Laserfiche WebLink
Background <br /> The original contract scope of services provided for design and preparation of a single construction <br /> document package for sewer system replacement and capacity improvement in three separate <br /> locations,referred to as L-North;L-East(now indentified as East Grand);and Hayes Street <br /> Combined Sewer Overflow(CSO)Reduction at SRO2.Previous contract amendment <br /> authorizations provided for additional hydraulic analysis and design services related to the"L-North <br /> project area and systems downstream,as well as tributary systems to the Siphon Headworks that <br /> affect CSO at SRO2 and SRO1.This amendment is for additional requested design and hydraulic <br /> analysis services for East Grand sewer replacement and stormwater separation and Hayes Street <br /> CSO Reduction(at SRO1 &SRO2),but also includes budget adjustments for previous <br /> authorizations related to deleted,un-used,or tasks that are modified by this amendment. <br /> East Grand Sewer Replacement and Stormwater Separation <br /> Design and construction plans for the East Grand combined sewer system replacement project are <br /> 60%complete. (Originally designed as a part of the sewer system"L-North"construction <br /> documents that were split-out,i.e.completing design and construction on"L-North"and deferring <br /> the other project area improvements as a future separate bid package). <br /> The City now desires to 1) separate the storm drainage and sanitary sewer flows within the East <br /> Grand area,2)replace additional segments of combined sewer,and 3)prepare final design and <br /> construction documents for the sewer replacement and storm water separation improvements. <br /> (Refer to Figure 1) <br /> The scope of services in this amendment for the East Grand Sewer Replacement and Stormwater <br /> Separation Improvements provided for: <br /> • Preliminary design for replacement of additional existing sewer system: <br /> o 8-inch main on E.Grand Avenue from 21'Street to 20th Street. <br /> o 8-inch main in alley between Cleveland/East Grand from 21st Street to 20th Street. <br /> o 8-inch main on 21st Street from alleyway to Cleveland Avenue. <br /> o 8-inch main on Cleveland Avenue from 21st Street north to end of system. <br /> • Performing hydraulic analysis and preliminary design for installation of a new separate storm <br /> drainage pipe network comprised of catch basins,stormwater treatment facilities,and <br /> underground pipes for separating stormwater from the sanitary system within the proposed East <br /> Grand project area. <br /> • Performing final design and preparation of two separate sets of construction documents(plans, <br /> specifications,and cost estimates) for the East Grand Sewer Replacement and Stormwater <br /> Separation Improvements anticipated being bid and constructed separately over two consecutive <br /> construction seasons.Services include support for Public Involvement and Construction <br /> assistance for each of the two project phases. <br /> Sewer System Replacement and Capacity Improvements Project 2 <br /> otak <br /> K:\project\31500\31520\Contract\Amend4\AmendFour\AmendmentFour021413.docc <br /> 3 <br />