Laserfiche WebLink
! <br /> I • Temporary onsite conveyance and temporary sediment trapping will be provided onsi[e to <br /> prevent sediments from leaving site. The sediment trap was wkulated as per <br /> I Section 2-5.6 of the City of Everett Stormwate�Management Manua/(sediment trap <br /> calculations are included below). <br /> � . The project shall be phased as follows: <br /> IConstruction Seauence: <br /> i1. Arrange for and attend pre-construction meeting with the City of Everett. <br /> 2. Flag or fence clearing limits. <br /> i <br /> I3. Construct construction entrance. <br /> 4. Install temporery silt fence. <br /> I5. I�stall catch basin iniet protection on all existing basins to remain that wiil be <br /> affected by mnstruction. <br /> f6. Commence with demolifion of existing site features to be removed. <br /> I 7. C x and grade site. <br /> 8. Construct temporary sediment trap. <br /> I 9. Maintain erosion control measures as site work progresses, in accordance with City <br /> of Everett standards. Relocate ESC measures or install new measures as site <br /> mnditions warrant. <br /> ( 10. Cover all areas that will be unworked for more than 7 days during the dry season <br /> and 2 days during the wet season with straw, wood fiber mulch, compost, plastic <br /> I sheeting, or equivalent. <br /> 11. Seed or sod areas to remain unworked for more than 30 days. <br /> I12. All ESC measures shall remain until the site Is completely stabilized. <br /> I <br /> I <br /> � Stortnwater Site P.an OQOO <br /> Everett Community College � <br /> Rtness Cen[er 4 <br /> � 208221.10 <br /> 7 <br />