Laserfiche WebLink
WWashington State <br /> I' Department of Transportation <br /> Organization and Address <br /> Supplemental Agreement TranTech Engineering,LLC <br /> Number 2 12011 NE 1st Street,Suite 305 <br /> Bellevue,WA 98005 <br /> Original Agreement Number <br /> PW3395 Phone: 425-453-5545 <br /> Project Number Execution Date Completion Date <br /> 12/23/2010 12/31/2015 <br /> Project Title .New Maximum Amount Payable <br /> Broadway Bridge Replacement Project $ 1,969,974.00 <br /> Description of Work <br /> Supplement Number 2 will advance the project to final design,construction documents,bid support services,and <br /> construction phase engineering support. <br /> • <br /> • <br /> The Local Agency of City of Everett <br /> • <br /> desires to supplement the agreement entered into with TranTechEngineering,LLC <br /> and executed on 12/23/2010 and identified as Agreement No. PW3395 <br /> All provisions in the basic agreement remain in effect except as expressly modified by this supplement <br /> The changes to the agreement are described as follows: <br /> Section 1,SCOPE OF WORK, is hereby changed to read: <br /> See attached'Exhibit A -Scope of Work-Supple"j 2 <br /> I I <br /> Section IV,TIME FOR BEGINNING AND COMPLETION, is amended to change the number of calendar days for <br /> completion of the work to read: Agreement completion date 17/310.015 <br /> III <br /> Section V, PAYMENT, shall be amended as follows: <br /> See attached Fxhihit R-Supplement 7-PaNnent Total maximum Agreement amount-S1,969,974 00 <br /> • <br /> as set forth in the attached Exhibit A,and by this reference made a part of this supplement. <br /> If you concur with this supplement and agree to the changes as stated above, please sign in the appropriate spaces <br /> below and return to this office for final action�.� <br /> By: TranTec En ' --{4-( By: City of F.verett <br /> Con Signature Approving Authority Signature <br /> DOT Form 740-063 EF Date <br /> Revised 9/2005 <br /> 2 <br />