Laserfiche WebLink
�� � - ��������� <br /> w <br /> :, ��� � �� � � � � ��� � � <br /> , 1 2 3 4 5 g 7 8 . <br /> i e� Coping-pn-1 <br /> j wl 3 , <br /> �� scupper scupper � <br /> � <br /> - — — — — — R-F-� <br /> _ — — — — — — — - — - — -- 48' - 5�� <br /> — — — — -�- — — — �- — — — — =�=;-� <br /> i ' � � vert joint-typ <br /> � � <br /> � 2 � � � � � I <br /> � � , � - <br /> ext , <br /> wl3 i ; � I <br /> Siii- <br /> � � Louver � G V N D E RS� N � <br /> � � <br /> � , � � , � � � , � � , <br /> � � � � ; , , � , � � I i ' ; � i � ; � ' �= � LEVEL 3 � <br /> � — — — — — — — �— �'" — — — — ° ° — — — — — — n-14 '�'� i �� � 33' - 0" � � � �� � �� � <br /> r, � �� � pn-14 � p i� <br /> � � Sign pn=1 <br /> N � � i � � Canopy-pn-5 <br /> :t � �_/�1 � <br /> � <br /> o - - - -- <br /> - - � <br /> � � � _ , r , . , � � , RECLAD <br /> � _ <br /> � _ � <br /> � � e� , <br /> J o wl2 ; , � � <br /> U j i� <br /> N � I I i <br /> � 3927 Rucker Ave, Everett, Wa <br /> . � i � � � � i i � � � � � � � I � � � ' � � i i � I � � � � i 1 � � � I ii I � � . <br /> � — � � — — — — — — — — — — — — — — LEVEL 2 <br /> — � - <br /> — — — — 0 <br /> — 18 <br /> _ _ _ — — — � <br /> �; <br /> � <br /> �� pn-14 � � <br /> i � � pn 14 <br /> �I I � I I I � I I E�stin li ht I I <br /> �� � �isting �-- Existing g g � ; <br /> �� � � -+ Canopy pn- 11 e� ext <br /> � � � pn-10 � ; /.� w11 wl 1�: <br /> o �, � L� � I <br /> � <br /> Q � I � � � ° � � - - - paint � � - <br /> �.� � , � , � � pn-10 � � � - i i � � � paint <br /> � c ; � � i � � � / I <br /> o � � � <br /> J v � pn-10 � i pr t - � - � . <br /> � � _�___' � `� - precast - , precast LEVEL 1 <br /> - u — <br /> � , � ; — — — — _ �,� — — <br /> ! —� � — — — — — _ — -- _— — _ — —_ —, � — — — — — — — — — <br /> � —� — — — � � ,— �— � , ,—� � � — ; � � �— _ � ;_, ,_ — _ — —� 04 25 18 <br /> — — — _ — — ;_ ; _ _ _ _ _ <br /> � I — <br /> ' I � i � i I I ' � - <br /> - - - I - - - - - - - - <br /> i - I- - <br /> - - � <br /> ' � � - <br /> - � � <br /> i I i - I -) - - - <br /> i —I �— <br /> — I— — � — — <br /> � <br /> —I � r i n <br /> n uct o <br /> � - I r st <br /> i Fo Co <br /> — ,� , <br /> � � — <br /> II i <br /> i , I — — — — — — — — — <br /> , , I � <br /> - 1 - _ � - <br /> Ii —� � I , � � � � � — — — — — — — — � — — — — i — — -- <br /> — — � � — — — — — — — — — �— — � � — <br /> — — � —� — — — — —� — — � — � — � i i — — _ _ — — � — , �— — — — <br /> � —I —I — — — — i I — — — — — — — — � — <br /> � — — — I— — — — — — I <br /> � I �— — — I� —I — — � � — — — — — — — — — — — — � i --- — — i � <br /> -!I , �- - - ; - -� � - - - - , - - - - - - - - - - - - - � - _ � �_ � � � <br /> E - - - - - � I - I � I - �- I <br /> � � -i - � -� � �- � � � _ - - - � - - I - _ - - - _ - � �- - - - - , � � � � �-� � � � � � � � � � � � � � � � � � � � � � � � � � � <br /> � ,_ � i I <br /> �-� - - - - <br /> � ' I , , , , ' , � �-����� ���_ � � �--� � � I � �--� � � ��� I I � � I I—� ! � � � �—� � � � � � � � �--I � �—� � �—� i �I� � �=� � � ' � � t—� � ! � � � � � � � � � I � �—� � �—� � �—� � � � � �—� � �—� � � � � � ��� � � � ���—� � � � � � � � �—� � �—� � �—� � �—� � �—� � I—� � �—� � � � � � <br /> �+�� �'l�'1,��t���fl�� <br /> �I��r���4��1 <br /> jp'' <br /> � f+ <br /> R�4L�'F� V'�. ,�'L�E�J <br /> '`PROJECT NOTES-pn +�"i`�'T� ��' 1��,����"��� <br /> C .I 1. Remove existing coping-install new coping and snap lock <br /> ' ,Eg D8 D 1 `,'�J 69 B4 A7 � I BASIC WORK-EIFS CLADDING flashing per detail-typical at all sides of the building unless noted <br /> ��`'�----� otherwise <br /> -----� <br /> ---� A. Remove existing cladding (including stone plinths 2• Area of reduced parapet height(5"approximate clr ht)apply new <br /> I vert jt . � - ��,_�```- � co in r detail <br /> Coping-pn-1 Copmg-pn-3 . , as several locations around the building.)and p g� . <br /> � ��----__.._ � sheathing to expose existing framing and 6"batt 3. Existing coping at entry curtain wall glazing to remain-tie to new <br /> ' � C . � . coping per detail <br /> -..� E insulation. <br /> - - _ _ _ _ _ ROO� B ' ' � � B. Install new 5/8"Dens Glas Gold sheathing and 4. Low roof beyand-prep and install new roof overlay-material to <br /> I � �� scupper —�� —� T � scupper � 48� 5�� o.� � A . ',,�;� � approved wet applied wrb materials(same as at match existing system-verify carlisle epdm with decorative rev-1 - date- topic addendum 1 -05 09 18 <br /> vert jt � = � `» �- ,%,„/ ,% i eifs) ballast,coping and associated wall flashings per details <br /> � 5. F�cisting entry canopy beyond-basic scope-remove existing <br /> . � ' �" � r C. Install new AEP Span Select Seam standing seam rev-2 -date-to ic <br /> vert jt �/ vert jt vert jt � � ~� � � + metal anel claddin -assume 20"wide anels, Kalwall and store for re-use.As necessary to install the new p <br /> f <br /> P <br /> 9 <br /> P <br /> u� � <br /> I � f i � Di j �F`'�; � centered-run continuous across all contiguous work-Cut and remove 1 ex isting sloped frame against the <br /> , � � � _ (� 1 � window recesses. e�erior wall-Re-assemble and reinstall following cladding work. f@V-3-dat@- tOpIC <br /> I Substitute new AEP span Select seam narrow batten roofing <br /> � � � �. %B 1 ' , D. Install new Dryvit Outsulation MD system in anels for existin corru ated metal roofin anels <br /> c � - � ; 1 thicknesses noted on the drawings- P g g g p rev-4- date- topic <br /> �= Sill- �.. '`-=� � �' 6. New slo ed sill-AEP S an flush metal or Select Seam Narrow <br /> M � � � -�, � f • Refer to Dryvit details OPMD 0,0,01,02 p P <br /> � � ' I � '�- � � r'�y and 06/A3-02 for t ical manufacturer's Batten panels-carry tight to exterior wall(with windows)tuck <br /> �o � ! , i ; , , , , � �` � `"j ;? .� details yp below existing window sill flashing-extend as necessary. Carry rev-5-date- topic <br /> N � • assume two finish colors- projected sill across intermediate columns at contiguous recessed <br /> � �� � � �' � Canopy-pn-5 I LEVEL 3 � , window conditions-Continuous head flashing at the top of rev-6 - date-topic � <br /> �, � � I _ _ � Install precast concrete accent panels at <br /> ' '� — — — — � 33� - ��� the three building entrances as indicated. contiguous window recesses placed at intersection of soffit and <br /> J U�- � � furthest exterior wall. Typical at all recessed window locations. <br /> N , � �.. O 7. Existin g bus sto p-tem poraril y remove exisitin g railin g- reinstall <br /> � BASIC RECLADDING WORK following completion of the work in that area. Coordinate with <br /> � �� _ � �� Communit Transit. <br /> 1/4 - 1 -0 y <br /> 8. Excavate along builidng -6-12"down 8"min from bldg- place <br /> i retaining mtls per detail, drain pipe and drain rock to maintain <br /> ! separation from bottom of cladding to grade.Tie to existing <br /> Low roof-pn-4 , footing drain-Altemately provide 12"diameter drywell 2'deep in <br /> I _ _ o "EIFS"NOTE landscaping. Det 02/A3-01.b <br /> ���� ; , , � ! � j � ; � ; , precast � p c�s � a. Minor adjustment of existing grade at building to create <br /> ( � scupper �' tEV EL 2 Use of the EIFS label on these drawings relates directly to the drainage swale at area indicated to the south side of the <br /> - — — — — — — — — � 18� - 0'� specified Dryvit system:Outsulation Plus MD System. The details building. <br /> contained on sheets A3-02,A3-03 and A3-04 are the manufacturer's g. Typical recladdin work below existing curtain wall element. <br /> ' � —i —i , —; : ;— �— standard details for a wide range of conditions that exist at the i ' to r era'onal � <br /> � ��i i — — — 10. i coo ' es a ens <br /> pn-14 ; � — — — _ — <br /> Gunderson building. These details illustrate the typical application during all constructio activities. lash existin sheet met cover <br /> � o � � �__ —_ — I� ; — -- and installation requirements for the specified product. Other project with new sheet metal flashing per detail 04/A3-01 b <br /> � :_ ' -� ' ( �� Cano n 5 � � �— — I � I — — — II —� I — specific details or scope notes that may conflict with the requirements 11. Tem oraril remove exisitn canvas cano at 1st flr East si e- <br /> c�o cv � � � I PY-P - — — � i — �i <br /> � � � � _ _ _ _ _ of these standard details will be brought to the attention of the p y g py <br /> � �� vert jt I—= I—=_—_ ___—_ Architect for clarification and resolution. Reinstall at completion of work <br /> 12 Sign Location-confirm location of mounting points for the <br /> o N , I — — — — I— existing sign to be reinstalled-coordinate with owner. Trea <br /> a F I � 13. Ownntl tg ponf rm econment s' e W'd f ou�t deening r � ed for <br /> � � ' � �� � � � � ' � � ! —�— —_ I— I --}— I =—_—_ 1 <br /> � U /� �\ i' � — I—I I _ —I _ _ _ I _ EIF�S NOTE ceme . Ve t wall g is fr to this — <br /> J � _ — �_ _ _ I— 1/4 - 1 0 requ�es a h adtl ack at he t p and doublelst ds at'the jambslof <br /> � <br /> precast �� o - recast — I — —) I--_ — � ' �— <br /> , <br /> , �, — the required opening. B L D G E L EVAT I O N S <br /> � � '_ _ — � �_� _�VEL � 14. Continuous metal flashing at transition from 4"to 2"rigid <br /> � - - I�� _ _I — — = Q"_ insulation aligned with the bottom sill condition of the first floor <br /> I I I ' i � — — — —i - ' -t--I -- I I I I —_= I—� I I—, — I I—_ windows.Typical-referto detail A3-01a <br /> � �=� — — — �— — — — — I �— ; — � 15 Contino eal ali ith the ashing 'ions at <br /> � ' I�'I, 'I I �— I— —I I � � �_—_ _—� � __ _� I—� I--— I —I-- _ ' reces o the 2n rd floo e detail 0 : 1a <br /> � - - li- I - - -� _ <br /> � j, I ; � � I — � — — — — — � — = I =; , _ _ — I — —___ 16. Paint concrete sidewalls and rails at level landing to existing <br /> � � �—�_—=I—_— <br /> ' I'� � �— �— — — �( �I� — I — ' — _I _ �— I � — — I —I — 17. P in9all exterer hollow metl doors in are s of new EIFS to <br /> _ I I I—�— I-��— ____=I I—I —_--i i I -- — — _— — — i �— — — — — —� — �— —I � !— tch ne colors i al <br /> _ � � � � �— — � , , � — I , � � � I �— — <br /> — — — — — <br /> , , �— — — , � � � , , � � � � —I � � � � � � — <br /> - � ,- � � , , I��.t������� — — — —. �- — - . � , � � — —i � � <br /> 1/8° = 1�-0° 1� *Project notes are referenced from multiple drawings in this � <br /> drawing set. <br /> EVOLUTION <br /> ARCHITECTURE - INC <br /> 6264 ELLIS AVE S <br /> Seattle, Washington, <br /> ph 206 588 <br /> info@evolutionarchitecture.net <br />