My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013/06/12 Council Agenda Packet
>
Council Agenda Packets
>
2013
>
2013/06/12 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/26/2019 10:47:43 AM
Creation date
11/26/2019 10:45:57 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
6/12/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> been successful in securing federal funds for engineering and construction to replace the <br /> deteriorated Bridge structure. <br /> Per City of Everett directive,TranTech assembled a team to perform an Alternative Study Report <br /> (i.e., Phase I) and advance the design to Draft Final Bid Ready Construction documents (i.e., <br /> Phase II) for the Broadway Bridge Replacement Project. TranTech's team submitted the Draft <br /> Bid Ready construction documents in April 2013. <br /> Recently,the City has requested TranTech's team to provide a Scope and Budget for Phase III of <br /> the Project which will advance the Project to Final Bid Ready construction documents and <br /> include Bidding Phase Support and Construction Phase Support. <br /> TranTech's team is composed of the following consultants: <br /> Perteet, Inc—Survey/Roadway/Traffic/Civil/Permitting/Public Involvement <br /> Hong West and Associates—Geotechnical and Hazmat <br /> Makers,Inc—Urban Design and Aesthetics <br /> Murray, Smith and Associates, Inc.—Utility design and Coordination <br /> Ott Construction Consultants—Constructability and Estimation <br /> MCR—BNSF Coordination <br /> TranTech—Project Management/Structural <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.