My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013/06/12 Council Agenda Packet
>
Council Agenda Packets
>
2013
>
2013/06/12 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/26/2019 10:47:43 AM
Creation date
11/26/2019 10:45:57 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
6/12/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> TASK 9: CIVIL/ROADWAY/TRAFFIC DESIGN <br /> This Task will be performed by TranTech's.subconsultant Perteet to provide Civil/Roadway/ <br /> Traffic services. <br /> 1. PS&E PREPARATION <br /> Design team will prepare Bid Ready Final PS&E, specifications, and engineering cost <br /> estimates for the project based on the draft 100%design. Current City of Everett design <br /> standards shall be used. The activities include the following subtasks: <br /> a. Temporary Traffic Control/Detour Plans <br /> The design team will prepare Temporary Traffic Control/Detour Plans to support the <br /> full closure construction concept. The Traffic control plans will include site specific <br /> traffic control devices as well as signs and striping. <br /> A regional detour plan will be prepared to support the detour, encourage the use of <br /> alternate routes and provide advance warning for regional commuters/drivers. <br /> b. Ped/Bike Signal Plans <br /> The design team will prepare signal plans for a pedestrian/bicycle only signal at the <br /> intersection of California and Broadway. The team will prepare a signal plan,notes, <br /> schedules, and wiring schematics as necessary to cover all generic and site specific <br /> details as needed. The 100%submittal will include pole and, signal head indications <br /> and controller equipment location for review. <br /> c. Quantity Estimate and Opinion of Cost <br /> The design team will develop a quantity estimate and a resultant opinion of cost based <br /> on major elements quantity calculations. <br /> d. Bidding Phase Services <br /> This work under this subtask will include providing engineering support services to <br /> the City during the bidding phase period of the Project. <br /> Deliverables: <br /> 1. One full sized signed original plan set at Final <br /> 2. Special Provisions <br /> 3. One copy of the quantity estimate and opinion of cost. <br /> 4. All calculations(illumination, drainage,etc.) <br /> 5. Complete AutoCAD and/or Civil 3D electronic drawing files <br /> 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.