Laserfiche WebLink
1 <br /> Exhibit A-5 <br /> City of Everett <br /> Amendment No. 4 <br /> Sewer System Replacement and <br /> Capacity Improvements <br /> Scope of Services <br /> Otak Project 31520 <br /> Proposed services are provided as an amendment to professional service agreement, dated • <br /> September 16,2009 between Otak,Inc. (Consultant) and City of Everett(Client). <br /> Table of Contents <br /> East Grand Sewer System Replacement and Stormwater Separation 6 <br /> 1.0 Preliminary Design 6 <br /> 2.0 Final Design-East Grand Improvements,Phase I 13 <br /> 3.0 Final Design-East Grand Improvements,Phase 2 16 <br /> 4.0 Construction Support Services—East Grand Improvements,Phase 1 18 <br /> 5.0 Construction Support Services—East Grand Improvements,Phase 2 20 <br /> 6.0 Project Management/Administration—East Grand Improvements,Ph 1 &2 21 <br /> 7.0 Analysis and Preliminary(30%) Design 22 <br /> 8.0 Final Design—CSO Reduction at SRO2 25 <br /> 9.0 Construction Support Services—Hayes Street CSO Reduction,SRO2 31 <br /> 10.0 Supporting Analyses.Tasks—Hydraulic Model and CSO Reduction 32 <br /> 11.0 Project Mgmt,Coordination, and Adm. -Hayes Street CSO Reduction 32 <br /> 12.0 Unanticipated Tasks Budget 33 <br /> 13.0 Budget Adjustments for Previous Authorized Tasks 34 <br /> 14.0 Final Design/Construction Assistance-Hayes Street CSO Reduction,SRO1 35 <br /> Sewer System Replacement and Capacity Improvements Project 1 <br /> otak <br /> K\project\31500\31520\Contract\.Amend4\AmendFour\AmendmentFour021413.docs <br /> 2 <br />