Laserfiche WebLink
Project: Everett Downtown Streetscape Improvement <br /> Change Order No.1 <br /> Change Order Effective Date: October 16, 2019 <br /> Costs of Change Order No. 1 by Schedule <br /> • Schedule A: $ 88,798.25 <br /> • Schedule B: $ 28,407.00 <br /> • Schedule C: $131,010.00 <br /> • Schedule D: $37,950.00 <br /> • Schedule E: $50,850.32 <br /> • Total Cost: $337,015.57 <br /> Contract Time <br /> There is no adjustment to the Contract, as a result of Change Order No. 1. <br /> Page 7 of 7 <br />