My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2206 TOWER ST EVCC HEALTH AND FITNESS CENTER 2018-01-01 MF Import
>
Address Records
>
TOWER ST
>
2206
>
EVCC HEALTH AND FITNESS CENTER
>
2206 TOWER ST EVCC HEALTH AND FITNESS CENTER 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2019 1:33:34 PM
Creation date
11/19/2019 12:06:41 PM
Metadata
Fields
Template:
Address Document
Street Name
TOWER ST
Street Number
2206
Tenant Name
EVCC HEALTH AND FITNESS CENTER
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
423
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SRG Partn�rship, Inc. � <br /> %�f K 1 b ZOO9 NOTICE OF FINAL ,.:. <br /> MITIGATED DETERMINATION OF NON-SIGNIFICANCE <br /> SEPA A�09-001 <br /> Everett Communiry College Fitness and Health Center <br /> And SurFace Parking Lot(Topper Motei Site) <br /> April 15, 2009 <br /> Description of Proposal: The proposed heakh and�tness center will be located on <br /> campus immedtately east of the new transit center on an existing surface parking lot. <br /> Aclive areas within the 49,819 square foot facflity will include a gymnasium, climbing <br /> wali, fit�ess and weight room, an indoor running track, and multi-purpose room. ln <br /> addition,t:�ere will be support facilities including offices, meeting rooms, locker rooms <br /> and other common spaces. The major change in programs is that the new facility will <br /> include an indoor track and that the baseballlsoccer field and tennis courts wili not be <br /> replaced. All ECC baseball and soccer team practicea and games will be held off- <br /> campus. As part of the Phase III expa�sion for the Everett Community College, the <br /> appflcant is also proposing construction of a surface parking lot (�05 stalls) at 1030 <br /> Broadway Avenue. NOTE: Construction of the Heaith and Fitness Center and the Topper <br /> Parking Lot will result in a net i�crease of 85 parking stalls. <br /> P.pplicant: Everett Community College <br /> 2000 Tower Streel <br /> Everett, WA 98201 <br /> Representative: SRG Partnership, Inc. <br /> 701 Yesler Way, S�ite 200 <br /> Seattle, WA 98104 <br /> Location: 2000 Tower Street (Health and Fitness Center) <br /> 1030 Bruadway (Topper Motel site, Surface Parking Lot) <br /> Zoning: B-2-I, Institutional Overiay <br /> General Plan: 2.2, CollegeslUniversities <br /> Lead Agency: Ciry of Everett Planning Department <br /> Conlact Person: Faheem Siddiq Fhone: (425) 257-7142 <br /> Mitiqation Measures: <br /> The environmental impacts of this proposal are documented in the Env�ronmental Checklist and <br /> other in(ormation on file with lhe Cily. The lisled requirements are placed in response to our <br /> review of this inforrnation: <br /> AGENCIES WITH JURISDICTION <br /> None <br /> �� <br /> �y� � <br />
The URL can be used to link to this page
Your browser does not support the video tag.