Laserfiche WebLink
ABBREVIATIONS C A R N E G I E <br /> GENERAL NOTES - MECHANICAL SHEET METAL NOTES NON-STRUCTURAL MECHANICAL COMPONENT NOTES <br /> QJ DIAMETER F FAHRENHEIT, FIRE MAIN PIPING NA NOT APPLICABLE B U i �D I N G <br /> FCO FLOOR CLEANOUT NC NOISE CRITERIA 1. C�ORDINATE MECHANICAL WORK WITH THAT OF OTHER 1. VOLUME DAMPERS: PROVIDE A MANUAL VOLUME DAMPER 1. THE COMPONENT IMPORTANCE FACTOR (Ip) FOR ALL R E S T�R A TI 0 N <br /> A AMPS NIC NOT IN CONTRACT TRADES (ELECTRICAL, ARCHITECTURAL AND FOR EACH SUPPLY, RETURN, AND EXHAUST OPENING, NON-STRUCTURAL COMPONENTS SHALL BE: <br /> FD DRY SPRINKLER ROUTING STRUCTURAL). REFER TO ELECTRICAL, ARCHITECTURAL LOCATED AS FAR UPSTREAM AS POSSIBLE FROM THE z <br /> ABV ABOVE NO. NUMBER AND STRUCTURAL DRAWINGS AND SPECIFICATIONS. OPENING. PROVtDE A MANUAL VOLUME DAMPER FOR Ip = 1.0 JOO� OAKES AVE. <br /> ADA AMERICANS WITH DISABILITIES ACT FDC FIRE DEPARTMENT CONNECTION NTS NOT TO SCALE COORDINATION SHALL OCCUR PRIOR TO FABRICATION, BRANCH MAINS SERVING MORE THAN ONE OPENING. EVERETT, WA 98201 <br /> FLA FULL LOAD AMPS PURCHASE, AND/OR INSTALLATION OF ALL WORK. <br /> AFF ABOVE FINISHED FLOOR 2. PROVIDE 12" LONG, '/2' WIDE FI.UORESCENT ORANGE TAPE 2. THE FOLLOWING ITEMS ARE TAKEN DIRECTLY FROM THE <br /> FLEX FLEXIBLE 2. COORDINATE PLUMBING, HVAC, AND FIRE PROTECTION AT CONCEALED VOLUME DAMPER LOCATIONS. 2015 INTERNATIONAL BUILDING CODE AND FROM THE <br /> AHJ AUTHORITY HAVING JURISDICTION OA OUTDOOR AIR SYSTEMS ROUTING PRIOR TO INSTALLATION. DURING AMERICAN SOCIETY OF CiViL ENGINEERS (ASCE) <br /> FLR FLOOR LAYOUT COORDINATION, DUCTWORK TAKES PRECEDENCE STANDARD 7-05. THE CONTRACTOR SHALL REFER TO THE <br /> AHU AIR HANDLING UNIT OBD OPPOSED BLADE DAMPER a M� <br /> FLTR FILTER OVER PLUMBING, INCLUDING FIRE PROTECTION SYSTEMS. ABOVE FOR ADDITIONAL INFORMATION, EXCEPTIONS, AND <br /> AP ACCESS PANEL OC ON CENTER <br /> FPM FEET PER MINUTE FURTHER DESCRIPTIONS. THE CONTRACTOR SHALL � <br /> APD AIR PRESSURE DROP OD OUTSIDE DIMENSION OR DIAMETER 3. UNLESS OTHERWISE SPECIFIED, THE GENERAL ENERGY CODE NOTES ADHERE TO REQUIREMENTS AND AS SUCH, SHALL BE <br /> FPS FEET PER SECOND CONTRACTOR (GC) SHALL BE RESPONSIBLE FOR PAINTING, INCLUDED WITHIN BID. ALSO REFER TO SPECIFICATION � <br /> ARCH ARCHITECT FT FEET OSA OUTDOOR SUPPLY AIR CUTTING, AND PATCHING OF EXISTING FLOORS, WALLS, SECTION 230550. � <br /> AMERICAN SOCIETY OF HEATING, REFRIGERATION OV OUTLET VELOCITY AND PARTITIONS IN THE EXISTING BUILDING. r h <br /> ASHRAE 1. MOTORS: COMPLY WITH MINIMUM FULL LOAD `�� <br /> AND AIR-CONDITIONING ENGINEERS, INC. FV FACE VELOCITY 3. 2015 IBC, 1613.1, SCOPE: ARCHITECTURAL, MECHANICAL, <br /> EFFICIENCIES LISTED IN ENERGY CODE ENFORCED BY AHJ. <br /> ASSY ASSEMBLY 4. REFER TO STRUCTURAL DRAWINGS FOR ALLOWABLE ELECTRICAL, AND NON-STRUCTURAL COMPONENTS THAT � <br /> P PUMP, PRESSURE, PLUMBING FIXTURE METHODS/LOADS FOR HANGING PIPING/DUCTS FROM ARE PERMANENTLY ATTACHED TO STRUCTURES AND (� <br /> 2. PIPING AND DUCT INSULATION: COMPLY WITH <br /> G GAS STRUCTURAL MEMBERS. THICKNESSES AND TYPES LISTED IN ENERGY CODE THEIR SUPPORTS AND ATTACHMENTS SHALL BE DESIGNED � <br /> PD PRESSURE DROP AND CONSTRUCTED TO RESIST THE EFFECTS OF � <br /> BHP BRAKE HORSE POWER GA GAGE ENFORCED BY AHJ UNLESS MORE STRINGENT <br /> PH PHASE 5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE SAFE REQUIREMENTS ARE SPECIFIED. EARTHQUAKE MOTIONS IN ACCORDANCE WITH ASCE 7-05, � <br /> BLW BELOW GAL GALLONS KEEPING OF HIS OWN PROPERTY ON THE JOB SITE. EXCLUDING CHAPTER 14 AND APPENDIX 11A. r � <br /> POC POINT OF CONNECTION OWNER ASSUMES NO RESPONSIBILITY FOR PROTECTION `,� <br /> BOD BOTTOM OF DUCT GALV GALVANIZED 3. DUCT SEALING: SEAL DUCT TRANSVERSE JOINTS AND <br /> PRV PRESSURE REDUCING VALVE OF PROPERTIES AGAINST FIRE, THEFT, AND LONGITUDINAL SEAMS PER ENERGY CODE ENFORCED BY 4. 2015 IBC 1704.4 CONTRACTOR RESPONSIBILITY: THE <br /> BOP BOTTOM OF PIPE GAHU GAS AIR HANDLING UNIT ENVIRONMENTAL CONDITIONS. CONTRACTOR SHALL BE RESPONSIBLE FOR THE <br /> PSIG POUNDS PER SQUARE INCH GAGE AHJ UNLESS MORE STRINGENT REQUIREMENTS ARE 2813 ROCKEFELLER AVE <br /> CONSTRUCTION OF A SEISMIC-FORCE-RESISTING SYSTEM, EVERETT, WA 98201 <br /> BOT BOTTOM GC GAS COCK, GENERAL CONTRACTOR SPECIFIED. DESIGNATED SEISMIC SYSTEM, OR SEISMIC-RESISTING <br /> BTUH BRITISH THERMAL UNIT PER HOUR GFU GAS FIRED UNIT COMPONENT LISTED IN THE STATEMENT OF SPECIAL <br /> QTY QUANTITY 4. RECORD DRAWINGS: SUBMIT TO THE BUILDING OWNER PHONE: 42 'rJ.3'I 7.80�7 <br /> BV BALL VALVE GPF GALLONS PER FLUSH PER ENERGY CODE ENFORCED BY THE LOCAL AHJ. INSPECTIONS AND SHALL SUBMIT A WRITTEN STATEMENT FAX: 425.3�7.8489 <br /> MECHANICAL EQUIPMENT INSTALLATION NOTES OF RESPONSIBILITY TO THE BUILDING OFFICIAL AND THE <br /> GPH GALLONS PER HOUR 5. OPERATION AND MAINTENANCE MANUALS: SUBMIT TO THE OWNER PRIOR TO THE COMMENCEMENT OF WORK ON THE <br /> RA RETURN AIR, RELIEF AIR BUILDING OWNER PER ENERGY CODE ENFORCED BY THE SYSTEM OR COMPONENT. THE CONTRACTOR'S <br /> CAP CAPACITY GPM GALLONS PER MINUTE 1. ACCESS CLEARANCES FOR MAINTENANCE AND STATEMENT OF RESPONSIBILITY SHALL INCLUDE THE <br /> REF REFERENCE LOCAL AHJ. <br /> CD CEILING DIFFUSER GPRV GAS PRESSURE REGULATING VALVE REPLACEMENT: VERIFY PHYSICAL DIMENSIONS OF FO�LOWING: , <br /> RF RELIEF FAN EQUIPMENT TO ENSURE THAT ACCESS CLEARANCES CAN <br /> CFM CUBIC FEET PER MINUTE GRD GRILLES, REGISTERS, AND DIFFUSERS 6. SYSTEM BALANCING: BALANCE HVAC SYSTEMS PER <br /> RG RETURN GRILLE BE MET. COORDINATE LOCATIONS OF MECHANICAL WORK ENERGY CODE ENFORCED BY THE LOCAL AHJ AND SUBMIT A. ACKNOWLEDGEMENT OF AWARENESS OF THE <br /> CG CEILING GRILLE GV GATE VALVE, GLOBE VALVE AND WORK OF OTHER TRADES TO PROVIDE ACCESS A WRITTEN REPORT TO THE BUILDING OWNER. REFER TO SPECIAL REQUIREMENTS CONTAINED IN THE � <br /> RH ROOF HOOD CLEARANCES FOR SERVICE AND MAINTENANCE. SPECIFICATIONS FOR ADDITIONAL TESTING, ADJUSTING, STATEMENT OF SPECIAL INSPECTIONS; <br /> CKV CHECK VALVE GWB GYPSUM WALLBOARD <br /> RI&C ROUGH IN AND CONNECT AND BALANCING (TAB) REQUIREMENTS. B. ACKNOWLEDGEMENT THAT CONTROL WILL BE <br /> CLG CEI�ING RLA RATED LOAD AMPS EXERCISED TO OBTAIN CONFORMANCE WITH THE <br /> CO CLEANOUT H HEIGHT 7. MECHANICAL SYSTEMS COMMISSIONING AND COMPLETION CONSTRUCTION DOCUMENTS APPROVED BY THE <br /> RPBA REDUCED PRESSURE BACKFLOW ASSEMBLY REQUIREMENTS: TEST SYSTEMS TO ENSURE THAT <br /> CO2 CO2 SENSOR HB HOSE BIBB RPM REVOLUTIONS PER MINUTE PIPING NOTES BUILDING SYSTEMS HAVE BEEN DESIGNED, INSTALLED, BUILDING OFFICIAL; <br /> COMB COMBUSTION, COMBINATION HC HEATING COIL AND FUNCTION PROPERLY, EFFICIEN7LY, AND CAN BE C. PROCEDURES FOR EXERCISING CONTROL WITHIN THE <br /> RTU ROOFTOP UNIT MAINTAINED IN ACCORDANCE WITH THE CONTRACT <br /> CV CONSTANT VOLUME HD HEAD DOCUMENTS IN ORDER TO SATISFY THE BUILDING CONTRACTOR'S ORGANIZATION, THE METHOD AND <br /> RV SAFETY RELIEF VALVE 1. DISASSEMBLY PROVISIONS: PROVIDE UNIONS OR FREQUENCY OF REPORTING AND THE DISTRIBUTION � <br /> CW COLD WATER PIPING HORIZ HORIZONTAL FLANGES AT PIPING CONNECTIONS TO EQUIPMENT, COILS, OWNER'S DESIGN INTENT AND OPERATIONAL �• ,�' <br /> REQUIREMENTS PER ENERGY CODE ENFORCED BY THE OF THE REPORTS; � �� <br /> HP HORSEPOWER TRAPS, CONTROL VALVES, AND OTHER COMPONENTS TO LOCAL AHJ. REFER TO SPECIFICATIONS FOR ADDITIONAL � '`� <br /> SA SUPPLY AIR ALLOW DISASSEMBLY FOR MAINTENANCE. COMMISSIONING REQUIREMENTS D. IDENTIFICATION AND QUALIFICATIONS OF THE � ' � <br /> D DRAIN HRU HEAT RECOVERY UNIT PERSON(S) EXERCISING SUCH CONTROL AND THEIR <br /> SAT SUPPLY AIR TEMPERATURE 2. PROVIDE 12" LONG, '/�"WIDE FLUORESCENT ORANGE TAPE POSITION(S) IN THE ORGANIZATION. � � "��- �--' � - � <br /> DB DRY BULB (TEMPERATURE) HTG HEATING 8. THIS BUILDING AND ITS ENERGY SYSTEMS HAVE BEEN " � � � <br /> SCH SCHEDULE AT CONCEALED VALVE LOCATIONS. DESIGNED TO COMPLY WITH ENERGY CODE ENFORCED BY � � <br /> dB DECIBEL HVAC HEATING, VENTILATING, AND AIR CONDtTiONING 4. DIVISION 21, 22, 23 RESPONSIBILITIES: �Q��,� � <br /> SF SUPPLY FAN, SQUARE FOOT THE LOCAL AHJ. CONTRACTOR IS RESPONSIBLE FOR <br /> DEG DEGREE HW HOT WATER PIPING CORRECT INSTALLATION OF ENERGY CONSERVATION A. HANGERS AND SEISMIC BRACING FOR MECHANICAL ��, 8'� <br /> DFU DRAINAGE FIXTURE UNIT HWC HOT WATER CIRCULATING PIPING SG SUPPLY GRILLE MEASURES. <br /> PLUMBING NOTES SYSTEMS SHALL BE DESIGNED AND SPECIFIED BY <br /> DI DUCTILE IRON HZ HERTZ SIM SIMILAR DIVISION 21, 22, 23. DIVISION 21, 22, 23 SHALL REFER �i '�`�►� <br /> TO THE MECHANICAL DRAWINGS FOR LOCATIONS OF <br /> DtA DIAMETER SHEET METAL AND AIR CONDITIONING EQUIPMENT AND HUNG MECHANICAL SYSTEMS AS <br /> SMACNA CONTRACTORS' NATIONAL ASSOCIATION, INC. 1. WATER HAMMER ARRESTORS: PROVIDE AT THE END OF <br /> DIM DIMENSION IAQ INDOOR AIR QUALITY HOT AND COLD WATER LINES SERVING TWO OR MORE STRUCTURAL DRAWINGS DO NOT SHOW THE <br /> LOCATION OF STARTER, DISCONNECT AND ID INDIRECT DRAIN SOV SHUTOFF VALVE FIXTURES. SIZE IN ACCORDANCE WITH PLUMBING AND LOCATIONS OF MECHANICAL EQUIPMENT, DUCTWORK, <br /> DISC CONTROLS SP STATIC PRESSURE <br /> DRAINAGE INSTITUTE (PDI) REQUIREMENTS. PIPING, AND OTHER COMPONENTS. <br /> IE INVERT ELEVATION <br /> DISCH DISCHARGE IN. INCH SPKR SPRINKLER 2. REDUCED PRESSURE BACKFLOW PREVENTERS (RPBP): B. DIVISION 21, 22, 23 SHALL COORDINATE THE SUPPORT <br /> PROVIDE INDIRECT DRAIN PIPING FROM RPBP TO NEAREST SYSTEMS AND DESIGN LOADS FOR HUNG PIPING AND <br /> DN DOWN IN. WG iNCHES WATER COLUMN SS STAINLESS STEEL, SANITARY SEWER DRAIN. INSTALL FUNNEL AT RPBP IF REQUIRED. OTHER MECHANICAL SYSTEMS (INCLUDING COMBINED erlo REqSTERED <br /> DWGS DRAWINGS ST SOUND TRAP MULTIPLE PIPE RUNS) WITH THE GENERAL ARCHIIECT <br /> IW INDiRECT WASTE PIPING CONTRACTOR AND THE STEEL AND WOOD JOIST <br /> DV DRAIN VALVE 3. ACCESS PANELS: PROVIDE IN NON ACCESSIBLE CEIUNGS <br /> AND WALLS FOR VALVES, WATER HAMMER ARRESTERS, MANUFACTURERS IN ADDITION TO OTHER TRADES <br /> kW KILOWATT TDH TOTAL DYNAMIC HEAD CLEANOUTS, AND OTHER ITEMS THAT REQUIRE ACCESS THAT MAY BE IMPACTED. ����� <br /> (E) EXISTING TEMP TEMPERATURE TO PROPERLY MAWTAIN OR SERVICE THE BUILDING. <br /> REFER TO SPECIFICATIONS. <br /> EA EXHAUST AIR L LENGTH TG TRANSFER GRILLE <br /> EAT ENTERING AIR TEMPERATURE TOD TOP OF DUCT � <br /> LAT LEAVING AIR TEMPERATURE <br /> SCALE: AS NOTED <br /> EER ENERGY EFFICIENCY RATIO TOP TOP OF PIPE ISSUE DATE: O��Z4�2O�� <br /> LB LINEAR BAR <br /> EF EXHAUST FAN LBS POUND TOS TOP OF STEEL AC <br /> DRAWN: <br /> EFF EFFICIENCY LD LINEAR DIFFUSER TOF TOP OF FOOTING CHECKED: RE <br /> EG EXHAUST GRILLE LVR LOUVER TSP TOTAL STATIC PRESSURE <br /> EL ELEVATION LWR LOW WALL RETURN T'STAT THERMOSTAT (� THIS PLAN AND DESIGN IS AND REMAINS <br /> THE PROPERTY OF THE ARCHITECTS AND <br /> ELEC E�ECTRIC LWS LOW WALL SUPPLY TU TERMINAL UNIT MAY NOT BE USED WITHOUT PRIOR <br /> EMCS ENERGY MANAGEMENT AND CONTROL SYSTEM TYP TYPICAL CONSENT FROM THE ARCHITECT <br /> � EQUIV EQUIVALENT MAT MIXED AIR TEMPERATURE � <br /> ESP EXTERNAL STATIC PRESSURE MAX MAXIMUM UNO UNLESS NOTED OTHERWISE REVIEW <br /> EXH EXHAUST MBH THOUSAND BTU PER HOUR <br /> EXT EXTERIOR, EXTERNAL MC MECHANICAL CONTRACTOR V VENT PIPING, VOLT REV. DATE DESCRIPTION <br /> MCA MINIMUM CIRCUIT AMPACITY VA VALVE 05 26 SCHEMATIC DESIGN <br /> MECH MECHANICAL VD VOLUME DAMPER 08 15 PROGRESS DRAWINGS <br /> MERV MINIMUM EFFICIENCY REPORTING VALUE VEL VELOCITY O9 O$ PERMIT SET <br /> MIN MINIMUM VOLT VOLTAGE <br /> MOCP MAXIMUM OVERCURRENT PROTECTION �R VENT THRU ROOF <br /> MOD MOTOR OPERATED DAMPER <br /> W WASTE, WATT, WIDE, WATER <br /> W/ WITH <br /> WC WATER CLOSET, WATER COLUMN <br /> W�o WALL CLEANOUT M ECH AN I CAL LEGEN D Bc <br /> WH WATER HEATER, WALL HYDRANT G E N E R A L N 0 TE S <br /> WHA WATER HAMMER ARRESTOR <br /> WM WATER METER <br /> WSEC WASHINGTON STATE ENERGY CODE - <br /> WT WEIGHT <br /> • <br />