NOTES FOR DETAIL 02/A3-01
<br /> NOTES FOR DETAIL 03/A3-01
<br /> 1. Existing parapet wall-Confirm sloped substrate is intace .:�a�- - '
<br /> .,�_ ,�,---
<br /> � 6 3 6 and adequate to cover new conditions n�'�'�` �W� 1. New EIFS application with drainage detail per manufacturer's
<br /> g 2. Existing EPDM roofing membrane-verify extent over E � standards-See Detail OPMD 0.0.24/A3-03 for Dryvit system
<br /> g existing parapet- � _ , ; assembly requirements :_' ` ����� ��
<br /> 3. New parapet membrane over top of assembly-confirm � 2. Metal head flashing-flash into EIFS system per '�� � r
<br /> � '
<br /> , �
<br /> � --° �"' �. ,.
<br /> compatibility with existing EPDM roofing • , r manufacturer's standard details- �"
<br /> � 4. 2"x 6"+-EIFS"feature"strip at coping-coordinate , - � • This detail runs continuous across intervening(2'-3' �
<br /> - �_. -�--�.���- _ � � � f�� � I T � � T� � �
<br /> �. �������"��'������ .. �``\ bottom with bottom of e�sting scuppers and top of sloped � � �� � � w)wall areas between recessed window areas as
<br /> �T~� , � ' ~ 't � , j � surface to cover the upper joint at the existing scuppers ! indicated on the elevations.
<br /> - .� 1 -- ,\ 5. Continuous metal cleat � provide closed up end dams at transition to main
<br /> l ";� ! � {��,,,�-, f� '�� '� 6. New metal coping in coated steel colorto match existing. � all su
<br /> 4 � � '' �` ; 7. New snap-lock type flashing at roof side of parapet. - 4 3. ain or a e existi s ffit an � II detail s ng
<br /> `_-.._,� � � .�" , p
<br /> .� � -��
<br /> I "�---..�`�--; $� � ,, �ti ,� � Canflrm configuration with metal flashing fabricator. � -�� area indicated. Contractor to verify. Provide sealant joint at
<br /> 4
<br /> a � � ` Y-�` � ^� . .��� 8. "EIFS°- See details: � _. � ' . 'f_ juncture of soffit EIFS and through wall head flashing.
<br /> , '� , , e - ,,�.� � :� • OPMD 0.0.19/A3-03 for Dryvit detail requirements j - 4. at the level 1 &2 windo recesses -2 x 1/2 rev al detail- .
<br /> � � �� �� , �, �, ! .�'" -., at roof co in , -. w � � � ali n � d fla � Int�o' c tinuo e een `
<br /> 5 � � � � � � '� ; � ��� '1, � ��, � � � _'-'�"� � .����� � • OPMD 0.0.20 for parapet sidewall conditions at ��`� �``� �:�� �: _ � �� �� wigdow recess conditions and at main wa -entire perimeter �
<br /> �
<br /> � � � �� ± ` � ������ �'� � '; ` 7 � � the lower roof& 3 ---"�-����''�� ``�-t �� �� � � of the building. See Detail OPMD 0.0.41 for Dryvit assembly
<br /> � �G ' �' � ' > �' � OPMD 0.0.44/A3-0 for ry it r q irements at '� -� � ments at decora iv recesses. •
<br /> . � .� ; x '
<br /> -
<br /> �
<br /> 4 D v' e u' re uire p e
<br /> �
<br /> t � s � i �" �` q
<br /> � � .� , �� decorative feature �'`�- ' S. Rod, Sealant and Wee s
<br /> � '� � ` 2 9. New 3 sided flashing collar at existing scuppers to ' 5 �
<br /> , . ,
<br /> � , '_
<br /> § '� ; �, � � ; LL remain-set to allow 1/2"rod and slnt joint to existing rovide rod and 2 �
<br /> p ; 1/2�.
<br /> � ��,,��-�.,.- �
<br /> � ' I� � �� '' �- scu er metal. ,_-.- sealant joint at this
<br /> R r � �., �, � � Pp location 2
<br /> � ; 1 , , � �, ���� �� �.�._,�� � � 4
<br /> � �: , ;, .� � �_ .3- 2114„ � �
<br /> � :; � �� � M � �'�°- � verify -
<br /> y � � �� �;�x� _ (V
<br /> �'
<br /> I � � �� ! ��`�� y � G ./ �
<br /> �. .., s, R� � � . ,� .- `i �. � 10 3/4��
<br /> CV� �
<br /> � � � � � 6��� GVNDERS� N
<br /> M M
<br /> N -� �
<br /> :«:
<br /> N
<br /> � �X BUILDING �
<br /> 02 COPING 2 1/4° �, � ;; 03 WINDOW RECESS HEAD �
<br /> 1 1/2" = 1'-0" ° 1 1/2" = 1'-0"
<br /> �
<br /> �
<br /> RECLAD
<br /> NOTES FOR DETAIL 04/A3-01 3927 Rucker Ave, Everett, V VC�
<br /> 1. Remove existing EIFS and sheathing at sloped sill. Install ��` �7i�„ ,
<br /> �"'�� ' t new 5/8"densglas gold sheathing and wrb materials. No �
<br /> _
<br /> ;��_.��s i , -`� =-- ;
<br /> new rigid insulation at the sloped sill condition.
<br /> ��` '��-�, � � � '1"" i �->-��"� 2. New EIFS application with drainage base detail(Rod, 5 �
<br /> v_.�. , �-�= .
<br /> �`"�� �� 4 I � � � f Sealant&weeps)at metal flashing termination per q, 2^
<br /> �i 3 E � 2 ,r � manfucturer's standards, �
<br /> �.= � �' '�--��- f � 3. Existing window-provide new rod and sealant joints at
<br /> head,jamb and sill 2��
<br /> �i _ _�f----''f ''� � J j 4. Existing sill flashing-verify dimensions and clearance �' 4°
<br /> ��� +� �' �,-�" � �� _ � � below ��
<br /> - �- � 2` ' � � ' 5. Standing seam metal at sloped sill condition
<br /> ' '���;:-J �`� � • install below and tight to the back of the e�sting
<br /> �- �� j'�. I sill flashing(3) 7� �j "' � 6
<br /> I I . ...... '1 ' � '��f :. � �kf '"A _
<br /> j �� � i � , � . • provide manfacturer's standard closure at head- Ver. -
<br /> •; � 1 ' f� ;! ; � � 5 �•; � } verify with mockup that this element will install ��
<br /> ; �� � �.. ,; ` =�; .� ,
<br /> •�` �� �, = �, ;, � � � �� � under the existing sill flashing (3) 2
<br /> = �� ,,,� - I� � i,E ; � `��, �'"���' � � Turn standing seam cover down to vertical leg
<br /> �-, � � _ � � �� '� ( � � f�� � ,='� 6. Through wall flashing at transition New gwb/wrb
<br /> �.� L � ',, ' �`� � • Condition shown is at 4"to 2"insulation and is 5
<br /> �J i �" �� � �
<br /> 04 25 18
<br /> � � � - =�" continous at the bld perimeter at this level
<br /> ,,� � � , � g
<br /> 6 s� �; ��� � f ��h � ;` � -2"to 2°condition at window recess"columns"
<br /> �`� � � �� f only is similar
<br /> For Construction
<br /> � �� 1 � � : . Align with and overlap at standing seam metal
<br /> ' 1` sloped sill(4)
<br /> I f � � Flash into EIFS system per manufacturer's details
<br /> ( i i�( �I �
<br /> S E � j � 'k '� .
<br /> i � �
<br /> � � '� �� y '�' -� SILL AT SLOPED SILL CONDITION
<br /> . ..� '� _
<br /> � � �� i l � �ya, � t �
<br /> , .
<br /> 4��� R��I�T�R��
<br /> ' A�R��i��'��T .
<br /> oz
<br /> 3-01 a
<br /> - ,� :
<br /> � SILL - - - - -
<br /> U 1 1/2" = 1'-0"
<br /> � -- � F�ALP't� 'W. �►LLEf�
<br /> ' ROOF ��A7E �� �VA�I-i����`�I''�+l
<br /> - - -� 48' - 5"
<br /> x � - - - - - - - -J
<br /> PROJECT NOTES -pn
<br /> 1. Remove existing coping-install new coping and snap lock
<br /> NOTES FOR DETAIL 05/A3-01 flashing per detail-typical at all sides of the building unless noted _ _ _
<br /> otherwise
<br /> 2. Area of reduced parapet height(5"approximate clr ht)apply new
<br /> 1. Prep grade at"slot"between building and Community Transit bus top coping per detail , , 03 rev-1 - date-topic addendum 1 -05 09 18 :
<br /> stem wall-install vapor barrier and"raY' slab. 3. Existing coping at entry curtain wall glazing to remain-tie to new
<br /> 2. �isting EIFS to remain below window recess coping per detail 3-01 a
<br /> 3. new EPS Foam insulation fill void completely to bottom of new gutter 4. Low roof beyond-prep and install new roof overlay-material to _ _ _ _ _ _ _ f6V-Z- dat@- tOpIC
<br /> 4. New PVC coated metal gutter(from Duratech roofing or equal) match existing system-verify carlisle epdm with decorative
<br /> seamless across full length of gutter- ballast,coping and associated wall flashings per details rev-3-tlate- topic
<br /> • Drain gutter from North end to South-Extend 2-3"at the outlet 5. Existing entry canopy beyond-basic scope-remove existing
<br /> end Kalwall and store for re-use.As necessary to install the new rev-4-date- topic
<br /> • Verify slope that can be achieved in this configuration. work-Cut and remove 1 ex isting sloped frame against the
<br /> � • Where welded laps need to occur they will be lapped in the e�erior wall-Re-assemble and reinstall following cladding work.
<br /> direction of drainage Substitute new AEP span Select seam narrow batten roofing � rev-5- date-topic
<br /> 5. Counterflashing into gutter panels for existing corrugated metal roofing panels 04 �
<br /> � � a. to metal flashing and standing seam roof at buildng and 6. New sloped sill-AEP Span flush metal or Select Seam Narrow � 3-01 a rev-6 - date- topic �
<br /> = � b. to saw-cut reglet/sealant set counterflashing at stem wall Batten panels-carry tight to e�erior wall(with windows)tuck
<br /> side. below e�sting window sill flashing-extend as necessary. Carry
<br /> 6. Continuous metal flashing at transition between 2"and 4"rigid projected sill across intermediate columns at contiguous recessed - - - �
<br /> insulation-typical between areas of recessed windows. window conditions-Continuous head flashing at the top of LEV 3
<br /> contiguous window recesses placed at intersection of soffit and 33� - 0"
<br /> # furthest exterior wall. Typical at all recessed window locations.
<br /> ,� , 7. E�sting bus stop-temporarily remove e�asiting railing-reinstall
<br /> � °� following completion of the work in that area. Coordinate with
<br /> #
<br /> ��� � 3�.� `u Community Transit.
<br /> � �-� � - r -�� ' , r 8. Excavate along builidng-6-12"down 8"min from bldg-place
<br /> � '���g retaining mtls per detail,drain pipe and drain rock to maintain
<br /> ;,-; ;� , �� _ separation from bottom of cladding to grade.Tie to existing
<br /> � t:�
<br /> £� � ��� ���� 5b � 5a footing drain-Alternately provide 12"diameter drywell 2'deep in
<br /> _.. �� � • � landscaping. Det 02/A3-01.b
<br /> ,� ����k � , � �
<br /> a. Minor adjustment of existing grade at building to create
<br /> ���r � �`� �����a ��. ��.a, y drainage swale at area indicated to the south side of the
<br /> �� `� ��"���,� -�� � � _ � building.
<br /> �� k� �'�� � " � /� 4 _ 'v 3 9. Typical recladdin work below existing curtain wa(I element. �
<br /> 5�- j N 10. i coo ' es an ensi ' to r pera"onal i
<br /> '� � � during all constructio activities. lash existing sheet met cover j- - - - - - - - - - -
<br /> 6" > with new sheet metal flashing per detail 04/A3-01b �� �
<br /> 11. Temporarily remove e�asitng canvas canopy at 1 st flr East si e-
<br /> �4'� � Reinstall at completion of work � � 05
<br /> � 12 5ign Location-confirm location of mounting points for the I � 3-01
<br /> �;ti� e�sting sign to be reinstalled-coordinate with owner. Trea ,
<br /> u�
<br /> � mounting points in conformance with Dryvit details. I I
<br /> 13. Own t onfirm e �ment s� e d rou ening r � ed for
<br /> � ceme . Ve t wall � g is fr to this ' LEVEL 2 D ETAI LS
<br /> � 2 criteria,and modify as required to conform if not.This minimally , _�$' - �"_
<br /> 3 requires a head track at the top and double studs at the jambs of - - - -) - i � � � � I
<br /> the required opening. - - --
<br /> 14. Continuous metal flashing at transition from 4"to 2"rigid - - � --
<br /> -
<br /> insulation aligned with the bottom sill condition of the first floor - '
<br /> windows.Typical- refer to detail A3-01 a _ _ _-
<br /> �, ., 15 Contino eal ali ith the ashing �ions at I- (
<br /> , � ,Y� � � reces o the 2n n rd floo e detail 0 - 1a - - - -
<br /> ' � :� � ��-_�� ,��:�' 16. Paint concrete s�dewalls and rails at level landing to existing �
<br /> � garage and the curved connecting stair. I I-I I I-I I I-I I I-I I I I I I-I �
<br /> �.� 'u 17. P int all exteri r hollow met I doors in are s of new EIFS to
<br /> . .�:
<br /> , �. ._..
<br /> tch ne colors i al
<br /> 1� *Project notes are referenced from multiple drawings in this �� EXTERIOR WALL SECTION EVOLUTI ON
<br /> � drawing set. 1/4 - 1 -0 ARCHITECTURE - INC
<br /> 6264 ELLIS AVE S �
<br /> Seattle, Washington,
<br /> �� BUS STOP GUTTER ph 206 588
<br /> 1 1/2" = 1'-0"
<br /> info@evolutionarchitecture.net °