I <br /> Hayes Street CSO Reduction (at SRO I and SRO2) <br /> The previous Hayes Street CSO reduction analysis,prepared by consultant and presented to the City <br /> in Technical Memorandum,"Hayes Street CSO Reduction",dated April 12,2011,evaluated four <br /> alternatives to reduce CSOs at SRO2.The results of this analysis recommended increasing the <br /> capacity of the existing conveyance pipe from the Hayes Street SRO2 outfall regulator-structure to <br /> the Siphon Headworks. (Refer to Figure 2) <br /> Subsequently,to insure the recommended Hayes Street SRO2 improvements provide adequate <br /> capacity to convey combined sewer flows when upstream improvements are implemented to reduce <br /> CSO overflow at adjacent outfall SRO1,additional hydraulic analysis was requested by the City.This <br /> analysis updated the city's hydraulic model and identified potential options to reduce the CSO <br /> overflows at outfall SRO1 and verify that the recommended alternative for the Hayes Street <br /> combined sewer system is adequate to convey flows to the Water Pollution Control Facility without <br /> exceeding the CSO overflows frequency allowed by state law.This analysis and options were <br /> presented to the City in Technical Memorandum"SRO1 CSO Reduction Alternatives",dated March <br /> 5,2012,which identified four(4)possible solution: 1) stormwater separation,2) detention of <br /> combined sewer flows,3)new lift station to handle LS#9 excess flows,and 4)new lift station to <br /> handle LS#9 excess flows and future overflows at SRO3. <br /> The scope of services in this amendment for the Hayes Street CSO Reduction (at SRO1 and SRO2) <br /> Improvements provided for: <br /> • <br /> • Performing hydraulic analysis,determine alignment options,and develop conceptual <br /> design/construction costs for additional alternatives from the Hayes Street SRO2 outfall <br /> regulator-structure to the Siphon Headworks,based on the new approach of maximizing the <br /> conveyance capacity to the Siphon Headworks. <br /> • <br /> • Prepare a preliminary design report comprising: 1)preliminary design of the preferred alternative <br /> for CSO Reduction Improvements for SRO2,and 2)preliminary design of the CSO Reduction <br /> Improvements for SRO1,based on Solution Element#3"new lift station to handle LS#9 <br /> excess flows,"identified in technical memorandum dated March 5,2012. <br /> • Performing final design and prepare construction documents (plans;specifications,and cost <br /> estimates) for bid package"Hayes Street CSO Reduction at SRO2"for improvements between <br /> SRO2 outfall regulator-structure and the Siphon Headworks.Services include support for <br /> assistance with Public Involvement and Construction Assistance. <br /> • Perform additional analyses and support,when requested by the city,relative to overall CSO <br /> reduction program for outfalls SRO1 and SRO2 and coordination/data sharing related to the <br /> Sewer System Replacement and Capacity Improvements Project 5 <br /> otak <br /> K\project\31500\31520\Contract\Amend4\AmendFou=\AmendmentFouc021413.doce <br /> 6 <br />