> MECH MECHANICAL VD VOLUME DAMPER 08 15 PROGRESS DRAWINGS
<br /> MERV MINIMUM EFFICIENCY REPORTING VALUE VEL VELOCITY O9 O$ PERMIT SET
<br /> MIN MINIMUM VOLT VOLTAGE
<br /> MOCP MAXIMUM OVERCURRENT PROTECTION �R VENT THRU ROOF
<br /> MOD MOTOR OPERATED DAMPER
<br /> W WASTE, WATT, WIDE, WATER
<br /> W/ WITH
<br /> WC WATER CLOSET, WATER COLUMN
<br /> W�o WALL CLEANOUT M ECH AN I CAL LEGEN D Bc
<br /> WH WATER HEATER, WALL HYDRANT G E N E R A L N 0 TE S
<br /> WHA WATER HAMMER ARRESTOR
<br /> WM WATER METER
<br /> WSEC WASHINGTON STATE ENERGY CODE -
<br /> WT WEIGHT
<br /> •
<br />
|