My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
20 SW EVERETT MALL WAY Geotech Report 2018-01-02 MF Import
>
Address Records
>
SW EVERETT MALL WAY
>
20
>
Geotech Report
>
20 SW EVERETT MALL WAY Geotech Report 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2022 11:57:23 AM
Creation date
11/18/2019 7:58:25 AM
Metadata
Fields
Template:
Address Document
Street Name
SW EVERETT MALL WAY
Street Number
20
Address Document Type
Geotech Report
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
^ Campbell-Fleury Investments/Mallwest CPnter W-3103-1 <br />9 April 1986 Page 2 <br />2.0 PROJECT DESCRIPTION <br />The project site is located at the intersection of Everett Mall Way and rloward <br />Avenue in Everett, Washington. The site is roughly triangular in sfiape, and extends <br />roughly 390 feet in the east-west direction and 195 feet �n the north-south direction. <br />The lot size is approximately one acr•e in plan area. The proposed project calis <br />for the construction of an office and light warehouse building. The proposed <br />structure would be a twe-story, wood-1`rame, slab-on-grade building. The building <br />— will occupy the western portion of the triangle-shaped parcel. The remainder of <br />the site will be landscaped or asphalt-paved for parking and access roads. <br />The purpose of tfiis study was to establish general subsurface conditions at the <br />site from tahich conclusions and recommendations for foundation design and <br />construction for the project could be formulated. The scope of work consisted of <br />field explorations, geotechnical enginee-ing analyses and report preparation. In <br />the event of major changes in t5e nature, design or location of the structures, the <br />• conclusions and recommendations contained in this project snould be reviewed and <br />- modified as necessary, to reflect these changes. This report has been prepared for <br />- the exclusive use of Campbell-Fleury Investments and members of their design team, <br />for specific application to this report, in accordance with generally accepted <br />geotechnical engineering practices. <br />3.0 SITE CONDITIONS <br />Site conditions were evaluated for this studv on 3 April 1986. The surface and <br />subsurface conditions are described below, while the exploration procedures and <br />� interpretive logs of ttie explorations are presented in Appendix A. The proposed <br />- site development plan and the approximate locations of the explorations accomplished <br />�-- for this study are indicated on th� Site and Exploration Plan, Fiyure 1, <br />�. 3.1 Surface Conditions <br />„ The topography of the site is relatively flat-lying. Dec�duous trees were noted <br />along the west side and eastern third of the site. The remainder of the site is <br />occupied by grasses and low-lying shrubbei�y. A culvert runs diagonally beneath the <br />
The URL can be used to link to this page
Your browser does not support the video tag.