Laserfiche WebLink
1 <br /> TASK 12: CONSTRUCTION ENGINEERING SUPPORT <br /> This work under this subtask will include providing engineering support services to the City <br /> during the construction phase of the Project. <br /> The construction engineering support includes review of and response to Contractor RFIs and <br /> Submittals,providing engineering design team support to City construction managers,review of <br /> and response to proposed design revisions or change order proposals, and general engineering <br /> support during the construction phase. <br /> TASK 13: CONSTRUCTION MANAGEMENT SERVICES(Optional; Not Included in <br /> this Supplemental Agreement) <br /> TranTech's team possesses a highly experienced and qualified CM team.In case the City desires, <br /> TranTech can provide CM services for this project. <br /> The following are the categorized activities associated with this Task: <br /> Pre-con Meeting,Providing Full-time Construction Project Manager for all aspects of <br /> construction activity including oversight of contractors and subcontractors,quality control, safety <br /> compliance,managing project changes,budget,and schedule.Provide continuous project <br /> management throughout the construction duration.This includes management of staf <br /> subconsultants, and preparation for monthly invoices and progress reports;provide full-time <br /> senior inspectors(except when City Inspector is on team)to track quantities,daily inspection <br /> reports,etc.;Provide Full-time/part-time assistant inspector,as workload requires.;Review and <br /> respond to unanticipated conditions that occur during construction;Review requests to change or <br /> modify the work shown in the plans and specifications.Also provide recommendations to <br /> resolve the issue;prepare as-built drawings;and material testing <br /> It is anticipated that the construction management requires a'/4 time PM, 1/4 time traffic control <br /> inspector,2 full time construction inspectors and a full time documentation staff during the <br /> construction phase. <br /> Deliverables: <br /> • Progress Reports;Inspection Daily Reports; Submittal Reviews;RFI Reviews; <br /> Monthly Pay Estimates;Change Management;Record of Materials;Pre-con and <br /> Construction Photos;Testing and Lab Report reviews;Red-line As-built;Close-out <br /> • <br /> 11 <br />