Laserfiche WebLink
-i . • ,JNAE: N. REIO <br />. LEROY F. MIDOLEtON <br />� C. W�YNE JONES <br />LLOYD H. NELSON <br />��� �t�����yy p[ ��, %GLC, ENGINEERS • SURVEYORS • PLANNERS <br />324 Main SVect • Edmondf. WashinR{or 980'.0 ��20E` 775•?-034 <br />March 24, 1978 <br />Mr. Charles Christianson <br />Cruise-A-fiome, Inc. <br />1028 Norton Av6nua <br />Everett, Washington 95201 <br />Subject: Access and Utility Easement for Everett BoaC Launch Facility <br />Dear Mr. Chrlsttanson: <br />Pursuant to a number of past disc.�;sions on this matter, I�m ,uhmll:llncl <br />herewith an original and two copies of an easement prep2red (or Cruise-A-lio�K: <br />to grant to the Port of Everett the rights to install and maincoin cerCain <br />underground utilities and a paved bike-pedestrian path across Litie narrow <br />northerly tip of Cruise-A-Home property adjacent to Norton Avenue aC thc en� <br />trance to the access way to the EveretL Boat Launch F_:.ility, being Joint:ly <br />sponsored by the Port of Everett, the C.ity of Everett, Snohc�nish County, and <br />the Washington State Inier-Agency Committee for Outdoor RecreaCion, wlth Che <br />Port aceing as the construction agency. <br />The area to be covered by this easement is indicated in orange shading <br />on both [he legal size Dwg. 7•90S/CA2 (inCended to be recorded in conjuncl:ion <br />with the written easement form), and [he larger scale Dwc. %.9U5/Gh3. f�raw��, <br />ing A2 depicts the requested easement with respect to Horton Avenue, Cruise- <br />A-Home property lines (as derived from review and analysis by RMA sur��ey <br />department), the access easement obtained by the Port within Summit Timber <br />Company pr.oer[y contiguous to that company's south property line, the DN <br />Railway ComFa�w rail siding, and the concrete slab utiTized for operal:ions <br />by Cruise^A-Nome. Drawing A3 Jepicts [he location of the proposed undergroui��f <br />utilities and paved bike path for which [he easement is being requesled, <br />Dwg. 7.9�i5./CA3 a�so depicts in 9reen an area lying within the access. <br />easement. obtaineu `rom Summit Timber G��mpany ��hich the PorL �rill agree L'o <br />exclude from devalopment plans and future use for tha Bo�C l�unch proJect, <br />in order to free this area from potential interference with observed present: <br />Cruise-A-Nome improvements, occupancy and ac[ivi[ies �oithin that area. IC <br />is our understanding that [he Por[ Manager witl address a letter to thaC <br />effect to you shortly. <br />We anticipate award of contract for the contemplaCed Boat Launcli <br />MUNICIP/�L ENGINEERING •\VATER SUPPLY • 1VASTE TF.EATA7ENT • SUFVEYS L C/�D�STR�L ENGINEERING <br />AIRPORT PLAMr��•' "+INAS • PORT G �NDUSTRIAL DEVF� ^" ' STUOIES <br />