My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013/06/12 Council Agenda Packet
>
Council Agenda Packets
>
2013
>
2013/06/12 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/26/2019 10:47:43 AM
Creation date
11/26/2019 10:45:57 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
6/12/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TASK 6: UTILITIES COORDINATION& DESIGN <br /> TranTech subconsultant, MSA,will provide engineering services for final design,bidding phase <br /> and construction support services for a 12-inch diameter water main and multiplefranchised <br /> utility improvements associated with the replacement of the Broadway Bridge crossing between <br /> Hewitt Avenue and California Street. <br /> This task includes the following subtask activities: <br /> 1. Coordination and Project Management <br /> The work under this subtask includes the following subtasks: <br /> a. Project Coordination -This task is for general coordination of the Utility Design <br /> work. This includes coordination of the MSA team with TranTech's Project Manager <br /> including meetings, correspondence, communication and weekly status reports. <br /> b. Project Meetings-Coordinate and participate in an initial kick-off meeting with <br /> TranTech and City of Everett staff and attend project coordination meetings as <br /> necessary. It is anticipated that MSA's project manager and staff engineer will attend <br /> one weekly coordination meeting per month, up to fifteen(15)meetings,with <br /> TranTech. <br /> c. Invoicing-Prepare monthly billings and progress reports describing services <br /> provided and completed in each billing period. Prepare,monitor and update MSA's <br /> project schedule. <br /> 2. Final PS&E Design Package <br /> This work under this subtask will include development of plans and specifications for the <br /> 100% level of design and the final design suitable for bidding for the proposed water <br /> main and utility improvements. Plans and specifications will be provided in electronic <br /> format to TranTech to be included in the project submittals. Drawings will be provided <br /> per City Standards in AutoCAD format and specifications will be per WSDOT Standards <br /> in Microsoft Word format. <br /> 3. Bidding Phase Services <br /> This work under this subtask will include providing engineering support services to the <br /> City during the bidding phase period of the Project. <br /> 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.