My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3927 RUCKER AVE 2018 Plans 2022-12-02
>
Address Records
>
RUCKER AVE
>
3927
>
Plans
>
3927 RUCKER AVE 2018 Plans 2022-12-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2022 10:37:34 AM
Creation date
11/6/2019 11:43:19 AM
Metadata
Fields
Template:
Address Document
Street Name
RUCKER AVE
Street Number
3927
Permit
B1804-013
Year
2018
Notes
REPLACE BLDG CLADDING EXTEND EXISTING ADD NEW ENTRY CANPOY
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' '��_ <br /> i <br /> � <br /> ' ( I <br /> i A2-02 „°� s; ", iN������I�� <br /> 3 <br /> i, � � � � � � � � I F ' ' � 1�� � �� �� �� � � <br /> I <br /> �� ( � <br /> �I� � � � ( I � � � <br /> I � — — <br /> � - - - - - - - - - - - - - E8 <br /> - - - - - - - - - - - - -� - - - <br /> ; I � � * PROJECT NOTES-nn � ( I ( <br /> i Coping-pn-1 <br /> � <br /> � 1. I Remove existing coping-install new coping and snap lock � <br /> , � flashing per detail-typical at ali sides of the building unless noted <br /> j I otheiwise j � � I <br /> I � 2. � Area of reduced parapet height(5"approximate clr ht)apply new <br /> I� coping per detail � <br /> 3. Existing coping at entry curtain wall glazing to remain-tie to new i <br /> coping per detail <br /> 4. Low roof beyond- prep and install new roof overlay-material to <br /> � Coping-pn-1 � I match existing system-verify carlisle epdm with decorative � � I I <br /> ballast,coping and associated wall flashings per details G U N D E RS O N <br /> ' 5. Existing entry canopy beyond-basic scope-remove existing � <br /> , Kalwall and store for re-use.As necessary to install the new <br /> I I work-Cut and remove 1 ex isting sloped frame against the <br /> ' � e�erior wall-Re-assemble and reinstall following cladding work. Y V 1 L D 1 N G <br /> � <br /> ' I � � Substitute new AEP span Select seam narrow batten roofing � � I I <br /> panels for e�sting corrugated metal roofing panels Q <br /> , _ _ _ _ _ _ _ _ _ — — — New sloped sill_AEP Span flush metal or Select Seam Narrow- — — — — — — — — — — — — — �V <br /> Batten panels-carry tight to exterior wall(with windows)tuck � �����D <br /> below existing window sill flashing-extend as necessary. Carry <br /> projected sill across intermediate columns at contiguous recessed <br /> , I ( � window conditions-Continuous head flashing at the top of � I i � <br /> contiguous window recesses placed at intersection of soffit and ; �p� <br /> � furthest exteriorwall. Typical at alt recessed window locations. j 3927 Rucker Ave, Everett, V Va <br /> 7. Existing bus stop-temporarily remove exisiting railing-reinstall <br /> ', following completion of the work in that area. Coordinate with <br /> '�, Community Transit. <br /> ';� � � 8. I Excavate along builidng-6-12"down 8"min from bldg-place I I I I <br /> � retaining mtls per detail,drain pipe and drain rock to maintain i <br /> separation from bottom of cladding to grade.Tie to existing <br /> footing drain-Alternately provide 12"diameter drywell 2'deep in <br /> landscaping.Det 02/A3-01.b 1 A2-01 <br /> � I A2-02 2 OPMD 0.0.18 � a. Minor adjustment of existing grade at building to create ; <br /> � � I drainage swale at area indicated to the south side of the � I I I <br /> A3-03 building. <br /> , 9. Typical recladdin work below existing curtain wall element. <br /> ' _ _ _ — — — — — — — — 10. —t i coo " es an ensi � to r ' pera�onal — — — — — — — — — — — — — — �� <br /> ', � , during all constructio activities. lash existing sheet met cover ' <br /> I with new sheet metal flashing per detail 04/A3-01 b � I I <br /> , � I I 11. � Temporarily remove exisitng canvas canopy at 1 st flr East si e- � <br /> �, OPMD 0.0.21 OPMD 0.0.20 Reinstall at completion of work <br /> , 12 , Sign Location-confirm location of mounting points for the , <br /> A3-03 Sim A3-03 � ' existing sign to be reinstalled-coordinate with owner. Trea ' _ _ <br /> _ I _ _ _ ; _ _ _ _ _ _ _ _ mounting points in conformance with Dryvit details. — — — — — — — — — — — — C5 <br /> I 13. I Own t onfirm e �ment s� e d rou ening r � ed for I I 04 25 18 <br /> � ceme . Ver t wall � g is fr to this I I <br /> , criteria,and modify as required to conform if not.This minimally For Construction . <br /> �, Low roof-,pn-4 requires a head track at the top and double studs at the jambs of <br /> � � ( � the required opening. � <br /> 1 � 14. Continuous metal flashing at transition from 4"to 2"rigid � <br /> , `� � OPMD 0.0.18 � � w ndowsn Typ cal weferhto detai A3II01 a dition of the first floor I � <br /> I Coping-pn-1 ( <br /> ��, \ \ , 03 15 Contino eal ali ith the ashing �ions at � <br /> , i A3 i reces o the 2n rd floo e detail 0 - 1a ��� ���������� <br /> . ' \ -- — — — — - — — — — — — — — — — — — — — — <br /> Bn — — — 16. Paint concrete sidewalls and rails at level landing to existing <br /> ' garage and the curved connecting stair.- - ������� T <br /> , I I I 17. ( P int all exteri r hollow met I doors in are s of new EIFS to � I � <br /> , tch ne colors i al ,� <br /> i Coping-pn-2 1� *Project notes are referenced from multiple drawings in this ; � � _ <br /> �� drawing set. � <br /> � <br /> � I I I � � i � <br /> � i <br /> RAL�'i� 'wIV`. A►L�Ef� <br /> � <br /> , <br /> �T��� ���+A�HI���+��1 <br /> � <br /> , - - - - - - - - - - - - - - - - -�-- - - - - - - - - - - - - - B4 <br /> , <br /> ; , , , , , , � ► <br /> � <br /> , OPMD 0.0.21 <br /> I <br /> A3-03 Sim � <br /> I I I � � <br /> � � I I rev-1 - date-topic addendum 1 -05 09 1 <br /> — — — — — — — - — — -- — - — - — —+— — — — — — A7 rev-2- date-topic <br /> — — — — — — , <br /> , � � rev-3 - date-topic <br /> I Coping-pn-3 I I � � ( I � <br /> rev-4-date-topic <br /> 01 <br /> 3-01 rev-5 - date-topic <br /> Coping-pn-1 <br /> � � � � j I I � rev-6-date- topic <br /> � <br /> � � <br /> � - - - - - - - - - - - - - - - - - - - - - - - - - - - - - A1 <br /> i i i i , i � � <br /> I ! <br /> � <br /> I <br /> � i i i i i � i <br /> � <br /> 8 7 6 5 4 3 2 1 <br /> 2 <br /> A2-01 <br /> ROOF <br /> � 1/8" = 1'-0„ <br /> ROOF PLAN <br /> � <br /> EVOLUTION <br /> ARCHITECTURE - INC <br /> 6264 ELLIS AVE S <br /> Seattle, Washington, <br /> � ph 206 588 <br /> info@evolutionarchitecture.net <br />
The URL can be used to link to this page
Your browser does not support the video tag.